York-Perry Industries (YPI) manufactures a mix of affordable guitars (A, B, C) that are fabricated and assembled at four different processing stations (W, X, Y, Z). The operation is a batch process with small setup times that can be considered negligible. The product information (price, weekly demand, and processing times) and process sequences are shown below. Purchased parts and raw materials (shown as a per-unit consumption rate) are represented by inverted triangles. YPI is able to make and sell up to the limit of its demand per week with no penalties incurred for not meeting the full demand. Each workstation is staffed by one highly skilled worker who is dedicated to work on that workstation alone and is paid $15 per hour. The plant operates one 8-hour shift per day and operates on a 5-day work week (i.e., 40 hours of production per person per week). Overhead costs are $9,000/week. Q Product A $10 Step 1 Station WH (14 min) Raw materials Step 2 Station Z (10 min) Purchased part Step 3 Station X (9 min) $5 Product B 59 Step 1 Step 2 Station W (10 min) Station Y Step 3 Station Z (17 min) (8 min) Raw materials Product C $11, Purchased part Step 1 Station X (11 min) Raw materials Step 2 Station W (21 min) Purchased part Step 3 Station Y (4 min) Product: A Price: $100/Unit Demand: 54 units/wk Product: B Price: $95/unit Demand: 62 units/wk Product: C Price: $105/unit Demand: 54 units/wk The senior management team wants to improve the profitability of the firm by accepting the right set of orders. Currently, decisions are made using the traditional method, which is to accept as much of the product with the highest contribution margin as possible (up to the limit of its demand), followed by the next highest contribution product, and so on until all available capacity is utilized. Because the firm cannot satisfy all the demand, the product mix must be chosen carefully. Jay Perry, the newly promoted production supervisor, is knowledgeable about the theory of constraints and the bottleneck-based method for scheduling. He believes that profitability can indeed be improved if bottleneck resources are exploited to determine the product mix. What is the change in profits if, instead of the traditional method that YPI has used thus far, the bottleneck method advocated by Jay is used for selecting the product mix? What is the profit if the traditional method is used for determining YPI's product mix? (Note: When determining the product mix, if the number of units to produce is not a whole number, be sure to round down to the next whole number before proceeding with any profit calculations.) The profit using the traditional method is $ 2,232. (Enter your response rounded to the nearest whole number.) What is the profit if the bottleneck-based method is used for determining YPI's product mix? (Note: When determining the product mix, if the number of units to produce is not a whole number, be sure to round down to the next whole number before proceeding with any profit calculations.) The profit using the bottleneck-based method is $. (Enter your response rounded to the nearest whole number.)

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter12: Queueing Models
Section: Chapter Questions
Problem 59P
icon
Related questions
Question

Help please, not sure why i got the first answer wrong. thank you

Question content area

Part 1
​York-Perry Industries​ (YPI) manufactures a mix of affordable guitars​ (A, B,​ C) that are fabricated and assembled at four different processing stations​ (W, X,​ Y, Z). The operation is a batch process with small setup times that can be considered negligible. The product information​ (price, weekly​ demand, and processing​ times) and process sequences are shown below. Purchased parts and raw materials​ (shown as a​ per-unit consumption​ rate) are represented by inverted triangles. YPI is able to make and sell up to the limit of its demand per week with no penalties incurred for not meeting the full demand. Each workstation is staffed by one highly skilled worker who is dedicated to work on that workstation alone and is paid
​$1515
per hour. The plant operates one​ 8-hour shift per day and operates on a​ 5-day work week​ (i.e., 40 hours of production per person per​ week). Overhead costs are​ $9,000/week.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
York-Perry Industries (YPI) manufactures a mix of affordable guitars (A, B, C) that are fabricated and assembled at four different processing stations (W, X, Y, Z). The operation is a batch process with small setup times that can be considered negligible. The product information (price,
weekly demand, and processing times) and process sequences are shown below. Purchased parts and raw materials (shown as a per-unit consumption rate) are represented by inverted triangles. YPI is able to make and sell up to the limit of its demand per week with no penalties
incurred for not meeting the full demand. Each workstation is staffed by one highly skilled worker who is dedicated to work on that workstation alone and is paid $15 per hour. The plant operates one 8-hour shift per day and operates on a 5-day work week (i.e., 40 hours of production
per person per week). Overhead costs are $9,000/week.
Q
Product A
$10
Step 1
Station WH
(14 min)
Raw materials
Step 2
Station Z
(10 min)
Purchased part
Step 3
Station X
(9 min)
$5
Product B
59
Step 1
Step 2
Station W
(10 min)
Station Y
Step 3
Station Z
(17 min)
(8 min)
Raw materials
Product C
$11,
Purchased part
Step 1
Station X
(11 min)
Raw materials
Step 2
Station W
(21 min)
Purchased part
Step 3
Station Y
(4 min)
Product: A
Price: $100/Unit
Demand: 54 units/wk
Product: B
Price: $95/unit
Demand: 62 units/wk
Product: C
Price: $105/unit
Demand: 54 units/wk
The senior management team wants to improve the profitability of the firm by accepting the right set of orders. Currently, decisions are made using the traditional method, which is to accept as much of the product with the highest contribution margin as possible (up to the limit of
its demand), followed by the next highest contribution product, and so on until all available capacity is utilized. Because the firm cannot satisfy all the demand, the product mix must be chosen carefully. Jay Perry, the newly promoted production supervisor, is knowledgeable about the
theory of constraints and the bottleneck-based method for scheduling. He believes that profitability can indeed be improved if bottleneck resources are exploited to determine the product mix.
What is the change in profits if, instead of the traditional method that YPI has used thus far, the bottleneck method advocated by Jay is used for selecting the product mix?
What is the profit if the traditional method is used for determining YPI's product mix? (Note: When determining the product mix, if the number of units to produce is not a whole number, be sure to round down to the next whole number before proceeding with any profit calculations.)
The profit using the traditional method is $ 2,232. (Enter your response rounded to the nearest whole number.)
What is the profit if the bottleneck-based method is used for determining YPI's product mix? (Note: When determining the product mix, if the number of units to produce is not a whole number, be sure to round down to the next whole number before proceeding with any
profit calculations.)
The profit using the bottleneck-based method is $. (Enter your response rounded to the nearest whole number.)
Transcribed Image Text:York-Perry Industries (YPI) manufactures a mix of affordable guitars (A, B, C) that are fabricated and assembled at four different processing stations (W, X, Y, Z). The operation is a batch process with small setup times that can be considered negligible. The product information (price, weekly demand, and processing times) and process sequences are shown below. Purchased parts and raw materials (shown as a per-unit consumption rate) are represented by inverted triangles. YPI is able to make and sell up to the limit of its demand per week with no penalties incurred for not meeting the full demand. Each workstation is staffed by one highly skilled worker who is dedicated to work on that workstation alone and is paid $15 per hour. The plant operates one 8-hour shift per day and operates on a 5-day work week (i.e., 40 hours of production per person per week). Overhead costs are $9,000/week. Q Product A $10 Step 1 Station WH (14 min) Raw materials Step 2 Station Z (10 min) Purchased part Step 3 Station X (9 min) $5 Product B 59 Step 1 Step 2 Station W (10 min) Station Y Step 3 Station Z (17 min) (8 min) Raw materials Product C $11, Purchased part Step 1 Station X (11 min) Raw materials Step 2 Station W (21 min) Purchased part Step 3 Station Y (4 min) Product: A Price: $100/Unit Demand: 54 units/wk Product: B Price: $95/unit Demand: 62 units/wk Product: C Price: $105/unit Demand: 54 units/wk The senior management team wants to improve the profitability of the firm by accepting the right set of orders. Currently, decisions are made using the traditional method, which is to accept as much of the product with the highest contribution margin as possible (up to the limit of its demand), followed by the next highest contribution product, and so on until all available capacity is utilized. Because the firm cannot satisfy all the demand, the product mix must be chosen carefully. Jay Perry, the newly promoted production supervisor, is knowledgeable about the theory of constraints and the bottleneck-based method for scheduling. He believes that profitability can indeed be improved if bottleneck resources are exploited to determine the product mix. What is the change in profits if, instead of the traditional method that YPI has used thus far, the bottleneck method advocated by Jay is used for selecting the product mix? What is the profit if the traditional method is used for determining YPI's product mix? (Note: When determining the product mix, if the number of units to produce is not a whole number, be sure to round down to the next whole number before proceeding with any profit calculations.) The profit using the traditional method is $ 2,232. (Enter your response rounded to the nearest whole number.) What is the profit if the bottleneck-based method is used for determining YPI's product mix? (Note: When determining the product mix, if the number of units to produce is not a whole number, be sure to round down to the next whole number before proceeding with any profit calculations.) The profit using the bottleneck-based method is $. (Enter your response rounded to the nearest whole number.)
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,