Suppose you want to use a hydraulic hoe and a fleet of trucks on an excavation project. If you calculate the hydraulic hoe's loading cycle time at 2.0 minutes and the truck cycle time at 25.0 minutes, what is the minimum number of trucks that you would need if you wanted the hydraulic hoe to control production? Group of answer choices 12 12.5 13 50
Suppose you want to use a hydraulic hoe and a fleet of trucks on an excavation project. If you calculate the hydraulic hoe's loading cycle time at 2.0 minutes and the truck cycle time at 25.0 minutes, what is the minimum number of trucks that you would need if you wanted the hydraulic hoe to control production? Group of answer choices 12 12.5 13 50
Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter10: Pricing Excavation And Backfill
Section: Chapter Questions
Problem 7RQ
Related questions
Question
Suppose you want to use a hydraulic hoe and a fleet of trucks on an excavation project. If you calculate the hydraulic hoe's loading cycle time at 2.0 minutes and the truck cycle time at 25.0 minutes, what is the minimum number of trucks that you would need if you wanted the hydraulic hoe to control production?
Group of answer choices
12
12.5
13
50
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps
Recommended textbooks for you
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,