Summary Introduction

Interpretation: A machine shop located on the outskirts of Los Angeles accepts custom orders from a number of high-tech firms in southern California. The machine shop consists of four departments: A (lathes), B (drills), C (grinders), and D (sanders). The from-to chart showing distances in feet between department centers is given.

    To Department
     ABCD
    A456332
    From DepartmentB292746
    C637568
    D403068

The shop has accepted orders for production of four products: P1, P2, P3 and P4. The routing for production of these products and the weekly production rates are

    ProductRoutingWeekly Production
    P1A-B-C-D200
    P2A-C-D600
    P3B-D400
    P4B-C-D500

Assuming that products are produced in batches of size 25; from the given data, a from-to chart giving numbers of materials handling trips per week between departments needs to be given.

Concept Introduction: A routing planning chart consisting of a matrix is called a from-to chart. Various operations are written across the top and along the left side of the form.

(b)

Summary Introduction

Interpretation: A machine shop located on the outskirts of Los Angeles accepts custom orders from a number of high-tech forms in southern California. The machine shop consists of four departments: A(lathes), B(drills), C(grinders), and D(sanders). The from-to chart showing distances in feet between department centers is given.

    To Department
     ABCD
    A456332
    From DepartmentB292746
    C637568
    D403068

The shop has accepted orders for production of four products: P1, P2, P3 and P4. The routing for production of these products and the weekly production rates are

    ProductRoutingWeekly Production
    P1A-B-C-D200
    P2A-C-D600
    P3B-D400
    P4B-C-D500

Assuming that products are produced in batches of size 25, and assuming that the cost of transportation of one batch 1 foot is estimated to be $1.50; from the from-to chart derived from part (a), a from-to chart giving the materials handling cost per week between departments, needs to given.

Concept Introduction: A routing planning chart consisting of a matrix is called a from-to chart. Various operations are written across the top and along the left side of the form.

(c)

Summary Introduction

Interpretation: A machine shop located on the outskirts of Los Angeles accepts custom orders from a number of high-tech forms in southern California. The machine shop consists of four departments: A(lathes), B(drills), C(grinders), and D(sanders). The from-to chart showing distances in feet between department centers is given.

    To Department
     ABCD
    A456332
    From DepartmentB292746
    C637568
    D403068

The shop has accepted orders for production of four products: P1, P2, P3 and P4. The routing for production of these products and the weekly production rates are

    ProductRoutingWeekly Production
    P1A-B-C-D200
    P2A-C-D600
    P3B-D400
    P4B-C-D500

Assuming that products are produced in batches of size 25, based on the results of part (b) and assuming that A is assigned to the highest cost and O to the least, with rankings E and I assigned to the costs falling in between the extremes, an activity relationship chart for the four departments needs to be developed.

Concept Introduction: A routing planning chart consisting of a matrix is called a from-to chart. Various operations are written across the top and along the left side of the form.

(d)

Summary Introduction

Interpretation: A machine shop located on the outskirts of Los Angeles accepts custom orders from a number of high-tech forms in southern California. The machine shop consists of four departments: A(lathes), B(drills), C(grinders), and D(sanders). The from-to chart showing distances in feet between department centers is given.

    To Department
     ABCD
    A456332
    From DepartmentB292746
    C637568
    D403068

The shop has accepted orders for production of four products: P1, P2, P3 and P4. The routing for production of these products and the weekly production rates are

    ProductRoutingWeekly Production
    P1A-B-C-D200
    P2A-C-D600
    P3B-D400
    P4B-C-D500

Assuming that products are produced in batches of size 25, supposing that the machine shop is located in a building that is 60 feet by 80 feet and that departments are rectangularly shaped, with the shape of facility as in Figure 10-32, a layout consistent with the relationship chart obtained from part (c) needs to be sketched.

Concept Introduction: A routing planning chart consisting of a matrix is called a from-to chart. Various operations are written across the top and along the left side of the form.

Blurred answer
Students have asked these similar questions
Problem 1 (20 Points) Davison Electronics manufactures three LED television monitors, identified as Model A, Model B, and Model C. Davison Electronics four manufacturing plants. Each model has its lowest possible production cost when produced at Plant 1. However, Plant 1 does not have the capacity to handle the total production of all three models. As a result, at least some of the production must be routed to the other manufacturing plants. The following table shows the minimum production requirements for next month, the plant capacities in units per month, and the production cost per unit at each plant: Model Production Cost per Unit Minimum Production Requirements Plant 1 Plant 2 Plant 3 Plant 4 A $25 $28 $37 $34 48,000 B $26 $35 $36 $41 75,000 C $20 $31 $26 $23 60,000 Production Capacity 65,000 50,000 32,000 43,000   Davison’s objective is to determine the cost-minimizing production plan. Without…
SECTION B: TOPIC STRUCTURE CAPSTONE PROJECT TOPIC SUBMISSION TEMPLATE SECTION A: STUDENT DETAILS Student number Title (Mr/Miss/Ms/Mrs) Surname First name/s Title of research Date and year of registration Work Home Contact details Cell Region Date submitted Email 1.1 Title Insert title of the research. Choose a title that captures the essence of your proposed project. 1.2 Background to the Problem This section will be used to create the readers' interest. It can include a specific description of the topic that is to be investigated. A brief preview of the topic and the foundation of the problem should also be given. The researcher can achieve this through building up a detailed background of circumstances that lead to the problem being examined. Therefore, the background helps the reader understand the specific problem addressed by the researcher. This section should not include the background/history of the organisation. The background to the problem should not be more than ½ a page.…
Does Nike Corporation's emphasis on lean operations help the Vietnamese workforce that still earns $150.00 minimum wage a month since 2014?
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
  • Text book image
    Practical Management Science
    Operations Management
    ISBN:9781337406659
    Author:WINSTON, Wayne L.
    Publisher:Cengage,
    Text book image
    Purchasing and Supply Chain Management
    Operations Management
    ISBN:9781285869681
    Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
    Publisher:Cengage Learning
    Text book image
    Marketing
    Marketing
    ISBN:9780357033791
    Author:Pride, William M
    Publisher:South Western Educational Publishing
  • Text book image
    MARKETING 2018
    Marketing
    ISBN:9780357033753
    Author:Pride
    Publisher:CENGAGE L
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Text book image
Marketing
Marketing
ISBN:9780357033791
Author:Pride, William M
Publisher:South Western Educational Publishing
Text book image
MARKETING 2018
Marketing
ISBN:9780357033753
Author:Pride
Publisher:CENGAGE L