a. Prepare a
b. What is the flow time in the grinding department for the SPT sequence? What is the total time needed to process the seven jobs in both the grinding and deburring departments?
c. Determine a sequence that will minimize the total time needed to process the jobs in both departments. What flow time will result for the grinding department?
d. Discuss the trade-offs between the two alternative sequencing arrangements. At what point would the production manager be indifferent concerning the choice of sequences?
Want to see the full answer?
Check out a sample textbook solutionChapter 16 Solutions
Operations Management
- WorkPro is a small manufacturer. It uses a job process for production. The following sample of jobs are listed in the order that they were received. Job Due Date Operation Time P 5 1 Q 20 8 R 8 5 S 11 6 T 3 12 When the shortest operating time (SOT) rule is applied to the sample of jobs, the resulting sequence is: A. Choos the following answer choice. T, P, R, S, Q R, S, T, P, Q P, Q, R, S, T P, R, S, Q, T B. In the WorkPro example above, average flow time for the sample of jobs when sequenced by the shortest operating time (SOT) rule is approximately: 19.8 14.2 4.8 6.4 C. In the WorkPro example above, average lateness for the sample of jobs when sequenced by the earliest due date (EDD) rule is approximately: Group of answer choices 10.4 4.8 7.8 5.8 D. Using the sample of jobs in the WorkPro example above, the shortest operating time (SOT) rule appears more attractive than the earliest due date (EDD) rule…arrow_forwardDan's Auto Detailing business performs two major activities: exterior cleanup and interior detailing. Based on the size of car and condition, time estimates for six cars on Monday morning are as shown in the accompanying table. Car Number 1 5 6 Exterior Interior 55 75 4 65 35 50 60 45 90 35 40 a. Sequence the cars so that all exterior cleanup is done first and total completion time is minimized. The sequence is -Select-- -Select- -Select- -Select- -Select-- -Select- 2 3 80 20arrow_forwardAt the campus copy shop, six jobs have arrived in the order shown (A, B, C, D, E, and F) at the beginning of the day 1 (today, which is a work day). All of the jobs are due at various times today. Your job is to evaluate four common sequencing rules. JOB DUE (IN HOURS) DURATION (HOURS REQUIRED) A 8 (this job is due in 8 hours) 1.65 B 5.5 (this job is due in 5.5 hours) 1.20 C 4.5 (this job is due after lunch in 4.5 hours) 0.85 D 6 (this job is due in 6…arrow_forward
- Why does the theory of constraints advocate that a manager’s attention be directed tothe bottleneck of a process?a. It is useful to lower the utilization of the bottleneck.b. The bottleneck has considerable influence on the average flow rate of a process.c. It is important to minimize the buffer inventory in front of the bottleneck.d. First-come-first-served scheduling of jobs at the bottleneck ensures that all jobs havethe same expected waiting time before they are processed at the bottleneck.arrow_forwardplease answer within 30 minutes its very urgent.arrow_forwardCurrently a company that designs Web sites has six customers in its backlog. The time since the order arrived, processing time, and promised due dates are given in the following table. Job Time Since Order Arrived (days ago) Processing Time (days) Due Date (days from now) A 6 18 48 B 4 22 52 C 1 30 70 D 10 14 28 E 7 12 56 F 5 20 62 Develop a schedule by using the first-come, first-served (FCFS) rule and calculate the average flow time and average days past due for the schedule. Develop a schedule by using the earliest due date (EDD) rule and calculate the average flow time and average days past due for the schedule. Comment on the performance of the FCFS and EDD rules relative to average flow time and average days past due.arrow_forward
- Payroll: Risks and Controls Below are some of the processes that are typically executed before, during, and after a payroll cycle: Employees record their hours worked. The supervisor reviews and approves each employee's time records with their signature. An officer from the Human Resources department updates employee files after receiving authorized records of overtime and leaves (vacations, illness, etc.) from the supervisor. Afterward, approved records are sent to the payroll officer in the accounting department. The payroll officer calculates the gross payment, applies deductions, and calculates the net payment. Subsequently, the final payroll is sent for the controller's approval. Payments are issued to employees using their preferred delivery method (check or direct deposit). Entries are generated for the corresponding payroll transactions. Withholdings for payroll taxes, Social Security, and Medicare are respectively remitted to the Department of Treasury and the Internal…arrow_forwardGiven the following information on job times and due dates, determine the optimal processingsequence using (1) FCFS, (2) SPT, (3) EDD, and (4) CR. For each method, find the average jobflow time and the average job tardiness. Jobs are listed in order of arrival.JobJob Time(hours)Due Date(hours)a 3.5 7b 2.0 6c 4.5 18d 5.0 22e 2.5 4f 6.0 20arrow_forwardPart b, average tardiness using edd rulearrow_forward
- Total customer-response time (CRT) can be defined as which of the following? (Hint: Refer to textExhibit 14.14 and the accompanying discussion.)a. The difference between when a customer’s order is set up and when the order is finishedb. The elapsed time between when a customer places an order for a product and when that order isdelivered to the customerc. Manufacturing lead (cycle) time for the orderd. The time between when an order is received by manufacturing and when that order is completedarrow_forwardNote:- Do not provide handwritten solution. Maintain accuracy and quality in your answer. Take care of plagiarism. Answer completely. You will get up vote for sure.arrow_forward. Assume the jobs displayed in Table 18.22 need to be processed on a single resource andare sequenced with the WSPT rule. Which job would be processed second?a. Ab. Bc. Cd. De. Earrow_forward