Practical Management Science
Practical Management Science
6th Edition
ISBN: 9781337406659
Author: WINSTON, Wayne L.
Publisher: Cengage,
bartleby

Concept explainers

Question
Book Icon
Chapter 7, Problem 76P
Summary Introduction

To determine: The location of the bridge so that the distance between the cities A and B is small as possible.

Non-linear programming (NLP):

Non-linear programming (NLP) is used in complex optimization problems where the objectives or constraints or sometimes both are non-linear functions of the decision variables. A model can be termed as non-linear for more than one reason.

Blurred answer
Students have asked these similar questions
Sarah has a startup business that makes two distinct bird feeders that she has designed. Sarah is planning on operating a small factory to build the bird feeders. She is looking at two possible locations, A and B. If she chooses location A, the lease on the building will be higher than location B, thus leading to higher fixed costs than what she would have with location B. However, if she makes more than 20,000 units, both locations will likely have to be expanded, both the physical buildings and the manufacturing equipment. Variable costs to produce each unit will vary by location as well as by product. For example, the first design will have variable costs of $10 and $15 in locations A and B respectively, while the second bird feeder design will have variable costs of $20 and $25 respectively depending on location. However, she thinks that variable costs will decrease if she sells more than 5,000 units, as she will receive discounts from her suppliers at that point. She is unsure of…
A retail store in Des Moines, Iowa, receives shipments of a particular product from KansasCity and Minneapolis. Let  x 5  number of units of the product received from Kansas City       y 5  number of units of the product received from Minneapolisa. Write an expression for the total number of units of the product received by the retail store in Des Moines. b. Shipments from Kansas City cost $0.20 per unit, and shipments from Minneapolis cost$0.25 per unit. Develop an objective function representing the total cost of shipments to Des Moines. c. Assuming the monthly demand at the retail store is 5000 units, develop a constraint that requires 5000 units to be shipped to Des Moines. d. No more than 4000 units can be shipped from Kansas City, and no more than 3000 units can be shipped from Minneapolis in a month. Develop constraints to model this situation. e. Of course, negative amounts cannot be shipped. Combine the objective function and constraints developed to state a mathematical model…
A health Centre will be built to serve 7 communities. The geographical location of the communities and their population is shown in the table below.     Communities A,  X =2.5 (km),       Y=4.5(km),           Population( 000's)=2 Communities B,  X =2.5 (km),       Y=2.5(km),           Population( 000's)=5    Communities C, X =5.5 (km),       Y=4.5(km),           Population( 000's)=10     Communities D, X =5 (km),           Y=2(km),               Population( 000's)=7  Communities E, X =8 (km),           Y=5(km),               Population( 000's)=10    Communities F, X =7 (km),           Y=2(km),               Population( 000's)=20                  Communities G, X =9 (km),          Y=2.5(km),               Population( 000's)=14                There is a possibility of building the Centre in two communities, community C and F. Based on the Demand-Distance criterion what is your recommendation for the site of the Centre. The distances to be measured based on Rectilinear method. Based on…

Chapter 7 Solutions

Practical Management Science

Ch. 7.3 - Prob. 11PCh. 7.3 - Prob. 12PCh. 7.3 - Prob. 13PCh. 7.3 - PRICING SUITS AT SULLIVANS Sullivans is a retailer...Ch. 7.3 - Prob. 15PCh. 7.4 - Prob. 16PCh. 7.4 - Prob. 17PCh. 7.4 - Prob. 18PCh. 7.4 - Prob. 19PCh. 7.4 - Prob. 20PCh. 7.4 - Prob. 21PCh. 7.4 - Prob. 22PCh. 7.4 - Prob. 23PCh. 7.5 - Prob. 24PCh. 7.5 - Prob. 25PCh. 7.5 - Prob. 26PCh. 7.5 - Prob. 27PCh. 7.6 - Prob. 28PCh. 7.6 - Prob. 29PCh. 7.6 - Prob. 30PCh. 7.6 - Prob. 31PCh. 7.6 - Prob. 32PCh. 7.6 - Prob. 33PCh. 7.6 - The method for rating teams in Example 7.8 is...Ch. 7.7 - Prob. 35PCh. 7.7 - Prob. 36PCh. 7.7 - Prob. 37PCh. 7.7 - The stocks in Example 7.9 are all positively...Ch. 7.7 - Prob. 39PCh. 7.7 - Prob. 40PCh. 7.7 - Prob. 41PCh. 7.7 - Prob. 42PCh. 7.8 - Given the data in the file Stock Beta.xlsx,...Ch. 7.8 - Prob. 44PCh. 7 - Prob. 45PCh. 7 - Prob. 46PCh. 7 - Another way to derive a demand function is to...Ch. 7 - Prob. 48PCh. 7 - If a monopolist produces q units, she can charge...Ch. 7 - Prob. 50PCh. 7 - Prob. 51PCh. 7 - Prob. 52PCh. 7 - Prob. 53PCh. 7 - Prob. 54PCh. 7 - Prob. 55PCh. 7 - Prob. 56PCh. 7 - A beer company has divided Bloomington into two...Ch. 7 - Prob. 58PCh. 7 - Prob. 59PCh. 7 - Prob. 60PCh. 7 - Prob. 61PCh. 7 - Prob. 62PCh. 7 - Prob. 63PCh. 7 - You have 50,000 to invest in three stocks. Let Ri...Ch. 7 - Prob. 65PCh. 7 - Prob. 66PCh. 7 - Prob. 67PCh. 7 - Prob. 68PCh. 7 - Prob. 69PCh. 7 - Prob. 70PCh. 7 - Based on Grossman and Hart (1983). A salesperson...Ch. 7 - Prob. 73PCh. 7 - Prob. 74PCh. 7 - Prob. 75PCh. 7 - Prob. 76PCh. 7 - Prob. 77PCh. 7 - Prob. 78PCh. 7 - Prob. 79PCh. 7 - Prob. 80PCh. 7 - Prob. 81PCh. 7 - Prob. 82PCh. 7 - Prob. 83PCh. 7 - Prob. 84PCh. 7 - Prob. 85PCh. 7 - Prob. 86PCh. 7 - Prob. 1.1CCh. 7 - Prob. 1.2CCh. 7 - Prob. 1.3CCh. 7 - Prob. 1.4C
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,