Precision Machining Technology (MindTap Course List)
2nd Edition
ISBN: 9781285444543
Author: Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Concept explainers
Textbook Question
Chapter 8.6, Problem 12RQ
A G98 in a canned cycle sets the return point to the ____ _____ and a G99 sets the return point to the _____ _______.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A workpiece turning at 20 rad/sec has a diameter of 4 inches. Find the peripheral speed of the workpiece.
2) The continuous stopwatch timing method was used to obtain the observed times for a
worker-machine task. Only one cycle was timed. The data are recorded in the table below.
The times are listed indicate the stopwatch reading at the end of the element. Elements
a, b, and d are worker-controlled elements. Element c is machine controlled. Elements a
and d are external to the machine-controlled element, while element b is internal. Every
four cycles, there is an irregular worker element that takes 1.32 min rated at 100%
performance. For determining the standard time, the PFD allowance is 15% and the
machine allowance is 30%. Determine
a. The normal time
b. Standard time for the cycle
c. If worker efficiency is 100%, how many units will be produced in one 8-hour shift?
d. If the actual time worked during the shift is 6.86 hours, and the worker
performance is 125%, how many units will be produced?
Description of
Worker
Time
Description of
(min) Rating (%) Element Machine Element
Worker…
As3
Chapter 8 Solutions
Precision Machining Technology (MindTap Course List)
Ch. 8.1 - What is an ATC?Ch. 8.1 - What is an MCU and what is its function?Ch. 8.1 - Briefly describe a ball screw and a linear guide.Ch. 8.1 - Explain the benefits of using the absolute...Ch. 8.1 - Explain the benefits of using the incremental...Ch. 8.1 - Which coordinate system uses an angle and a...Ch. 8.1 - What is the name for the type of motor used to...Ch. 8.1 - Supposing a programmer, using absolute mode,...Ch. 8.1 - What is a modal code?Ch. 8.1 - What is another name for the Cartesian coordinate...
Ch. 8.1 - List four G-codes and describe their functions. a....Ch. 8.1 - List four M-codes and describe their functions. a....Ch. 8.1 - What is the name of the character that ends each...Ch. 8.1 - Explain the purpose of the safe-start portion of a...Ch. 8.2 - Name the two primary machine axes on most CNC...Ch. 8.2 - Explain the difference between a turning center...Ch. 8.2 - List the three common types of live toolholders....Ch. 8.2 - Name three major collet styles used in...Ch. 8.2 - Name three types of workholding devices for...Ch. 8.2 - Name three major styles of turning machines....Ch. 8.2 - Explain why some workholding devices can be run at...Ch. 8.2 - Explain the difference between an OD grooving tool...Ch. 8.2 - When machining workpieces made from bar stock,...Ch. 8.2 - Describe how a sub-spindle can be used to increase...Ch. 8.2 - How does a Swiss turning center differ from a...Ch. 8.3 - Write the X- and Z-axis coordinates for the part...Ch. 8.3 - To perform a facing cut using a tool with a nose...Ch. 8.3 - Explain the difference between rigid tapping and...Ch. 8.3 - How must the feed rate for tapping using a...Ch. 8.3 - Describe what happens to a concave radius (fillet)...Ch. 8.3 - Describe what happens to an outside chamfer when...Ch. 8.3 - If a G1 code command is programmed partway through...Ch. 8.3 - List and briefly describe the two methods for...Ch. 8.3 - Explain in your own words the difference between...Ch. 8.3 - In your own words, describe a canned cycle.Ch. 8.3 - List two types of canned cycles besides roughing...Ch. 8.4 - What machine mode is generally used to manually...Ch. 8.4 - MDI stands for _________ ___________ ________.Ch. 8.4 - Which must be set first, the tool geometry offset...Ch. 8.4 - What is the process called where a program is sent...Ch. 8.4 - Explain the purpose of homing.Ch. 8.4 - What is the process called when a new program is...Ch. 8.4 - When setting up a machine to run a program that...Ch. 8.4 - What does MCS stand for?Ch. 8.4 - What is used to adjust the clamping pressure of...Ch. 8.4 - What does MCS stand for?Ch. 8.4 - What does WCS stand for?Ch. 8.4 - A workpiece offset is the distance from __________...Ch. 8.5 - Explain the difference between a machining center...Ch. 8.5 - Name the two major types of ATCs and briefly...Ch. 8.5 - What are the two basic types of tapping...Ch. 8.5 - What are the three most common styles of collets...Ch. 8.5 - What are the two basic types of tapping...Ch. 8.5 - Prob. 6RQCh. 8.5 - A programmable indexing fixture creates a fourth...Ch. 8.5 - A _______ ________ uses interchangeable tooling...Ch. 8.5 - Briefly describe a tombstone used for CNC...Ch. 8.5 - A custom ______ can be designed and built to hold...Ch. 8.5 - The combination of the machining operations...Ch. 8.6 - What are the three major axes used during CNC mill...Ch. 8.6 - What command would be given to turn on the spindle...Ch. 8.6 - What G-code designates IPM feed rate mode? IPR...Ch. 8.6 - What is the purpose of a clearance plane in CNC...Ch. 8.6 - What is the purpose of work coordinate systems?Ch. 8.6 - Briefly define linear interpolation.Ch. 8.6 - If during the last operation on a part, a G1 code...Ch. 8.6 - Briefly describe the use of I and J for the arc...Ch. 8.6 - Write two blocks of code that could be used to...Ch. 8.6 - Briefly explain the difference between rigid and...Ch. 8.6 - Define the initial plane for a canned drilling or...Ch. 8.6 - A G98 in a canned cycle sets the return point to...Ch. 8.6 - A _____ code is used to cancel a canned cycle.Ch. 8.6 - What two codes are used to activate automatic...Ch. 8.6 - What two codes are used to activate automatic...Ch. 8.6 - What code is used to cancel automatic cutter...Ch. 8.7 - Which must be set first, a work offset or a tool...Ch. 8.7 - What mode is used to manually enter programs into...Ch. 8.7 - What is the process called when a program is sent...Ch. 8.7 - Explain what may occur that makes it necessary to...Ch. 8.7 - Explain the purpose of homing.Ch. 8.7 - What is the process called when a new program is...Ch. 8.7 - What are two actions that can be taken during the...Ch. 8.7 - When automatic cutter radius compensation is used...Ch. 8.7 - Which machine mode allows short, temporary program...Ch. 8.7 - Which machine mode is used to run the machine...Ch. 8.7 - What are the two controls on the machine's control...Ch. 8.7 - What control panel feature can be used to slow a...Ch. 8.8 - Prob. 1RQCh. 8.8 - Prob. 2RQCh. 8.8 - What are the three primary steps in creating a CNC...Ch. 8.8 - Prob. 4RQCh. 8.8 - What is the definition of entity?Ch. 8.8 - Why should a toolpath be verified on the screen of...Ch. 8.8 - What is a post-processor used for?Ch. 8.8 - What is it called when mutiple touching entities...Ch. 8.8 - What type of cutting tool is usually used for...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.Similar questions
- Industry Print Exercise 23-2 Refer to print PR 23-2. The sequence of operations for this print is given below. Answer the questions following the sequence of operations. Sequence of Operations descends at a controlled rate, slowly compacting the explosive charge to avoid detonation due to a sudden Description: This is a system to control a 90-ton hydraulic, explosive-compaction press. The press ram shock. 1. The cycle is started by energizing solenoid A, which shifts control valve 3 and supplies pressure to the head end of the hydraulic cylinder (7). This operates the ram. 2. The cylinder (7) extends at a slow rate controlled by the fluid in the rod end of the cylinder, which is vented through the flow control valve (5). the 1. When de-energizes solenoid A and energizes solenoid B. This shifts control valve 3 to retract the cylinder (7). de rol valve 5 has an integral check valve that permits the free flow of fluid in the opposite direction, causing the cylinder (7) to rapidly retra…arrow_forwardExcavator loading time = 36 seconds per loading pass Truck travelling time = 351 seconds per truck Truck dumping time = 22 seconds per truck Unloaded truck Travelling back time = 181 seconds per truck Truck queuing or waiting time = 75 seconds/truck Excavator-truck spotting time = 14 seconds/truck Estimate the total number of units (trucks), if the total production of a coal mine is 4Mt per year at 91% recovery. Use the cycles per production hour from above, figure out with your reasonable detailed calculations and assumptions for all other parameters you need in your calculations including the loose and bank (prime) volume and tonnage of the coal per truck per year.arrow_forward24 MENG201 Mechanical workshop practicearrow_forward
- 27. You have the following compound machine. For S and ins a. What is the ideal mechanical advantage of this system? The inclined plane dimensions are 7.2 meters length and 1.8 meters height. What effort force is required to move the 600N create? In practice, you need to supply an effort force of 75 N to lift the crate. What is the efficiency? C. How could you redesign this compound d. machine so that the effort force needed was 50 N in practice? Assume the efficiency is your response from part C no matter what changes you make. Be specific with the changes you propose (if you add pulleys state how many, if you change the inclined plane dimensions state the new dimensions, etc.).arrow_forwardME 408 - Machine Shop Theory and Practice Describe the step-by-step procedure in turning a taper using compound rest method.arrow_forwardrees) answer only ten of the following multi choice questions. 1. In CNC machine tools, the motors used to control feed rate are: A. Servo motors B. Induction motors C. Stepper motors D. Hydraulic motors 2. The purpose of a feedback device in a CNC machine tool is to provide information of: A. Speed B. Displacement C. Force D. Both speed and displacement 3. Federate on a machining center can be specified in: A. Only feed per revolution B. Either feed per minute or feed per revolution C. Only feed per minute D. Feed per tooth per revolution 4. The correct syntax of an NC block for inclined line milling operation is: A. N-G01 X-F- B. N-G01 Z---F--- C. N-G01 X-Y--F--- D. N-G01 M X Y F... 5. When the contour or continuous path system is used, A. Tool movement from one point to the next does not have to follow a specific path. B. Tool travel is controlled along ong axis at a time. C. Machine and tool movements are precisely controlled at all times and in all planes. D. None of the above. 6.…arrow_forward
- Please solve it complete please don't copy pastearrow_forwardProvide the allocation List Draw the Grafcet and obtain the grafcet equation Develop the ladder programming from the grafcet III. Description of the cycle: When the start push button is pressed the box motor conveyer is turned on until the box reaches the sensor for box. With box in position, the apple motor conveyor is turned ON and the number of apples is counted using an apple sensor. When the apple count value is 10, turn off the apple conveyor motor. Turn on the box conveyor again to move the box and when the next box arrives in the position then reset the apple counter. A schematic sketch of the automation system is provided in figure 1. apple motor conveyor Sensor for apples box motor conveyor II. I. Sensor for box CONTROL PANEL START STOParrow_forward10. This is not a motion command word: * GODLTA GOTO/P5 GO/TANΤΟ GOUParrow_forward
- 6. Write one block of code to perform the indicated operation. Assume the location is X2.0, Y2.0, and the depth is Z-1.5 for each operation. 1) Drill with dwell of 0.2 seconds 2) Peck drilling cycle with a 0.15" peck depth 3) Chip breaker with a 0.15" peck and full retract every 0.6" 4) RH tapping cycle for 14-16 NC thread; define a spindle speed and feed 5) Bore a hole with the tool being retracted manuallyarrow_forwardsolve the questionI got my answer but im not sure if it is correct(628.75 or 718.7 ?)arrow_forward***Solve the following problems, correctly and systematically, and show all the necessary figures. Show your correct and complete solution neatly. *** Find the motor size needed to provide the forced-draft service to a boiler that burns coal at the rate of 10 tons per hour. The air requirements are 59 000 cfm, air is being provided under 6 inches water gage by the fan that has mechanical efficiency of 60 %. Assume fan to deliver at a total pressure of 6 inches water gage.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Precision Machining Technology (MindTap Course Li...Mechanical EngineeringISBN:9781285444543Author:Peter J. Hoffman, Eric S. Hopewell, Brian JanesPublisher:Cengage LearningRefrigeration and Air Conditioning Technology (Mi...Mechanical EngineeringISBN:9781305578296Author:John Tomczyk, Eugene Silberstein, Bill Whitman, Bill JohnsonPublisher:Cengage Learning
Precision Machining Technology (MindTap Course Li...
Mechanical Engineering
ISBN:9781285444543
Author:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:Cengage Learning
Refrigeration and Air Conditioning Technology (Mi...
Mechanical Engineering
ISBN:9781305578296
Author:John Tomczyk, Eugene Silberstein, Bill Whitman, Bill Johnson
Publisher:Cengage Learning
The Robot Revolution: The New Age of Manufacturing | Moving Upstream; Author: Wall Street Journal;https://www.youtube.com/watch?v=HX6M4QunVmA;License: Standard Youtube License