PROJECT NAME: DESIGN PROJECT 2: Re-Construction of Cantilever bridge CONTRACTOR: South Sydney Construction Pty Ltd DURATION: 5 Years BUDGET: $555 Million SITE LOCATION: Sydney, Australia ACT TASK NO TASK DESCRIPTION TIMELINE BUDGET 1 3 months $200,000 2 $500,000 3 2 months $1,000,000 4 Construction 12 Months $8,000,000 5 3 months $300,000 6 Project Closeout 2 months $200,000 Preliminary Assessments and Planning Detailed Design and Engineering 6 months Procurement and Mobilization Quality Control and Testing
TION PLAN PERSON RESPONSIBLE MONITORING TECHNIQUES Project Manager Engineer,Client Architects, Engineers, Project Manager Conduct Site Inspection and Survey Environmental Impact Assessment Preliminary Engineering Studies Geotechnical Investigations Obtain Necessary Permits and Approvals Architects, Engineers, Drafter Finalize Bridge Design Structural Analysis and Calculations Material Specifications Develop Construction Drawings Contractor, Project Manager Tendering and Contractor Selection Material Procurement Mobilize Construction Team and Equipment Engineers, Project Manager Demolition and Removal of Existing Structure Foundation and Substructure Construction Superstructure Construction Decking and Surface Application Installation of Safety Measures Inspections and Quality Assurance Structural and Material Testing Adjustments and Corrections Final Inspections and Approvals Handover to Authorities Documentation and Record Keeping Post-Construction Monitoring
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
REMARKS Assessment and Planning: Evaluate the current bridge condition, assess project feasibility, and plan the reconstruction process.. Develop detailed engineering plans, ensuring structural integrity and compliance with standards. Select contractors, procure materials, and mobilize resources for construction. Execute the reconstruction process following the approved plans and specifications. Implement stringent quality control measures to ensure the structural integrity and safety of the reconstructed bridge. Complete final inspections, obtain approvals, and conclude the project with proper documentation.