Estimate the total amount of cost (Php) for concrete works (class "B") based from the following given: 7-pcs of F1 (1.2m x 1.2m x 0.3 m) 7-pcs of C1 (0.3 mx 0.3 m x 3.5 m) Floor area of 100mm thk slab-on-grade = 52 sq.m Class AA A B с TABLE 1-2 CONCRETE PROPORTION Cement Mixture 40 kg. /Bag 50 kg. / Bag 1:11/2: 3 9.5 1: 2:4 7.0 1:21/2: 5 6.0 1: 36 5.0 12.0 9.0 7.5 6.0 Sand Gravel cu.m. cu.m. .50 .50 .50 .50 The cost of cement (40kg per bag) = 240 per bag. The cost of sand is 710 per cubic meter. The cost of gravel is 1800 per cubic meter. 1.0 1.0 1.0 1.0
Estimate the total amount of cost (Php) for concrete works (class "B") based from the following given: 7-pcs of F1 (1.2m x 1.2m x 0.3 m) 7-pcs of C1 (0.3 mx 0.3 m x 3.5 m) Floor area of 100mm thk slab-on-grade = 52 sq.m Class AA A B с TABLE 1-2 CONCRETE PROPORTION Cement Mixture 40 kg. /Bag 50 kg. / Bag 1:11/2: 3 9.5 1: 2:4 7.0 1:21/2: 5 6.0 1: 36 5.0 12.0 9.0 7.5 6.0 Sand Gravel cu.m. cu.m. .50 .50 .50 .50 The cost of cement (40kg per bag) = 240 per bag. The cost of sand is 710 per cubic meter. The cost of gravel is 1800 per cubic meter. 1.0 1.0 1.0 1.0
Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter11: Pricing Concrete Work
Section: Chapter Questions
Problem 7RQ
Related questions
Question
solve
![Estimate the total amount of cost (Php) for concrete works (class "B") based from the following given:
7-pcs of F1 (1.2m x 1.2m x 0.3 m)
7-pcs of C1 (0.3 m x 0.3 m x 3.5 m)
Floor area of 100mm thk slab-on-grade = 52 sq.m
Class
AA
A
B
C
TABLE 1-2 CONCRETE PROPORTION
Cement
Mixture 40 kg. / Bag 50 kg. / Bag
9.5
7.0
6.0
5.0
1:11/2: 3
1: 2 : 4
1:21/2: 5
1: 36
12.0
9.0
7.5
6.0
Sand Gravel
cu.m.
cu.m.
.50
.50
.50
.50
The cost of cement (40kg per bag) = 240 per bag.
The cost of sand is
710 per cubic meter.
The cost of gravel is
1800 per cubic meter.
1.0
1.0
1.0
1.0](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2Fc636651c-3650-49ce-a15b-758af6b2662a%2F91955672-da31-4f02-830b-ed9efb509412%2Fendjfwa_processed.png&w=3840&q=75)
Transcribed Image Text:Estimate the total amount of cost (Php) for concrete works (class "B") based from the following given:
7-pcs of F1 (1.2m x 1.2m x 0.3 m)
7-pcs of C1 (0.3 m x 0.3 m x 3.5 m)
Floor area of 100mm thk slab-on-grade = 52 sq.m
Class
AA
A
B
C
TABLE 1-2 CONCRETE PROPORTION
Cement
Mixture 40 kg. / Bag 50 kg. / Bag
9.5
7.0
6.0
5.0
1:11/2: 3
1: 2 : 4
1:21/2: 5
1: 36
12.0
9.0
7.5
6.0
Sand Gravel
cu.m.
cu.m.
.50
.50
.50
.50
The cost of cement (40kg per bag) = 240 per bag.
The cost of sand is
710 per cubic meter.
The cost of gravel is
1800 per cubic meter.
1.0
1.0
1.0
1.0
Expert Solution
![](/static/compass_v2/shared-icons/check-mark.png)
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 3 steps with 3 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
![Fundamentals Of Construction Estimating](https://www.bartleby.com/isbn_cover_images/9781337399395/9781337399395_smallCoverImage.gif)
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
![Fundamentals Of Construction Estimating](https://www.bartleby.com/isbn_cover_images/9781337399395/9781337399395_smallCoverImage.gif)
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,