Interpretation: Contour lines for the problem of locating a machine shop described in Problem 28, needs to be drawn.

Concept Introduction: The line that passes through or drawn through points having the same value is called a contour line.

Expert Solution & Answer
Check Mark

Answer to Problem 33P

Contour lines have been drawn along the plotted points.

Explanation of Solution

Given information: Contour lines for locating the machine shop is drawn from the values of points derived.

The procedure for drawing contour lines is as follows:

  1. The points need to be plotted on a graph paper, and horizontal and vertical lines need to be drawn along their respective axis.
  2. The horizontal and vertical lines, needs to be clearly numbered from left to right.
  3. It is being assumed, Di to be the sum of weights of points along the horizontal line i and Ci be the sum of weights of points along the vertical line j .
  4. Following is the method for computing numbers:

  M1=M0+2C1         N0=N0+2D1M2=M1+2C2         N1=N1+2D2

Where Ci represents the total of the weights added up along the vertical line and Di represents the total of the weights added up along the horizontal line.

A region (i,j) can be defined as bounded by the ith vertical line and the (i+1)th vertical line and horizontally by the jth horizontal line and (j+1)th horizontal line. The area below the first horizontal line is represented by (i,0) , and that towards the left of the first vertical line is represented by (0,j) . The contour line’s slope is given by the formula:

  Sij=MiNj

After calculating the slopes of the contour lines, it is drawn by starting from any point, moves forward along the predetermined slopes, as calculated from the above mentioned formula and at an angle

The weights and coordinates of the locations of machines are being tabulated as follows:

    Location of machinesWeight
    (3,3)18
    (3,7)18
    (8,4)14
    (12,3)1
    (14,6)16

Let us assume the following:

  (a1,b1)=(3,3); (a2,b2)=(3,7); (a3,b3)=(8,4); (a4,b4)=(12,3); (a5,b5)=(14,6)

and w1=18; w2=18; w3=14; w5=16  . With these points the horizontal and vertical lines are drawn along the axis and the values of M0,M1,M2,M3,M4 and N0,N1,N2,N3,N4 are calculated.

  M0=(18+18+14+1+16)=56M1=53+12=76M2=76+12=23M3=23+2=43M4=43+26=53

  N0=(18+18+14+1+16)=56N1=53+94=712N2=712+12=1312N3=1312+13=1712M4=1712+14=53

Further, in order to find the slope, the ratios are calculated:

  S0,0=1S1,0=(76)/(53)=0.7S2,0=(23)/(53)=0.4S3,0=(43)/(53)=0.8S4,0=(53)/(53)=0.1 S0,1=(53)/(712)=2.8S1,1=(76)/(712)=12S2,1=(23)/(712)=1.1S3,1=(43)/(712)=2.2S4,1=(53)/(712)=2.8

  S0,2=(53)/(1312)=1.5S1,2=(76)/(1312)=1.07S2,2=(23)/(1312)=0.61S3,2=(43)/(1312)=1.2S4,2=(53)/(1312)=1.5S0,3=(53)/(1712)=1.17S1,3=(76)/(1712)=0.82S2,3=(23)/(1712)=0.47S3,3=(43)/(1712)=0.94S4,3=(53)/(1712)=1.17

  S0,4=(53)/(53)=1S1,4=(76)/(53)=0.7S2,4=(23)/(53)=0.4S3,4=(43)/(53)=0.8S4,4=(53)/(53)=1

From the derived points, the contour lines has been plotted as shown in the figure below: EBK PRODUCTION AND OPERATIONS ANALYSIS, Chapter 11.9, Problem 33P

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
The Clothing Shack is an online retailer of men's, women's, and children's clothing. The company has been in business for four years and makes a modest profit from its online sales. However, in an effort to compete successfully against online retailing heavyweights, the Clothing Shack's marketing director, Makaya O'Neil, has determined that the Clothing Shack's marketing information systems need improvement. Ms. O'Neil feels that the Clothing Shack should begin sending out catalogs to its customers, keep better track of its customer's buying habits, perform target marketing, and provide a more personalized shopping experience for its customers. Several months ago, Ms. O'Neil submitted a systems service request (SSR) to the Clothing Shack's steering committee. The committee unanimously approved this project. You were assigned to the project at that time and have since helped your project team successfully complete the project initiation and planning phase. Your team is now ready to move…
b-1.   Activity ES EF LS LF Slack 1           2           3           4           5           6           7           8           9           b-2. Identify the critical activities, and determine the duration of the project. The critical activities are                 .
The forecast for each week of a four-week schedule is 50 units. The MPS rule is to schedule production if the projected on-hand Inventory would be negative without it. Customer orders (committed) are follows: Week Customer Order 1 52 35 20 12 Use a production lot size of 75 units and no beginning Inventory. Determine the available-to-promise (ATP) quantities for each period. Note: Leave no cells blank - be certain to enter "0" wherever required. Period ATP 1 2 3
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,