HLTPAT006 - AT2 Observation
STUDENT INSTRUCTION
You will be observed by your assessor in a simulated environment performing a task to the required standard as outlined in the appropriate unit of competency. This will involve the use of a role play or case study to establish the context for assessment and this specific information will be provided by your assessor prior to the assessment taking place.
It is important ensure you read and understand all observable criteria for the associated demonstration including role plays or scenarios on which you will be observed. If any point is unclear please seek clarification from your Assessor. Please ensure you are familiar with the key criteria your assessor will be looking for during the assessment process.
Assessment Conditions
The below Observation Assessments
will be undertaken in a Simulated Pathology Collection Centre
. Please refer to Learner and Assessment Guide for a full list of Resources provided. These Assessments will be completed during class time and your Assessor will provide the required PPE prior to the assessment taking place. Each Assessment will take approximately 5 - 10 minutes and your Assessor will ensure you are aware
of the Assessment time prior. There may be occasions when the proposed assessment date is altered based on the number of students in a group. Your assessor will coordinate this for you. You will be provided with the below equipment as required to undertake the Assessment task.
pipettes
aliquot pots
personal protective equipment (PPE)
contaminated waste disposal
fridge
dryer
temperature controls
HLTPAT006 - AT2 Observations - Specimen 1
UNIT/S OF COMPETENCY Title
Student Name Student Number Student Signature Assessment Date
Assessment Location
Assessment Time
Description of the task to be observed:
Task: At the end of this practical the student is expected to successfully demonstrate the correct Aliquoting procedure as demonstrated in class.
Specimen 1:
You are required to aliquot a sample from an SST/GEL tube for transportation.
HLTPAT006 - AT2 Observation
Though very few SST tubes require you to spin and aliquot, this observation demonstrates your understanding of requirements associated with aliquoting. In this scenario there are no specific transport requirements
During the activity, the student is required to satisfactorily demonstrate required skills though completion of the observable task/s. Observable Task Assessment Criteria
MR
FER
O1.1 Handling of the specimen Ensure specimen is fully clotted.
Ensure correct balancing of centrifuge
Ensure centrifuge is set for correct speed/time
O1.2 Safety Demonstrate correct usage of safety equipment
Demonstrate correct labelling of aliquot tube
Demonstrate correct and safe aliquoting of specimen
O1.3 Recording Equipment is disposed of in a safe manner
Prepare specimen for transport appropriate to the above test requested.
Read and record the specimen fridge mean daily max: mean daily min: current temp:
Q4 What is the minimum time for an SST to allow to clot?
Q5 a What speed (RPM) is a centrifuge set at?
Q5b What time (min) will a centrifuge run for? Q6. What minimum PPE is required when completing this procedure?
Q7 Apart from minimal labelling requirements, what other information is necessary for this aliquot tube
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Please give a detailed answer. Thank you
arrow_forward
Describe four basic issues that should be considered prior to selection of an evaluation procedure.
arrow_forward
Fred and Martina, senior agents at an airline security checkpoint, carry out advanced screening procedures for hundreds of randomly selected passengers per day. For a random sample of 30 passengers recently processed by Fred, the mean processing time was 124.5 seconds, with a standard deviation of 20.4 seconds. For a random sample of 36 passengers recently processed by Martina, the corresponding mean and standard deviation were 133.0 seconds and 38.7 seconds, respectively. Using the 0.05 level of significance, can we conclude that the population mean processing times for Fred and Martina could be the same? Use Unequal-Variances T-Test.
arrow_forward
Problem 1 (20%)
The Haddon Matrix is a used commonly used, two-dimensional model used to analyze safety through
three phases of a crash (pre-crash, crash, post-crash). The matrix provides insight into the range of
possible safety issues that may have led to the crash and helps engineers propose appropriate safety
countermeasures.
Pre-Crash
Crash
Post-Crash
Haddon Matrix
Human
Vehicle
Physical
Environment
Use the following crash to fill out a Haddon Matrix:
A single vehicle crashed on I-84 west in Willington at 1:38pm in March of 2024. The weather conditions
for that day were rainy, leading to wet road surfaces and poor visibility. The driver of the 2015 Dodge
Charger was speeding when he lost control of the vehicle and crashed into the center median. The vehicle
had "disabling damage" and the driver remained on scene until emergency services arrived. Investigators
say that the vehicle had "bald tires" at the time of the crash.
Additional crash information can be found here:…
arrow_forward
Which of the following are not sources of errors?
O a. Personal
O b. Environmental
O c. Simulation
O d. Factory Instrument
arrow_forward
Q5/ The structural engineering design section within the engineering
department of a regional electrical utility corporation has developed
several standard designs for a group of similar transmission line towers.
The detailed design for each tower is based on one of the standard designs.
A transmission line project involving 50 towers has been approved. The
estimated number of engineering hours needed to accomplish the first
detailed tower design is 126. Assuming a 95% learning curve,
a. What is your estimate of the number of engineering hours needed to
design the eighth tower and to design the last tower in the project?
b. What is your estimate of the cumulative average hours required for the
first five designs?
arrow_forward
Indicate whether the following statements are true or false.
The quality of a visual inspection is affected primarily by; i) The quality of the detector (eye or
camera), ii) The lighting conditions, iii) The capability to process the visual data, iv) The level of
training and attention to detail
Visual inspection is a very simple and basic method; therefore, it is not considered as one of
the commonly employed NDT methods.
The two phases involved in applying the maturity method to estimate the in-situ strength of
concrete are i) Laboratory testing and ii) Field measurement of the in-place temperature
history
Optical aids such as mirrors, magnifiers and comparators are often used as a tool of visual
inspection.
The most popular nondestructive test used on concrete structures is the rebound hammer
test.
The two parameters needed in the Nurse-Saul Maturity Function is Apparent Activation
Energy and Datum Temperature.
Visual inspection is simple to perform, low in cost and relatively…
arrow_forward
The project schedule is shown below. Illustrate and do the Forward & Backward pass and answer the ff:
ACTIVITY
PPREDECESSOR
DURATION (days)
A
3
B
A
6
A
B
C
D
D, E
H
G, F
At what day is the Early Finish for Activity A?
Select the correct response:
Day 3
Day 14
Day 42
None of the choices
C
D
E
F
G
3
2
7
8
5
3
arrow_forward
A highway bridge is currently scheduled to be inspected once every two years. There is a 3% probability that during an inspection a major defect will be found. Compute the probability that in the next 12 years no defects will be found in the bridge. Assume statistical independence concerning finding defects in different inspections.
arrow_forward
In a CPM network, the critical path has five activities. Their durations are
tabulated next.
Duration
Activity
Optimistic (To)
Most Likely (Tm)
Pessimistic (Tp)
A
2
5
9
B
3
4
8
C
4
6
9
D
5
10
20
E
3
5
9
Compute the following:
The probability that the project will finish by the end of day 32
The probability that the project will finish by the end of day 34
The probability that the project will finish before day 30
The probability that the project will finish on day 32
The probability that the project will finish no later than day35
The probability that the project will finish at least 2 days early
The probability that the project will finish at least 2 days late
The probability that the project will finish on day 32 ±1 day
The completion date with at least a 90% confidence level
arrow_forward
Clear solutions, box the finals answer and answers should be in 5 decimal places
arrow_forward
Directions: Calculate the following measure of position. (Ungrouped Data)
Scores in a summative test of 20 Grade 10 learners in Mathematics.
12, 38, 44, 50, 22, 23, 43, 25, 19, 16,
34, 40, 23, 25, 26, 27, 38,
35, 21, 44,
1. 1st Quartile (Q₁)
2. 6th Decile (DG)
3. 75th Percentile (Prs)
arrow_forward
The project schedule is shown below. Illustrate and do the Forward & Backward pass and answer the ff:
ACTIVITY
PPREDECESSOR
DURATION (days)
A
5
B
A
8
B
6
B
3
7
2
1
C
D
E
LL
G
What is the Critical path?
Select the correct response:
Path ABDG
Path ABCEFG
Path ABDFG
None of the choices
C
D, E
F
LL
arrow_forward
Aim of the coursework
Identify and determine the scope of hazardous substances
Understanding the risk assessment procedure
Develop skills in recognizing hazards
Learning Outcomes
Identify and differentiate the kinds of hazardous substances.
Conduct hazard analysis
List simple safety procedures and precautions to save any process.
Task:
You are expected to carry out a risk assessment in your own college/lab/workshop.
Name of assessor – put any name.
Date – put any date of the assessment.
Time – put any time of the assessment.
Work area – briefly describe the work area in terms of function, size, number of floors, number of
people.
For example: Ground floor warehouse, 900 square metres with up to 50 people.
Task being assessed – Be specific, e.g. Use of forklift truck to move goods from loading bay to racking.
You need to select FOUR hazards that are not being adequately controlled.
Common hazards include:
Working at height (e.g. working at height on a ladder 3 metres high)
Manual…
arrow_forward
Q 01:
a) Define lead and lag with examples.
b) Differentiate between task dependent and resource dependent activities in primavera.
Subject:Transportation engneering 2 lab
Note: Write to the point answer each part
arrow_forward
a) Identify the purpose of the Proctor Test.
b) List the necessary equipment to conduct a Standard Proctor Test.
c) Outline the steps to conduct this test.
D] Identify any observed phenomena during the Standard Proctor Test.
arrow_forward
The following is a series of questions pertaining to the NSPE Code of Ethics. Please indicate whether the statements are true or false. These questions are provided by the NSPE.
Note: This ethics test is intended solely to test individual knowledge of the specific language contained in the NSPE Code of Ethics and is not intended to measure individual knowledge of engineering ethics or the ethics of individual engineers or engineering students.
Engineers having knowledge of any alleged violation of this Code, following a period of thirty days during which the violation is not corrected, shall report thereon to appropriate professional bodies and, when relevant, also to public authorities, and cooperate with the proper authorities in furnishing such information or assistance as may be required.
arrow_forward
8) According to ASTM CI50, initial setting time needs to be longer than 45 minutes and
tmal setting time needs to be shorter than 375 minutes. Why does initial setting have a lower
(time) limit and final setting have an upper limit?
arrow_forward
OSHA Subject ( give sample answer ) 5 lines
arrow_forward
Civil engineering 2 Practice questions.
arrow_forward
Identify the types of failures shown.
arrow_forward
Problem 2.
Draw the PERT-CPM diagram for the list of activities shown using
Backward Pass calculation. Indicate the Late Start and Late Finish of
each activity in the diagram. (Hand written)
Activity Immediate Expected
Predecessors Duration
(weeks)
A
B
C
D
E
F
G
H
I
J
B
A, C
D
C
F
F
B
H, E, G
3
5
3
4
8
12
4
253
arrow_forward
OSHA Subject ( give sample answer ) 5 lines
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Residential Construction Academy: House Wiring (M...
Civil Engineering
ISBN:9781285852225
Author:Gregory W Fletcher
Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Related Questions
- Please give a detailed answer. Thank youarrow_forwardDescribe four basic issues that should be considered prior to selection of an evaluation procedure.arrow_forwardFred and Martina, senior agents at an airline security checkpoint, carry out advanced screening procedures for hundreds of randomly selected passengers per day. For a random sample of 30 passengers recently processed by Fred, the mean processing time was 124.5 seconds, with a standard deviation of 20.4 seconds. For a random sample of 36 passengers recently processed by Martina, the corresponding mean and standard deviation were 133.0 seconds and 38.7 seconds, respectively. Using the 0.05 level of significance, can we conclude that the population mean processing times for Fred and Martina could be the same? Use Unequal-Variances T-Test.arrow_forward
- Problem 1 (20%) The Haddon Matrix is a used commonly used, two-dimensional model used to analyze safety through three phases of a crash (pre-crash, crash, post-crash). The matrix provides insight into the range of possible safety issues that may have led to the crash and helps engineers propose appropriate safety countermeasures. Pre-Crash Crash Post-Crash Haddon Matrix Human Vehicle Physical Environment Use the following crash to fill out a Haddon Matrix: A single vehicle crashed on I-84 west in Willington at 1:38pm in March of 2024. The weather conditions for that day were rainy, leading to wet road surfaces and poor visibility. The driver of the 2015 Dodge Charger was speeding when he lost control of the vehicle and crashed into the center median. The vehicle had "disabling damage" and the driver remained on scene until emergency services arrived. Investigators say that the vehicle had "bald tires" at the time of the crash. Additional crash information can be found here:…arrow_forwardWhich of the following are not sources of errors? O a. Personal O b. Environmental O c. Simulation O d. Factory Instrumentarrow_forwardQ5/ The structural engineering design section within the engineering department of a regional electrical utility corporation has developed several standard designs for a group of similar transmission line towers. The detailed design for each tower is based on one of the standard designs. A transmission line project involving 50 towers has been approved. The estimated number of engineering hours needed to accomplish the first detailed tower design is 126. Assuming a 95% learning curve, a. What is your estimate of the number of engineering hours needed to design the eighth tower and to design the last tower in the project? b. What is your estimate of the cumulative average hours required for the first five designs?arrow_forward
- Indicate whether the following statements are true or false. The quality of a visual inspection is affected primarily by; i) The quality of the detector (eye or camera), ii) The lighting conditions, iii) The capability to process the visual data, iv) The level of training and attention to detail Visual inspection is a very simple and basic method; therefore, it is not considered as one of the commonly employed NDT methods. The two phases involved in applying the maturity method to estimate the in-situ strength of concrete are i) Laboratory testing and ii) Field measurement of the in-place temperature history Optical aids such as mirrors, magnifiers and comparators are often used as a tool of visual inspection. The most popular nondestructive test used on concrete structures is the rebound hammer test. The two parameters needed in the Nurse-Saul Maturity Function is Apparent Activation Energy and Datum Temperature. Visual inspection is simple to perform, low in cost and relatively…arrow_forwardThe project schedule is shown below. Illustrate and do the Forward & Backward pass and answer the ff: ACTIVITY PPREDECESSOR DURATION (days) A 3 B A 6 A B C D D, E H G, F At what day is the Early Finish for Activity A? Select the correct response: Day 3 Day 14 Day 42 None of the choices C D E F G 3 2 7 8 5 3arrow_forwardA highway bridge is currently scheduled to be inspected once every two years. There is a 3% probability that during an inspection a major defect will be found. Compute the probability that in the next 12 years no defects will be found in the bridge. Assume statistical independence concerning finding defects in different inspections.arrow_forward
- In a CPM network, the critical path has five activities. Their durations are tabulated next. Duration Activity Optimistic (To) Most Likely (Tm) Pessimistic (Tp) A 2 5 9 B 3 4 8 C 4 6 9 D 5 10 20 E 3 5 9 Compute the following: The probability that the project will finish by the end of day 32 The probability that the project will finish by the end of day 34 The probability that the project will finish before day 30 The probability that the project will finish on day 32 The probability that the project will finish no later than day35 The probability that the project will finish at least 2 days early The probability that the project will finish at least 2 days late The probability that the project will finish on day 32 ±1 day The completion date with at least a 90% confidence levelarrow_forwardClear solutions, box the finals answer and answers should be in 5 decimal placesarrow_forwardDirections: Calculate the following measure of position. (Ungrouped Data) Scores in a summative test of 20 Grade 10 learners in Mathematics. 12, 38, 44, 50, 22, 23, 43, 25, 19, 16, 34, 40, 23, 25, 26, 27, 38, 35, 21, 44, 1. 1st Quartile (Q₁) 2. 6th Decile (DG) 3. 75th Percentile (Prs)arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Residential Construction Academy: House Wiring (M...Civil EngineeringISBN:9781285852225Author:Gregory W FletcherPublisher:Cengage LearningTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Residential Construction Academy: House Wiring (M...
Civil Engineering
ISBN:9781285852225
Author:Gregory W Fletcher
Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning