EBK PRINCIPLES OF OPERATIONS MANAGEMENT
10th Edition
ISBN: 8220102744059
Author: HEIZER
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Concept explainers
Textbook Question
Chapter 7.S, Problem 18P
Using the data in Problem S7.17:
a) What is the break-even point in dollars for proposal A if you add $10,000 installation to the fixed cost?
b) What is the break-even point m dollars for proposal B if you add $10,000 installation to the fixed cost?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
b. What is the expected value for the rezoned apartments, if the rezoning cost is included (but land cost is excluded)?
Note: Do not round your intermediate calculations. Enter your answers in millions rounded to 2 decimal places. Negative
amounts should be indicated by a minus sign.
Expected value
million
c. If the land is rezoned, what should the contractor decide?
O Build shopping center
O Build apartments
d. What is the expected revenue, if the land is not rezoned (excluding the land cost)?
Note: Do not round your intermediate calculations. Enter your answers in millions rounded to 2 decimal places. Negative
amounts should be indicated by a minus sign.
Expected revenue
million
e. What is the expected net profit of entire project, including all applicable costs?
Note: Do not round your intermediate calculations. Enter your answers in millions rounded to 2 decimal places. Negative
amounts should be indicated by a minus sign.
Expected net profit
million
I need help with part c
Please answer in detail
Chapter 7 Solutions
EBK PRINCIPLES OF OPERATIONS MANAGEMENT
Ch. 7.S - Prob. 1DQCh. 7.S - Prob. 2DQCh. 7.S - Prob. 3DQCh. 7.S - Prob. 4DQCh. 7.S - Prob. 5DQCh. 7.S - Distinguish between bottleneck time and throughput...Ch. 7.S - Prob. 7DQCh. 7.S - Prob. 8DQCh. 7.S - Prob. 9DQCh. 7.S - Prob. 10DQ
Ch. 7.S - Prob. 11DQCh. 7.S - Prob. 12DQCh. 7.S - What are the techniques available to operations...Ch. 7.S - Amy Xias plant was designed to produce 7,000...Ch. 7.S - For the post month, the plant in Problem S7.1,...Ch. 7.S - Prob. 3PCh. 7.S - Prob. 4PCh. 7.S - Prob. 5PCh. 7.S - The effective capacity and efficiency for the next...Ch. 7.S - Southeastern Oklahoma State Universitys business...Ch. 7.S - Prob. 8PCh. 7.S - Prob. 9PCh. 7.S - Prob. 10PCh. 7.S - The three-station work cell illustrated in Figure...Ch. 7.S - The three-station work cell at Pullman Mfg., Inc....Ch. 7.S - The Pullman Mfg., Inc., three-station work cell...Ch. 7.S - Prob. 14PCh. 7.S - 10 minutes per unit. Part 2 is simultaneously...Ch. 7.S - Prob. 16PCh. 7.S - Prob. 17PCh. 7.S - Using the data in Problem S7.17: a) What is the...Ch. 7.S - Prob. 19PCh. 7.S - Prob. 20PCh. 7.S - Prob. 21PCh. 7.S - Prob. 22PCh. 7.S - Prob. 23PCh. 7.S - Prob. 24PCh. 7.S - Prob. 25PCh. 7.S - Prob. 26PCh. 7.S - Prob. 27PCh. 7.S - Prob. 32PCh. 7.S - Prob. 33PCh. 7.S - Prob. 34PCh. 7.S - Prob. 35PCh. 7.S - Prob. 36PCh. 7.S - Prob. 37PCh. 7.S - Prob. 38PCh. 7.S - Prob. 39PCh. 7.S - Prob. 1VCCh. 7.S - a capacity expansion plan and a new 11-story...Ch. 7.S - a capacity expansion plan and a new 11-story...Ch. 7 - Ethical Dilemma For the sake of efficiency and...Ch. 7 - Prob. 1DQCh. 7 - Prob. 2DQCh. 7 - Prob. 3DQCh. 7 - Prob. 4DQCh. 7 - Prob. 5DQCh. 7 - Prob. 6DQCh. 7 - Prob. 7DQCh. 7 - Prob. 8DQCh. 7 - Prob. 9DQCh. 7 - Prob. 10DQCh. 7 - Prob. 11DQCh. 7 - Prob. 12DQCh. 7 - Prob. 13DQCh. 7 - Prob. 14DQCh. 7 - Prob. 15DQCh. 7 - Prob. 16DQCh. 7 - Prob. 17DQCh. 7 - Prob. 18DQCh. 7 - Prob. 19DQCh. 7 - Prob. 1PCh. 7 - Usingthedatain Problem 7.1, determinethemost...Ch. 7 - Prob. 3PCh. 7 - Refer to Problem 7.1. If a contract for the second...Ch. 7 - Stan Fawcetts company is considering producing a...Ch. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Metters Cabinets, Inc., needs to choose a...Ch. 7 - Prob. 10PCh. 7 - Nagle Electric. Inc., of Lincoln, Nebraska, must...Ch. 7 - Stapleton Manufacturing intends to increase...Ch. 7 - Prepare a flowchart for one of the following: a)...Ch. 7 - Prepare a process chart for one of the activities...Ch. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 1CSCh. 7 - Prob. 2CSCh. 7 - Prob. 3CSCh. 7 - Process Strategy at Wheeled Coach Wheeled Coach,...Ch. 7 - Prob. 1.2VCCh. 7 - Prob. 1.3VCCh. 7 - Prob. 1.4VCCh. 7 - Alaska Airlines: 20-Minute Baggage...Ch. 7 - Prob. 2.2VCCh. 7 - Prob. 2.3VCCh. 7 - Prob. 2.4VCCh. 7 - Prob. 2.5VCCh. 7 - Prob. 3.1VCCh. 7 - Prob. 3.2VCCh. 7 - Prob. 3.3VCCh. 7 - Prob. 3.4VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- ABC Company has several branches within the city. One of its branches is suffering from declining sales, andmanagement has a range of options:a. Shut down the branch and sell for P5Mb. Undertake a major renovationc. Undertake a cheaper renovationIn the past, 2/3 of renovation have achieved good results, while 1/3 achieved poor results. The major renovationwill cost P4M. Estimates of outcomes are as follows:a. Good results: P13.5M profitb. Poor results: P6.5M profitOn the other hand, there is a more economical renovation option that costs P2M. Estimates of outcomes areas follows:a. Good results: P8.5M profitb. Poor results: P 4M Required: Prepare a decision tree and recommend what action would be taken:a. Shut down the branch and sell for P5Mb. Undertake a major renovationc. Choose the economical optionarrow_forwardAria Acoustics, Incorporated (AAI), projects unit sales for a new seven-octave voice emulation implant as follows: Year Unit Sales 1 74,200 2 87,200 3 106,500 4 98,800 5 67,900 Production of the implants will require $1,800,000 in net working capital to start and additional net working capital investments each year equal to 20 percent of the projected sales increase for the following year. Total fixed costs are $3,800,000 per year, variable production costs are $261 per unit, and the units are priced at $393 each. The equipment needed to begin production has an installed cost of $17,700,000. Because the implants are intended for professional singers, this equipment is considered industrial machinery and thus qualifies as seven-year MACRS property. In five years, this equipment can be sold for about 25 percent of its acquisition cost. The tax rate is 21 percent and the required return is 18 percent. MACRS schedule What is the NPV of the project? Note: Do not round…arrow_forwardCortez Manufacturing intends to increase capacity by overcoming a bottleneck operation by adding new equipment. Two vendors have presented proposals. The fixed costs are $50,000 for proposal A and $75,000 for proposal B. In addition to the proposed fixed costs from the two ve management at Cortez anticipates that they will have to spend $8,000 for installations be completed. The variable cost is $12.00 for A and $11.00 for B. The revenue generated by each unit is $24.00. a) The break-even point in dollars for the proposal by Vendor A = $ (round your response to the nearest whole number). b) The break-even point in dollars for the proposal by Vendor B = $| (round your response to the nearest whole number).arrow_forward
- You work for the Brad's Nailer Company which manufactures three types of nailers: a pneumatic model, the "ProLine", and a cordless model. You have contracted to supply a national retail chain with all three models of nailers. However, Brad's nailer production capability is limited in three departments: production, testing, and packaging. The goal is to maximize your revenue. Your answer will be the number packaging hours to be produced (The number of nailers must be a whole number.) Use Scenario 2arrow_forwardCase Study 2. The Liberty Cbok is a bookstore with three locations near the BS University campus. The bookstore has a program to sell personal computers to incoming freshmen and other students at a significant discount. The bookstore just covers computer costs, with a very small profit margin remaining. Orders come in throughout the summer, many only a few weeks before school starts in the fall, and the computer suppliers has a lead time of at least 6 weeks for delivery. Thus, the bookstore must forecast computer demand to build up inventory to meet student demand in the fall. The bookstore has a warehouse near campus where it must store all computers because it has no storage space at its retail locations. The number of computers ordered has effect to the number of temporary warehouses needed and workers who must be hired for handling and PC installations assistance. To get the forecast of computer sales the manager gets the computer purchase program for 14 years. Computer sales have…arrow_forwardNeed alllarrow_forward
- See picture for question details.arrow_forwardYou are a project manager in the water and sanitation department in Johannesburg. The suburb of Soweto has recently come into the spotlight due the lack of water reticulation in the southern part. Residents have approached the president of South Africa to voice their discontent. The president has met with the mayor of Johannesburg and indicated that the water infrastructure needs to be built and ready for service in six months’ time. There cannot be any slippage to the timeline, must deliver within budget, with the resources allocated and within the predetermined quality standards. As a project manager, your mandate is to work with all stakeholders to deliver or risk losing your job. For a project to be successful, one of the critical requirements is that the project manager needs to possess the right skills. Demonstrate in your discussion the soft skills and hard skills that you as a project manager has, to make you a key success factor for this project.arrow_forwardYou are a project manager in the water and sanitation department in Johannesburg. The suburb of Soweto has recently come into the spotlight due the lack of water reticulation in the southern part. Residents have approached the president of South Africa to voice their discontent. The president has met with the mayor of Johannesburg and indicated that the water infrastructure needs to be built and ready for service in six months’ time. There cannot be any slippage to the timeline, must deliver within budget, with the resources allocated and within the predetermined quality standards. As a project manager, your mandate is to work with all stakeholders to deliver or risk losing your job. Use the root cause identification method (cause and effect) to identify the root causes of your project risks. Demonstrate your understanding of root cause analysis by presenting a diagram. Ensure that each root cause presented is discussed in detail.arrow_forward
- You are a project manager in the water and sanitation department in Johannesburg. The suburb of Soweto has recently come into the spotlight due the lack of water reticulation in the southern part. Residents have approached the president of South Africa to voice their discontent. The president has met with the mayor of Johannesburg and indicated that the water infrastructure needs to be built and ready for service in six months’ time. There cannot be any slippage to the timeline, must deliver within budget, with the resources allocated and within the predetermined quality standards. As a project manager, your mandate is to work with all stakeholders to deliver or risk losing your job. The development life cycle are the stages that a project goes through to produce the product, service or result. Evaluate the different types of development life cycles. Identify the most suitable type for your project and justify your choicearrow_forwardYou are a project manager in the water and sanitation department in Johannesburg. The suburb of Soweto has recently come into the spotlight due the lack of water reticulation in the southern part. Residents have approached the president of South Africa to voice their discontent. The president has met with the mayor of Johannesburg and indicated that the water infrastructure needs to be built and ready for service in six months’ time. There cannot be any slippage to the timeline, must deliver within budget, with the resources allocated and within the predetermined quality standards. As a project manager, your mandate is to work with all stakeholders to deliver or risk losing your job. Project costs need to be categorised correctly to enable strict management of all project costs during the project lifecycle. Appraise the different project cost types for your project so that your finance department can provide you with the support you require in managing each cost. Ensure that examples…arrow_forward1arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY