Operations Management
13th Edition
ISBN: 9781259667473
Author: William J Stevenson
Publisher: McGraw-Hill Education
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 19, Problem 9P
Summary Introduction
To determine: The optimal mix of products that maximizes the profit and the range of optimality of the profit coefficient of each variable.
Introduction:
Linear programming:
Linear programming is a mathematical modeling method where a linear function is maximized or minimized taking into consideration the various constraints present in the problem. It is useful in making quantitative decisions in business planning.
Range of optimality:
It is the range of values at which the coefficient of the objective function of a decision variable will change without changing either the list of the variables in the optimal quantities or the solution.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Two vital stages in a production process are assembly I and assembly II. The unit load for the assembly I stage is 7.0 ( 50% higher for high skill) minutes, while it is 10.0 (30 % higher for high skill) minutes for assembly II. There are 7 employees working in assembly I and 8 employees working in assembly II. 65% of low skill labor and 35% of high skill labor are required at both stages. . On average 18% of the operating time is wasted, what's the theoretical unit load for Assembly II?
answer is 9.06
please explain
A manufacturing process has a i xed cost of $150,000 per month. Each unit of product being produced contains $25 worth of material and takes $45 of labor. How many units are needed to break even if each completed unit has a value of $90?
. Aquatica makes underwater camera housings for divers. The process begins with a solid rectangular block of aluminum that is used to make a single housing. A computer numerically controlled (CNC) machine drills into the block to make the metal “frame” of the housing. Each block requires 15 minutes of drilling. The frame is then chemically treated in a series of baths. There is ample capacity in the treating stage. Finally, a worker must manually attach the various buttons and components to the metal housing. This assembly takes 120 minutes per housing per worker and Aquatica has 6 workers trained to do this task. The CNC machine requires a 30-minute setup time before the production of a batch can begin. a. If the CNC machine produces 14 housings between setups, what would be its capacity (in housings per hour)? b. Assuming the process is supply-constrained, what is the utilization (as a number between 0 and 1) of the CNC machine if it operates in batches of 14 housings? c. Assuming…
Chapter 19 Solutions
Operations Management
Ch. 19 - For which decision environment is linear...Ch. 19 - What is meant by the term feasible solution space?...Ch. 19 - Explain the term redundant constraint.Ch. 19 - Prob. 4DRQCh. 19 - Prob. 5DRQCh. 19 - Prob. 6DRQCh. 19 - Prob. 1PCh. 19 - Prob. 2PCh. 19 - Prob. 3PCh. 19 - A small candy shop is preparing for the holiday...
Ch. 19 - A retired couple supplement their income by making...Ch. 19 - Solve each of these problems by computer and...Ch. 19 - Prob. 7PCh. 19 - For Problem 6b: a. Find the range of feasibility...Ch. 19 - Prob. 9PCh. 19 - Prob. 10PCh. 19 - Prob. 11PCh. 19 - The manager of the deli section of a grocery...Ch. 19 - Prob. 13PCh. 19 - A chocolate maker has contracted to operate a...Ch. 19 - Prob. 15PCh. 19 - Prob. 16PCh. 19 - Prob. 1.1CQCh. 19 - Prob. 1.2CQCh. 19 - Prob. 1.3CQCh. 19 - Prob. 2.1CQCh. 19 - Prob. 2.2CQCh. 19 - Prob. 2.3CQCh. 19 - Prob. 2.4CQ
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A recurring maintenance job in a factory is being done by a three-man crew. Due to the nature of the job and space limitations, it was observed that two of the men were idle 37% of the time; one of the men was also idle an additional of the time, and at any given time only one man was required. The men were each paid P24.00 per hour. Each time the job was performed a set of tools and equipment with a value equivalent to P36.00 per hour was used. If the three-men crew could complete the work in 5 hours, which crew size would be the most economicalarrow_forwardKinga Doll Company manufactures eight versions of its popular girl doll, Shari. The company operates on a 40-hour workweek. The eight versions differ in doll skin, hair, and eye color, enabling most children to have a doll with a similar appearance to them. It currently sells an average of 4,000 dolls (spread equally among its eight versions) per week to boutique toy retailers. In simplified terms, doll making at Kinga involves three basic operations: molding the body and hair, painting the face, and dressing the doll. Changing over between versions requires setup time at the molding and painting stations due to the different colors of plastic pellets, hair, and eye color paint required. Table 7.5 lists the setup times for a batch and the activity times for each unit at each step. process setup molding painting dressing setup time (min) 12 29.00 no setup processing time (min) .24 0.17 0.27 a. What is the process capacity in dolls per hour with a batch size of 475 dolls? b.…arrow_forwardA computer recycler sells computer enclosures to a computer remanufacturer. To meet monthly expected demand, the remanufacturer needs 2.000 enclosures. The recycler utilizes a four-step disassembly process with scrap rates given as follows: d1=0.08, d2=0.05, d3=0.05, and d4=0.03. How many computers must be recycler receive each month in order to meet the remanufacturer’s demand?arrow_forward
- Consider the following batch-flow process consisting of three process stepsperformed by three machines. Process steps step 1 step 2 step 3 processing time 0.25min./unit 0.20 min./unit 0.15 min./unit setup time 30 min 20 min 45 min Work is processed in batches at each step. Before a batch is processed at a step, the machine atthat step must be set up. (During a setup, the machine is unable to process any product.) Assumethat there is a dedicated setup operator for each machine (i.e., there is always someone availableto perform a setup at each machine.)a. What is the capacity of step 1 if the batch size is 35 parts?b. For what batch sizes is step 1 (2, 3) the bottleneck?arrow_forwardP1 P4 P2 P3 P5 P5 P5 P6 ... P1 has a production rate of 15 units/hour, P2 = 30 units/hour, P3 = 10 units per hour, P4 = 4 units/hour, P5 = 1 unit(s) per hour for each P5 and P6 = 6 units per hour. Operation P4 occurs seperately from and simultaneously with operations P1-P3. Operation P5 has three parallel and identical lines; therefore, each part only needs to go through one of the three lines. Consider the following two independent improvements: Improvement 1: Change station P4 into two connected stations (P4-1 and P4-2, connected in series) that have process times of 4 min/unit and 6 min/unit respectively. Improvement 2: Add two additional P5 stations to give you 5 parallel and identical lines. Improvement 2 increases capacity because it improves the bottleneck. The new bottleneck is station P4 since the original bottleneck has a process time of The new yearly capacity would be units per year. a) Which of the two improvements will provide the largest increase in capacity? What is the…arrow_forwardA manufacturing process has a fixed cost of $150,000 per month Each unit of product being produced contains $25 worth of material and takes $45 of labor. How many units are needed to break even if each completed unit has a value of $90?arrow_forward
- Quasi-Tech Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications). Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. Costs have been assigned to each activity using direct tracing and resource drivers as follows: Activity Expected Cost Activity Driver Activity Capacity Engineering $1,000,000 Engineering hours 5,000 hours Setups 900,000 Setups 200 setups Machining 2,000,000 Machine hours 25,000 machine hours Inspection 800,000 Inspection hours 2,500 inspection hours Quasi-Tech produces two models: Model C and Model D. The following table…arrow_forwardJCL Inc. is a major chip manufacturing firm that sells its products to computer manufacturers like Dell, Gateway, and others. In simplified terms, chip making at JCL Inc. involves three basic operations: depositing, patterning, and etching. • Depositing: Using chemical vapor deposition (CVD) technology, an insulating material is deposited on the wafer surface, forming a thin layer of solid material on the chip. Patterning: Photolithography projects a microscopic circuit pattern on the wafer surface, which has a light-sensitive chemical like the emulsion on photographic film. It is repeated many times as each layer of the chip is built. • Etching: Etching removes selected material from the chip surface to create the device structures. The table below lists the required processing times and setup times at each of the steps. There is unlimited space for buffer inventory between these steps. Assume that the unit of production is a wafer, from which individual chips are cut at a later…arrow_forwardFormtech Inc. produces transformers. Each order is custom designed and manufactured for the customer. Each order goes through 3 phases: Transformer Design, which takes 4 weeks. Procurement, which has a lead time of 8 weeks. Assembly and Testing, which takes 4 weeks The design group can handle only 4 projects at any given time. The other groups are not capacity constrained. How much total work-in-process (number of projects started but not yet completed) does the company typically have? (Hint: Little's Law)arrow_forward
- ABC Manufacturing is evaluating the desirability of implementing process improvements and is seeking your help in determining whether it should proceed with the proposed improvements. One area of focus is how the improvements will affect processing time (manufacturing cycle time efficiency). Estimated activities and associated times for these activities under both the current process and after process improvements are as follows: Process Activity Current Process After Process Improvements Wait time 4 hours 1 hour Inspection 40 minutes 5 minutes Moving 80 minutes 20 minutes Processing (manufacturing) 2 hours 75 minutes Required: 1. Determine the manufacturing (production) lead time (in minutes) for each of the two decision alternatives. 2. Determine the manufacturing cycle efficiency (MCE) for each decision alternative.arrow_forwardA new highway is to be constructed. Design A calls for a concrete pavement costing $80 per foot with a 20-year life; four paved ditches costing $3 per foot each; and two box culverts every mile, each costing $9,000 and having a 20-year life. Annual maintenance will cost $1,800 per mile; the culverts must be cleaned every five years at a cost of $350 each per mile. Design B calls for a bituminous pavement costing $55 per foot with a 10-year life; three sodded ditches costing $1.45 per foot each; and four pipe culverts every mile, each costing $2,100 and having a 10-year life. The replacement culverts will cost $2,350 each. Annual maintenance will cost $2,900 per mile; the culverts must be cleaned yearly at a cost of $215 each per mile; and the annual ditch maintenance will cost $1.35 per foot per ditch. Compare the two designs on the basis of equivalent worth per mile for a 20-year period. Find the most economical design on the basis of AW and PW if the MARR is 6% per…arrow_forwardDesign capacity is the ability of the company to produce the quantity of goods and services within a particular period of time when the company have best condition to produce and when the company have unlimited resources. These resource's includes- Men, Machinery, Material etc. It shows the maximum capacity of the company to produce. Effective capacity refers to the ability of the company to produce maximum quantity within a particular period of time to achieve in current production condition and current resources. It shows the real outcome capacity of the firm when the company produce within their own current condition of their production. Question Why is the capacity design important?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,