Practical Management Science
6th Edition
ISBN: 9781337406659
Author: WINSTON, Wayne L.
Publisher: Cengage,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 7, Problem 61P
Summary Introduction
To determine: The locations where the warehouses must be located.
Non-linear programming (NLP):
Non-linear programming (NLP) is used in complex optimization problems where the objectives or constraints or sometimes both are non-linear functions of the decision variables. A model can be termed as non-linear for more than one reason.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
The distance between two cities in the United States can be approximated by the following formula, where lat1 and long1 are the latitude and longitude of city 1 and lat2 and long2 are the latitude and longitude of city 2.
69
(lat1 − lat2)2 + (long1 − long2)2
Ted's daughter is getting married, and he is inviting relatives from 15 different locations in the United States. The file Wedding gives the longitude, latitude, and number of relatives in each of the 15 locations.
Ted would like to find a wedding location that minimizes the demand-weighted distance, where demand is the number of relatives at each location. Assuming that the wedding can occur anywhere, find the latitude and longitude of the optimal location. (Hint: Notice that all longitude values given for this problem are negative. Make sure that you do not check the option for Make Unconstrained Variables Non-Negative in Solver. Round your answers to three decimal places.)
latitude of the optimal wedding location:…
A health Centre will be built to serve 7 communities. The geographical location of the communities and their population is shown in the table below.
Communities A, X =2.5 (km), Y=4.5(km), Population( 000's)=2
Communities B, X =2.5 (km), Y=2.5(km), Population( 000's)=5
Communities C, X =5.5 (km), Y=4.5(km), Population( 000's)=10
Communities D, X =5 (km), Y=2(km), Population( 000's)=7
Communities E, X =8 (km), Y=5(km), Population( 000's)=10
Communities F, X =7 (km), Y=2(km), Population( 000's)=20
Communities G, X =9 (km), Y=2.5(km), Population( 000's)=14
There is a possibility of building the Centre in two communities, community C and F. Based on the Demand-Distance criterion what is your recommendation for the site of the Centre. The distances to be measured based on Rectilinear method.
Based on…
A company needs to locate three departments (X, Y, and Z) in the three areas (I, II, and III) of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $.50 per load meter moved. An analyst has prepared the following flow and distance matrices:
Distances (meters) Flows (Loads per week)
From/To I II III From/To X Y Z
I - 10 20 X - 0 80
II - - 10 Y 30 - 150
III - Z 100 130 -If the company were to locate departments X, Y, and Z in areas 1, 2, and 3, respectively, what would be the total distance (in meters) loads would be moved each week?A. 3,100B. 3,600C. 6,200D. 7,200E. 8,200
Work must…
Chapter 7 Solutions
Practical Management Science
Ch. 7.3 - Prob. 1PCh. 7.3 - Prob. 2PCh. 7.3 - Pricing Decisions at Madison The Madison Company...Ch. 7.3 - Prob. 4PCh. 7.3 - Prob. 5PCh. 7.3 - Prob. 6PCh. 7.3 - Prob. 7PCh. 7.3 - Prob. 8PCh. 7.3 - Prob. 9PCh. 7.3 - Prob. 10P
Ch. 7.3 - Prob. 11PCh. 7.3 - Prob. 12PCh. 7.3 - Prob. 13PCh. 7.3 - PRICING SUITS AT SULLIVANS Sullivans is a retailer...Ch. 7.3 - Prob. 15PCh. 7.4 - Prob. 16PCh. 7.4 - Prob. 17PCh. 7.4 - Prob. 18PCh. 7.4 - Prob. 19PCh. 7.4 - Prob. 20PCh. 7.4 - Prob. 21PCh. 7.4 - Prob. 22PCh. 7.4 - Prob. 23PCh. 7.5 - Prob. 24PCh. 7.5 - Prob. 25PCh. 7.5 - Prob. 26PCh. 7.5 - Prob. 27PCh. 7.6 - Prob. 28PCh. 7.6 - Prob. 29PCh. 7.6 - Prob. 30PCh. 7.6 - Prob. 31PCh. 7.6 - Prob. 32PCh. 7.6 - Prob. 33PCh. 7.6 - The method for rating teams in Example 7.8 is...Ch. 7.7 - Prob. 35PCh. 7.7 - Prob. 36PCh. 7.7 - Prob. 37PCh. 7.7 - The stocks in Example 7.9 are all positively...Ch. 7.7 - Prob. 39PCh. 7.7 - Prob. 40PCh. 7.7 - Prob. 41PCh. 7.7 - Prob. 42PCh. 7.8 - Given the data in the file Stock Beta.xlsx,...Ch. 7.8 - Prob. 44PCh. 7 - Prob. 45PCh. 7 - Prob. 46PCh. 7 - Another way to derive a demand function is to...Ch. 7 - Prob. 48PCh. 7 - If a monopolist produces q units, she can charge...Ch. 7 - Prob. 50PCh. 7 - Prob. 51PCh. 7 - Prob. 52PCh. 7 - Prob. 53PCh. 7 - Prob. 54PCh. 7 - Prob. 55PCh. 7 - Prob. 56PCh. 7 - A beer company has divided Bloomington into two...Ch. 7 - Prob. 58PCh. 7 - Prob. 59PCh. 7 - Prob. 60PCh. 7 - Prob. 61PCh. 7 - Prob. 62PCh. 7 - Prob. 63PCh. 7 - You have 50,000 to invest in three stocks. Let Ri...Ch. 7 - Prob. 65PCh. 7 - Prob. 66PCh. 7 - Prob. 67PCh. 7 - Prob. 68PCh. 7 - Prob. 69PCh. 7 - Prob. 70PCh. 7 - Based on Grossman and Hart (1983). A salesperson...Ch. 7 - Prob. 73PCh. 7 - Prob. 74PCh. 7 - Prob. 75PCh. 7 - Prob. 76PCh. 7 - Prob. 77PCh. 7 - Prob. 78PCh. 7 - Prob. 79PCh. 7 - Prob. 80PCh. 7 - Prob. 81PCh. 7 - Prob. 82PCh. 7 - Prob. 83PCh. 7 - Prob. 84PCh. 7 - Prob. 85PCh. 7 - Prob. 86PCh. 7 - Prob. 1.1CCh. 7 - Prob. 1.2CCh. 7 - Prob. 1.3CCh. 7 - Prob. 1.4C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- The metes and bounds system primarily relies on which of the following to describe land? section, lot, and block numbers within a subdivision a readily identifiable point of beginning and the boundaries of a property in terms of distances and compass directions checks, correction lines, and tiers meridians, base lines, townships, and rangesarrow_forwardOhio Swiss Milk Products manufactures and distributes ice cream in Ohio, Kentucky, and West Virginia. The company wants to expand operations by locating another plant in northern Ohio. The size of the new plant will be a function of the expected demand for ice cream within the area served by the plant. A market survey is currently under way to determine that demand. Ohio Swiss wants to estimate the relationship between the manufacturing cost per gallon and the number of gallons sold in a year to determine the demand for ice cream and, thus, the size of the new plant. The following data have been collected: Plant ITT Thousands of Gallons Sold (X) 434.7 Cost per Thousand Gallons (Y) 1 $1,024 2 962 466.4 3 1,065 1,006 1,045 1,068 251.3 372.1 5 245.0 6. 258.6 7 988 614.9 414.0 8 997 9 1,063 1,000 $10,218 267.5 380,4 3,704.9 10 Total a. Develop a regression equation to forecast the cost per thousand gallons as a function of the number of thousands of gallons produced. The forecasting model…arrow_forwardOhio Swiss Milk Products manufactures and distributes ice cream in Ohio, Kentucky, and West Virginia. The company wants to expand operations by locating another plant in northern Ohio. The size of the new plant will be a function of the expected demand for ice cream within the area served by the plant. A market survey is currently under way to determine that demand. Ohio Swiss wants to estimate the relationship between the manufacturing cost per gallon and the number of gallons sold in a year to determine the demand for ice cream and, thus, the size of the new plant. The following data have been collected: ITT Cost per Thousand Gallons (Y) $1,024 Thousands of Gallons Sold (X) 434.7 Plant 962 466.4 251.3 372. 1,065 1,006 1.045 245.0 258.6 1,068 988 997 1,063 1,000 $10.218 614.9 414.0 267.5 380,4 3 704 9 9 10 Total a. Develop a regression equation to forecast the cost per thousand gallons as a function of the number of thousands of gallons produced. The forecasting model is given by the…arrow_forward
- Ohio Swiss Milk Products manufactures and distributes ice cream in Ohio, Kentucky, and West Virginia. The company wants to expand operations by locating another plant in northern Ohio. The size of the new plant will be a function of the expected demand for ice cream within the area served by the plant. A market survey is currently under way to determine that demand. Ohio Swiss wants to estimate the relationship between the manufacturing cost per gallon and the number of gallons sold in a year to determine the demand for ice cream and, thus, the size of the new plant. The following data have been collected: ITT Plant 1 Cost per Thousand Gallons (Y) $1,024 Thousands of Gallons Sold (X) 434.7 2 962 466.4 3 1,065 1,006 1,045 1,068 251.3 372.1 5 245.0 258.6 614.9 7 988 8. 997 414.0 267.5 380.4 3,704.9 9 1,063 1,000 $10,218 10 Total a. Develop a regression equation to forecast the cost per thousand gallons as a function of the number of thousands of gallons produced. The forecasting model is…arrow_forwardA company needs to locate three departments (I, II, and III) in the three areas (A, B, and C) of a new facility. They want to minimize interdepartmental transportation costs, which are expected to be $.40 per load per meter moved. An analyst has prepared the following distances and flow matrices: Distance (meters) Flows (loads per week) From/To A B C From/To I II III A - 30 40 I - 30 110 B - 60 II 90 - 70 C - III 70 60 - In what areas, A, B, and C, should departments I, II, and III be located that minimize the total cost of moving loads over…arrow_forwardMonsters, Inc. has two plants for producing electricity, one in Monsterville and another is in New Yeti. The Monsterville plant produces according to eM(x1,x2) = min{xX1,2x2} and the New Yeti plant produces according to eNY(x1,x2) = min{2x1,x2}, where xi and x2 are the inputs. iii. How much of each input will the firm need in order to produce 20 units electricity in the New Yeti plant? iv. Assume now that Monsters, Inc. decides to produce 40 units of electricity and it can split production in any manner between the two plants. Is the technology available to this firm convex or concave? Explain your answer.arrow_forward
- Use Kruskal's algorithm to find the minimum spanning tree path K₂. List all of the edges and list their weights in order in the chart below. In the third row of the table put YES is you are using the edge or NO if you are not. Edge Wt. Select 3 d a K3 Marbet 6 The total weight of the minimum spanning tree is:arrow_forwardShow your work on Excel with the formulas, please.arrow_forwardScenario You are going to plant a rectangular flower bed consisting of tulips in the middle surrounded by daisies on the outside. You have the same amount of each flower and will need an equal area for each. You want the border of daisies to be uniform around the tulips in the middle, as shown in the diagram below:arrow_forward
- Long-Life Insurance has developed a linear model that it uses to determine the amount of term life Insurance a family of four should have, based on the current age of the head of the household. The equation is: y=150 -0.10x where y= Insurance needed ($000) x = Current age of head of household b. Use the equation to determine the amount of term life Insurance to recommend for a family of four of the head of the household is 40 years old. (Round your answer to 2 decimal places.) Amount of term life insurance thousandsarrow_forwardA chain of home health care firms in Louisiana needs to locate a central office from which to conduct internal audits and other periodic reviews of its facilities. These facilities are scattered throughout the state, as detailed in the following table. Each site, except for Houma, will be visited three times each year by a team of workers, who will drive from the central office to the site. Houma will be visited five times a year. City Covington Donaldsonville X= Houma Monroe Natchitoches New Iberia Map Coordinates X 9.4 7.1 7.6 5.2 2.8 5.3 Y 3.2 2.5 Opelousas Ruston For the location of the new central office, the coordinates should be near: 5.2 3.6 1.7 8.1 6.8 2.1 3.3 8.5 y= c.) The center-of-gravity approach minimizes the distance traveled assuming straight lines. This approach ignores geographical features that would tend to violate the straight line constraint such as (select all that apply): A.) Rivers B.) Trips C.) Non-Straight Roads D.) Bridgesarrow_forwardFacility Location. A paper products manufacturer has enough capital to build and manage some additional manufacturing plants in the United States in order to meet increased demand in three cities: New York City, NY; Los Angeles, CA; and Topeka, KS. The company is considering building in Denver, CO; Seattle, WA; and St. Louis, MO. Max Operating Capacity 400 tons/day 700 tons/day Denver Seattle $10/ton $17/tor $5/ton $11/ton.... $18/ton.... $28/ton Los Angeles Topeka New York City Figure 1: Graphical representation of the given data = • The cost fi of building plants in these cities is fi $10,000,000 in Seattle. Unmet Demand 300 tons/day 100 tons/day 500 tons/day • Due to geographic constraints, plants in Denver and Seattle would have a maximum operating capacity kį of 400 tons/day and 700 tons/day respectively. $5,000,000 in Denver and f2 = • The cost cij per ton of transporting paper from city i to city j is outlined in Figure 1. • The unmet demand d, for Los Angeles, Topeka, and New…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,