Homework H3 Complete estimate of concroto Trade 4' Mat Foundation (from the same structural drawing), with #9 epoxy robar @ 8" OC at bottom EW and #7 rebar @ 12 OC at top EW. Building size 165'-0" x 101'-4"

Architectural Drafting and Design (MindTap Course List)
7th Edition
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Alan Jefferis, David A. Madsen, David P. Madsen
Chapter38: Drawing Sections With Alternative Materials
Section: Chapter Questions
Problem 38.6Q
icon
Related questions
Question

complete estimate of Concrete Trade by using information provided.

ignore the 4' matt foundation.

Need private and public estimate 

need help please!!

 

Homework H3 Complete estimate of concroto Trade
4' Mat Foundation (from the same structural drawing), with
#9 epoxy robar @ 8" OC at bottom EW and #7
rebar @ 12 OC at top EW.
Building size
165'-0" x 101'-4"
Transcribed Image Text:Homework H3 Complete estimate of concroto Trade 4' Mat Foundation (from the same structural drawing), with #9 epoxy robar @ 8" OC at bottom EW and #7 rebar @ 12 OC at top EW. Building size 165'-0" x 101'-4"
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Architectural Drafting and Design (MindTap Course…
Architectural Drafting and Design (MindTap Course…
Civil Engineering
ISBN:
9781285165738
Author:
Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:
Cengage Learning