Concept explainers
Explanation of Solution
Finding optimal solution:
The demand for sail boats during each of the next four quarters is;
First quarter-40 sailboats
Second quarter-60 sailboats
Third quarter- 75 sailboats
Fourth quarter- 25 sailboats
An inventory of 10 sailboats is at the beginning of the first quarter. Also, it is assumed that sailboats manufactured during a quarter can be used to meet demand for that quarter.
Also, during each quarter, Sailco can produce up to 40 sailboats with total cost of $400 per sailboat.
Additional sailboats with overtime labor can be produced at a total cost of $450 per sailboat.
A carrying cost of $20 per sailboat is incurred at the end of each quarter. A production schedule to minimize the sum of production and inventory costs during the next four quarters using linear
Let,
Sailco’s total cost can be determined as follows.
Since the total cost to be minimized, the objective function of Sailco is given below,
Minimize,
The constraints are given below,
For each period’s regular time production will not exceed 40. So the below given constraints are obtained.
Also suppose that,
This means,
When submitting the values, the following constraints are obtained.
Also,

Want to see the full answer?
Check out a sample textbook solution
Chapter 4 Solutions
Introduction to mathematical programming
- Could you help me to know features of the following concepts: - commercial CA - memory integrity - WMI filterarrow_forwardBriefly describe the issues involved in using ATM technology in Local Area Networksarrow_forwardFor this question you will perform two levels of quicksort on an array containing these numbers: 59 41 61 73 43 57 50 13 96 88 42 77 27 95 32 89 In the first blank, enter the array contents after the top level partition. In the second blank, enter the array contents after one more partition of the left-hand subarray resulting from the first partition. In the third blank, enter the array contents after one more partition of the right-hand subarray resulting from the first partition. Print the numbers with a single space between them. Use the algorithm we covered in class, in which the first element of the subarray is the partition value. Question 1 options: Blank # 1 Blank # 2 Blank # 3arrow_forward
- 1. Transform the E-R diagram into a set of relations. Country_of Agent ID Agent H Holds Is_Reponsible_for Consignment Number $ Value May Contain Consignment Transports Container Destination Ф R Goes Off Container Number Size Vessel Voyage Registry Vessel ID Voyage_ID Tonnagearrow_forwardI want to solve 13.2 using matlab please helparrow_forwarda) Show a possible trace of the OSPF algorithm for computing the routing table in Router 2 forthis network.b) Show the messages used by RIP to compute routing tables.arrow_forward
- using r language to answer question 4 Question 4: Obtain a 95% standard normal bootstrap confidence interval, a 95% basic bootstrap confidence interval, and a percentile confidence interval for the ρb12 in Question 3.arrow_forwardusing r language to answer question 4. Question 4: Obtain a 95% standard normal bootstrap confidence interval, a 95% basic bootstrap confidence interval, and a percentile confidence interval for the ρb12 in Question 3.arrow_forwardusing r languagearrow_forward
- using r languagearrow_forwardusing r language Obtain a bootstrap t confidence interval estimate for the correlation statistic in Example 8.2 (law data in bootstrap).arrow_forwardusing r language Compute a jackknife estimate of the bias and the standard error of the correlation statistic in Example 8.2.arrow_forward
- Operations Research : Applications and AlgorithmsComputer ScienceISBN:9780534380588Author:Wayne L. WinstonPublisher:Brooks Cole