CONSTRUCTION LABOR GIVEN: A bedroom & bathroom with floor area of 45sq.m., productivity of 1 tilesetter (5 sq.m/day) PROBLEM: Compute for the efficient labor cost based on budget (Php500/day of 1 worker) and days of work. As a Project Manager, will you hire few or many manpower to finish early or longer duration? Justify your answer.
Q: What is the function of a Foreman? a)supervise field workers / labor crews b)order materials…
A: A foreman is like the head of field workers at the construction site. Who supervises the activities…
Q: How is the optimum cost-time point determined? What are the conditions that must exist for one to be…
A:
Q: The following is a table of activities associatedwith a project at Rafay Ishfaq’s software firm in…
A: (a) To draw arrow on node diagram(AON) look at the table here is only one starting activity and one…
Q: You are required to design a 2-story steel building. The building is a logistic warehouse located in…
A: The objectives of designing a 2-story steel logistic warehouse in Chicago, IL are as follows:1.…
Q: Stress out the differences between Estimating and Quantifying. 2. Why is it so important to follow…
A: From the given question it is required to explain the following statements- Stress out the…
Q: A big financial institution has hired you as a PM. As a first task, you are assigned to automate an…
A: Given: A big financial institution has hired you as a PM. As a first task, you are assigned to…
Q: What is the difference between a conceptual cost estimate and a detailed cost estimate
A: As per our guidelines we solve only the first part of question. Kindly resubmit the question with…
Q: Question 1 - Resource Constraints Imagine you are managing a construction project to build a new…
A: Resource constraints are limitations or shortages of essential resources, such as funding,…
Q: A can finish a work in 18days. B can do the same job in half the time taken A. Then working together…
A: Given data- A can finish the work in 18 days. B can finish the work in 9 days To find- working…
Q: Engr-429 Construction Management 1. Given the following construction progress chart, calculate the…
A: The following are the given information.OperationHours1. Clear and Grubbing16252. Drainage4053.…
Q: |At a particular time during the construction, the site manager realizes that the actual excavation…
A: For machine, Given: The actual hours AH is 895. The standard rate SR is 100. Calculation: The…
Q: Using the same CPM diagram, what is the total project duration? Immediate Estimated Activity…
A:
Q: List the four temporary site services that are usually required on a construction project, and…
A: The four temporary site service that are required on a construction project to carry out the work…
Q: A flooring subcontractor must install three types of flooring in an existing building. The…
A: Given in the question Actual Cost (AC) = 3638 Planned Value(PV) = 40% of 16484 =6593.6 (Because from…
Q: the following data; draw arrow network diagram and manually level your resources so that you may not…
A: In order to level the resources, find the Critical path and floats of each activity and adjust…
Q: NEED ANSWER ASAP What is the productivity rate of each carpenter (in m2/hr) if 8 men have…
A: given- total 8 menarea constructed A=20.3 m2total days of construction t=6 dayseach worker produces…
Q: For the S-Curve below you received on a project, you can deduce: a. At week 25 the project is ahead…
A: Given:- The given S-curve for the work verses time in week is given as An S-curve is a mathematical…
Q: A construction company is planning their projects for the year 2023. The company is considering the…
A: In they have built similar buildings but with smaller areas, and the material costs associated…
Q: Question Table 1 shows the list of the consecutive activities and their details for an 8-mi road…
A: Given:- Target rate of the build = 1.5 miles per week Minimum buffer time = 4 days To determine:=…
Q: The
A: In construction planning the first step to proceed is to identify the goals and be clear with what…
Q: Two members of a crew work on floor tiles in the kitchen. The total kitchen floor area is 54 SF. If…
A:
Q: 22, 26 Q3) A project involving the renovation of a parking underway. In a weekly progress meeting,…
A:
Q: A client plans to construct a manufacturing plant that involves multiple engineering disciplines.…
A: Mechanical Works, $1,540,000Electrical Works, $1,780,000Earth Works, $950,000Civil Works,…
Q: Please give me right answer according to the question.. Don't copy from websites.. Note: This is…
A: Brief concept- Rebars- These are the steel bars that are used in the concrete for te reinforcemnet…
Q: cost cost of labor
A: 1.In the Philippines setup,cost of labour consists of the 1.Direct wages and salaries. It means the…
Q: General Contractors working an a project that requires several months to complete typically request…
A: Solution: The answer is Option G, ALL OF THE ABOVE
Q: 1. Did internal or external factors (e.g. new staff/volunteers, unanticipated delays, increased…
A: The objective of the question is to understand the impact of internal and external factors on the…
Q: 17. The CPM schedule provides a great deal of information that is useful to a construction project…
A: ''Since you have asked multiple questions, we will solve the first question for you. If you want any…
Q: 1. Prepare Dr. Based on the following activities, Identify Te calculate: 1. ES & EF each activity.…
A:
Q: For the schedule below: Draw the node network diagram, draw the chart bar diagram, and manually…
A: In order to level the resources, find the Critical path and floats of each activity and adjust…
Q: SITUATION 1: You are responsible for two subcontractors, earthwork and roofing, on your megaproject.…
A: When the general contractor gets a contract with the owner of a construction project. Then the…
Q: Working with production network experts who can manage placement of work content for you is…
A: 1. Evaluation of the circumstance: As the project manager, it is crucial to evaluate the…
Q: As the construction manager/Site engineer, there are many issues that have come up at management…
A: Construction management refers to the process of planning, coordinating, and managing the various…
Q: Question 2 A) How to achieve or meet with main construction functions based on construction…
A: The process of erecting structures on land, sometimes known as real estate sites, is known as…
Q: Productivity and Ethics Janice Interiors installs custom interiors for luxury mobile homes. Inits…
A: (a) The expression for the partial labor productivity is given by, The total number of installation…
Q: a. Fixed period demand (2,3,4,5 periods) b. Period order quantity (POQ) (Q = 300) c. Lot for lot…
A: Period order quantity (Q)=300Holding cost (H)=$0.30 per weekCost of per product (A)=$1.00
Q: The contractor implements last planner on the project. During week 1, the following tasks are…
A: The percent plan complete (PPC) for week 1 is calculated as shown below:…
Q: In a construction project, as in problem 1, effective cash needed before payment is received from…
A: In a construction project, as in problem 1, effective cash generated before payment is received from…
Q: A contractor agreed that. If his job was not done by a certain date, he would pay $100 for the 1st…
A: 1st day of penalty = a = $100 Increase in penalty for successive days = d = $5 Total Penalty = $1080
Q: 2 skilled workers can do 36m² of floor finishes in a day. Assuming that a skilled worker rate is Php…
A: Given-2 skilled workers can do 36m² of floor finishes in a day and a skilled worker rate is Php…
Q: 1. Explain in detail the effect on project indirect costs when a job is lengthened and when it is…
A: As per company's guidelines we can only answer first question Kindly post other question as separate…
Q: If the specifications are silent on the subject, but a contractor asks you, as the Resident Project…
A: If the specifications are silent on the subject, but a contractor asks you, as the Resident Project…
CONSTRUCTION LABOR
GIVEN: A bedroom & bathroom with floor area of 45sq.m., productivity of 1 tilesetter (5 sq.m/day)
PROBLEM: Compute for the efficient labor cost based on budget (Php500/day of 1 worker) and days of work. As a Project Manager, will you hire few or many manpower to finish early or longer duration? Justify your answer.
![](/static/compass_v2/shared-icons/check-mark.png)
Step by step
Solved in 2 steps with 1 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
- Engr-429 Construction Management 1. Given the following construction progress chart, calculate the weekly cumulative progress through the end of week 5, and show the curve on the chart. The total project labor hours is 33,985, the percent complete shown is actual progress for each activity. You must calculate the weight of each activity. Shows planned schedule Shows actual progress Operation 1. Clear and Grubbing 2. Drainage 3. Subgrade 5. Pave 6. Testing Hours Wt. 7. Striping 1625 4. Base Course 8125 405 8745 14005 280 500 8. Punch List 400 SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT SCH ACT 1 10 2 40 30 15 3 80 160 30 4 100 100 55 Weeks 5 6 15 85 40 15 Fall 2023 7 8 9 10 The individual weight is simply the percentage the activity represents of the total project labor hours. 100% 90% 80% 70% 60% 50% 40% 30% 20% 10%Q1: Use the following data; draw arrow network diagram and manually level your resources so that you may not use more than nine laborers per day at any time. Laborers Duration IPA Activity 3 2 - A 2 4 A B 4 6 A C 3 9 A D 4 5 B E 2 7 B,C F 4 3 D,E,F G Civil Engineeing Subject=Construction ManagementNote: Kindly provide a solution pls. The answer is already provided. Thank you! 1.1 A construction job could be finished in 150 days if 50 men are working full time. 70 men startedworking on the job and after 10 days, 10 more men are added. But after 80 days, 50 men quit thejob. How long could it take them to finish the job? Ans:120
- Q3: The activities involved in the construction of a certain project are given in the table below. One resource type will be used during the contract. Determine the minimum level of the resource required to complete the project. Activity Dependency Duration Number of Description (Days) Labours (Unit/Day) A 2 3 B A 4 3 C A 6 4 D A 9 4 E B 5 3 F B, C 7 2 G D, E, F 3 4Question Table 1 shows the list of the consecutive activities and their details for an 8-mi road construction project. Prepare a line of balance schedule for a contract of 125 sections using a target rate of build of 1.5 mile per week and each team working at their natural rate assume a minimum buffer time of 4 days between the operation and five 8 hrs days per week. 1. What is the overall duration of the project? Activities Description Man hours Team size Depends on Clearing 550 6. Grubbing 550 C Earth work 460 4 А, В Base 420 3 C Paving 330 F Finish Shoulders 200 1 E Move out 180 1 FFor the S-Curve below you received on a project, you can deduce:a. At week 25 the project is ahead of scheduleb. At week 15 the project is ahead of schedulec. For weeks 16 and 17 no work was accomplishedd. The workforce will have to work extra shifts to finish the project on schedule.
- A project of Glam Rock Industries involves making a small concert hall. The contractor pays 40000php and additional 9000php on every week spent on this project. Having considered the materials and equipment cost and the laborers' paycheck, only the project-in-charge and taxes are getting weighed. Workers are not allowed to make any movement unless supervised by the project-in-charge (PIC) so the project stops if the PIC is not around. 3 engineers are referred as project-in-charge by reliable connections and the contractor can only choose one; Firehouse Firm referred CJ, a very strict PIIC who finishes 0.4% of the entire project every hour, but is only available 5 hours daily on weekdays. Has a rate of 1400php/hr. Bad English Firm referred Johnny, a very calm PIC who finishes 0.28% of the entire project every hour, but is only available 4 hours every day. Has a rate of 920php/hr. Steelheart Firm referred Miljenko, a very fine and attentive PIC who finishes 0.25% of the entire project…A project of Glam Rock Industries involves making a small concert hall. The contractor pays 40000php and additional 9000php on every week spent on this project. Having considered the materials and equipment cost and the laborers’ paycheck, only the project-in-charge and taxes are getting weighed. Workers are not allowed to make any movement unless supervised by the project-in-charge (PIC) so the project stops if the PIC is not around. 3 engineers are referred as project-in-charge by reliable connections and the contractor can only choose one; Firehouse Firm referred CJ, a very strict PIC who finishes 0.4% of the entire project every hour, but is only available 5 hours daily on weekdays. Has a rate of 1400php/hr. Bad English Firm referred Johnny, a very calm PIC who finishes 0.28% of the entire project every hour, but is only available 4 hours every day. Has a rate of 920php/hr. Steelheart Firm referred Miljenko, a very fine and attentive PIC who finishes 0.25% of the entire project…Please I want the correct solution as soon as possible, my friend. Thank you Q1/ A project of 20 houses, according to activity shown in table below with a handover rate of 3 houses per week, 8 hours working per day, 5 working days per week, B.T. 5 day. 1- Draw Scheduling of project by using Line of Balance Method (LOB) and determine the completion time for the project. 2- Project completion rate after (70) days Activity Manhours per activity (M) Men per activity(Q) A 110 3 B 320 8 C 365 9 D 35 2 E 210 5
- Question Table 1 shows the list of the consecutive activities and their details for an 8-mi road construction project. Prepare a line of balance schedule for a contract of 125 sections using a target rate of build of 1.5 mile per week and each team working at their natural rate assume a minimum buffer time of 4 days between the operation and five 8 hrs days per week. 3. The rate of work progress after 4 weeks. Activities Description Man hours Team size Depends on A Clearing 550 6 Grubbing 550 C Earth work 460 A, B D Base 420 3 Paving 330 F Finish Shoulders 200 1 E Move out 180 1Civil Find RATE OF BURDENED HOURLY PAY Craft-Mason $29.00 per hour is the going rate50 hours per week for 20 weeks, and 40 hours per week for 29 weeks, were worked. Paid time off for holidays, sick days, and vacation: three weeks at a 40-hour workweekTime-and-a-half for any hours worked in excess of forty each week Monthly petrol allowance of $100$500 in annual bonus6.2% of the first $106,800 in salary is allocated to social security. Medicare accounts for 1.45% of all wages. On the first $7,000 in salary, FUTA is 0.8%. On the first $18,000 in salary, SUTA is 4.5 percent. Worker's compensation insurance costs $7.25 for every $100 in earnings. General liability protection0.75 percent less than wages $300 per month for health insurance (company's contribution). employee 6% of an employee's salary, or $7.75 for every $1.00 paid by the employee, goes towards retirement.Using the same CPM diagram, what is the total project duration? Immediate Estimated Activity Activity Description Predecessors Duration A Excavate 2 weeks Lay the foundation Put up the rough wall Put up the roof Install the exterior plumbing Install the interior plumbing Put up the exterior siding Do the exterior painting B A 4 weeks C 10 weeks D C 6 weeks 4 weeks 5 weeks 7 weeks 9 weeks 7 weeks 8 weeks 4 weeks E C F E G D E, G Do the electrical work F, I Put up the wallboard Install the flooring Do the interior painting Install the exterior fixtures K 5 weeks M 2 weeks N Install the interior fixtures K, L 6 weeks Total = 79 weeks