A machining-center spindle and tool extend 10 in. from their machine-tool frame. Calculate the temperature change that can be tolerated in order to maintain a tolerance of 0.001 in. in machining. Assume that the spindle is made of steel.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Solve the math in a detailed way
A number of through holes with 10-mm-diameter have been drilled through 30-mm thick cast iron plate. At a
cutting speed of 25 m/min, the high-speed steel drill tool lasted for 44 holes. But, when the cutting speed
increased to 35 m/min, the drill tool lasted for only five holes. The feed used in the both cases is 0.08 mm/rev.
Determine the values of n and Cin the Taylor tool life equation for the data, where cutting speed v is expressed
in m/min, and tool life T is expressed in min.
Question 3.
A cemented carbide tool is used to turn a part with length = 18.0 in and diameter = 3.0
in. The parameters in the Taylor equation are: n= 0.27 and C = 1200. The rate for the
operator and machine tool = $33.00/hr, and the tooling cost per cutting edge = $2.00.
It takes 3.0 min to load and unload the workpart and 1.50 min to change tools. The feed
= 0.013 in/rev. Determine:
a) Cutting speed for maximum production rate,
b) Tool life in min of cutting, and
c) Cycle time and cost per unit of product.
Chapter 25 Solutions
EBK MANUFACTURING ENGINEERING & TECHNOL
Ch. 25 - Describe the distinctive features of machining...Ch. 25 - Explain how the tooling system in a machining...Ch. 25 - Explain the trends in materials used for...Ch. 25 - Is there any difference between chatter and...Ch. 25 - What are the differences between forced and...Ch. 25 - Explain the importance of foundations in...Ch. 25 - Explain why automated pallet changers and...Ch. 25 - What types of materials are machine-tool bases...Ch. 25 - What is meant by the modular construction of...Ch. 25 - What is a hexapod? What are its advantages?
Ch. 25 - What factors contribute to costs in machining...Ch. 25 - List the reasons that temperature is important in...Ch. 25 - Explain the technical and economic factors that...Ch. 25 - Spindle speeds in machining centers vary over a...Ch. 25 - Explain the importance of stiffness and damping of...Ch. 25 - Are there machining operations described in...Ch. 25 - How important is the control of cutting-fluid...Ch. 25 - Review Fig. 25.10 on modular machining centers,...Ch. 25 - Prob. 19QLPCh. 25 - Describe the adverse effects of vibration and...Ch. 25 - Describe some specific situations in which thermal...Ch. 25 - Prob. 22QLPCh. 25 - Prob. 23QLPCh. 25 - Prob. 24QLPCh. 25 - List the parameters that influence the temperature...Ch. 25 - List and explain factors that contribute to poor...Ch. 25 - Prob. 27QLPCh. 25 - Prob. 28QLPCh. 25 - Describe types and sizes of workpieces that would...Ch. 25 - Prob. 30QLPCh. 25 - Explain the advantages and disadvantages of...Ch. 25 - What are the advantages and disadvantages of (a)...Ch. 25 - What would be the advantages and limitations of...Ch. 25 - Explain how you would go about reducing each of...Ch. 25 - Describe workpieces that would not be suitable for...Ch. 25 - Give examples of forced vibration or self-excited...Ch. 25 - A machining-center spindle and tool extend 10 in....Ch. 25 - Using the data given in the example, estimate the...Ch. 25 - A machining-center spindle and tool extend 12 in....Ch. 25 - In the production of a machined valve, the labor...Ch. 25 - Estimate the optimum cutting speed in Problem...Ch. 25 - Prob. 42QTPCh. 25 - If you were the chief engineer in charge of the...Ch. 25 - Prob. 45SDPCh. 25 - Make a list of components of machine tools that...Ch. 25 - The cost of machining and turning centers is...Ch. 25 - Prob. 49SDPCh. 25 - Describe your thoughts on whether or not it is...Ch. 25 - Prob. 51SDPCh. 25 - Prob. 53SDP
Additional Engineering Textbook Solutions
Find more solutions based on key concepts
Locate the centroid of the area. Prob. 9-17
INTERNATIONAL EDITION---Engineering Mechanics: Statics, 14th edition (SI unit)
Find the change in length of side AB.
Mechanics of Materials, 7th Edition
Steady state conduction rate to the warm compressor to the net power produces theoretically by thermodynamic ba...
Introduction to Heat Transfer
List several uses of the arbor press.
Machine Tool Practices (10th Edition)
Compute the hydraulic radius for a circular drain pipe running half full if its inside diameter is 300 mm.
Applied Fluid Mechanics (7th Edition)
CONCEPT QUESTIONS
15.CQ3 The ball rolls without slipping on the fixed surface as shown. What is the direction ...
Vector Mechanics for Engineers: Statics and Dynamics
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.Similar questions
- Estimate the manufacturing cost for a simple machined component: a. Compare the costs for manufacturing volumes of 1, 10, 100, 1000, and 10,000 pieces with an intermediate tolerance and surface finish. Explain why there is a great change between 1 and 10 and a small change between 1000 and 10,000 pieces. b. Compare the costs for fit, intermediate, and rough tolerances with a volume of 100 pieces. c. Compare the costs of manufacturing the component out of various materials.arrow_forward2. Given a plate that is 0.12 in thick and constructed from high carbon steel, 490 Brinell hardness, with a machined finish. Assume 95% reliability and an operating temperature of 250 °C. (Hint: to find a relationship between Brinell Hardness and ultimate tensile strength, see Chapter 3 of the textbook). a) Construct the log S- log N curve. b) The loading is completely reversed (o mean =0), and infinite life is desired. What alternating stress can be allowed with a safety factor of 2?arrow_forwardQ1. Calculate the time required to machine a workpiece 170 mm long, 60 mm diameter to 165 mm long 50 mm diameter. The workpiece rotates at 440 rpm, feed is 0.3 mm/rev and maximum depth of cut is 2 mm. Assume total approach and overtravel distance as 5 mm for turning operation. Answer Q2. A gray cast iron surface 280 wide and 540mm long may be machined either on a vertical milling machine, using a 100mm - diameter face mill having eight inserted HSS teeth, or on a horizontal milling machine using an HSS slab mill with eight teeth on a 200-mm. diameter. Which machine has the faster cutting time? The values of feed per tooth and cutting speed for both processes are 0.4mm/tooth and 80m/min, respectively. The depth of cut = 3.0 mm and assume A and O equal to 5. Answerarrow_forward
- In an orthogonal cutting test with a bar of 75 mm diameter is reduced to 73 mm by using a HSS tool with arake angle = 10o, following observations were made: length of the chip, lc = 69.44 mm, cutting ratio r =0.3, the horizontal component of the cutting force, FH = 1450 N, and the vertical component of the cuttingforce, FV = 850 N. The various parameters recorded in this cutting operation are: depth of cut, d = 2 mm;feed rate, f = 0.3 mm/rev, cutting speed, V = 60 m/min. Using Merchant’s theory calculate the following:1) Friction force along rake face2) Normal force acting on rake face3) Shear force along the shear plane4) Normal force acting on shear plane5) The percentage error in shear angle predicted by Merchant’s theory6) Shear velocity7) Chip velocity8) Total work done9) The shear work proportion out of the total work done10) The friction work proportion out of the total work donearrow_forwardA high-speed steel tool is used to turn a steel workpart that is 295 mm long and 75 mm in diameter. The parameters in the Taylor equation are: n = 0.15 and C = 80 (m/min) for a feed of 0.5 mm/rev. The operator and machine tool rate = $29.00/hr, and the tooling cost per cutting edge = $3.90. It takes 2.1 min to load and unload the workpart and 3.40 min to change tools. Determine (a) cutting speed for maximum production rate, (b) tool life in min of cutting, and (c) cycle time and cost per unit of product (d) cutting speed for minimum cost and tool life in min of cuttingarrow_forwardA motorised metal guillotine machine is required to cut 45 mm diameter hole in a plate of 20 mm thickness at rate of 35 holes per minute. It requires a torque of 7 Nm for an area of hole in mm2. If the cutting takes 1/10 of a second and the speed of its flywheel varies from 165 rpm to 145 rpm, calculate: 1. Energy required to cut a hole. 2. Energy required for cutting work per second. 3. Maximum fluctuation of energy of the flywheel. 4. Mass of the flywheel having radius of gyration of 1.5 m.arrow_forward
- In a production turning operation, the workpart is 60 mm in diameter and 500 mm long. A feed of 0.75 mm/rev is used in the operation. If cutting speed=9 m/s, the tool must be changed every 4 workparts; But if cutting speed=5 m/s, the tool can be used to produce 50 pieces between tool changes. Determine the Taylor tool life equation for this job. (use the equations given below for solution)arrow_forwardA 200 mm long magnesium alloy bar, 63 mm in diameter is turned on a lathe using a high speed steel cutter travelling at 180 mm/min. The spindle rotates at 450 rpm and lathe is equipped with a 10 kW motor, operating at a mechanical efficiency of 92%. The final diameter of the magnesium alloy bar is 59,5 mm. Indicate with a sketch the recommend size and location of the following tool angles: back rake, side rake, end relief, side relief and side and end cutting edge. Calculate the cutting time for the machining process.Calculate the required cutting force.arrow_forwardA HSS tool is used to turn a steel workpart that is 300 mm long and 80 mm in diameter. The parameters in the Taylor equation are: n=0.13 and C= 75 (m/min) for a feed of 0.4 mm/rev. The operator and machine tool rate = $30.00/hr, and the tooling cost per cutting edge = $4.00. It takes 2.0 min to load and unload the workpart and 3.50 min to change tools. Determine: a. Tutting speed for maximum production rate, b. Tool life in min of cutting, and c. Cycle time and cost per unit of product.arrow_forward
- A HSS tool is used to turn a steel workpart that is 300 mm long and 80 mm in diameter. The parameters in the Taylor equation are: n = 0.13 and C = 75 (m/min) for a feed of 0.4 mm/rev. The operator and machine tool rate = $30.00/hr, and the tooling cost per cutting edge = $4.00. It takes 2.0 min to load and unload the workpart and 3.50 min to change tools. Determine: Tutting speed for maximum production rate, Tool life in min of cutting, and Cycle time and cost per unit of product. determine cutting speed for minimum cost.arrow_forwardEstimate the relative cost of grinding a steel part to a tolerance of ±0.0005 in versus turning it to a tolerance of +0.003 in.arrow_forwardIn a machine test, a cutting speed of 100 m/min indicated the tool life as 16 min and a cutting speed of 200 m/min indicated the tool life as 4 min. Calculate the values of n and C.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Elements Of ElectromagneticsMechanical EngineeringISBN:9780190698614Author:Sadiku, Matthew N. O.Publisher:Oxford University PressMechanics of Materials (10th Edition)Mechanical EngineeringISBN:9780134319650Author:Russell C. HibbelerPublisher:PEARSONThermodynamics: An Engineering ApproachMechanical EngineeringISBN:9781259822674Author:Yunus A. Cengel Dr., Michael A. BolesPublisher:McGraw-Hill Education
- Control Systems EngineeringMechanical EngineeringISBN:9781118170519Author:Norman S. NisePublisher:WILEYMechanics of Materials (MindTap Course List)Mechanical EngineeringISBN:9781337093347Author:Barry J. Goodno, James M. GerePublisher:Cengage LearningEngineering Mechanics: StaticsMechanical EngineeringISBN:9781118807330Author:James L. Meriam, L. G. Kraige, J. N. BoltonPublisher:WILEY
Elements Of Electromagnetics
Mechanical Engineering
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Oxford University Press
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:9780134319650
Author:Russell C. Hibbeler
Publisher:PEARSON
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:9781259822674
Author:Yunus A. Cengel Dr., Michael A. Boles
Publisher:McGraw-Hill Education
Control Systems Engineering
Mechanical Engineering
ISBN:9781118170519
Author:Norman S. Nise
Publisher:WILEY
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:9781337093347
Author:Barry J. Goodno, James M. Gere
Publisher:Cengage Learning
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:9781118807330
Author:James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:WILEY
The Most Common Metal Machining Processes (Metal Machining Video 1); Author: Sofeast Ltd;https://www.youtube.com/watch?v=uxVJ3qtezGw;License: Standard YouTube License, CC-BY
Machining process and Machine Tools; Author: Amar Gandhi;https://www.youtube.com/watch?v=X2mUJ8baaE0;License: Standard Youtube License