Traffic And Highway Engineering
5th Edition
ISBN: 9781133605157
Author: Garber, Nicholas J., Hoel, Lester A.
Publisher: Cengage Learning,
expand_more
expand_more
format_list_bulleted
Question
Chapter 8, Problem 8P
To determine
Whether the intersection satisfies MUTCD Warrant
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
The average normal flow of traffic on
cross roads A and B during design
period are 400 and 250 pcu per hour; the
saturations flow values on these roads
are estimated as 1250 and 1000 pcu per
hour respectively.
The all-red time required for pedestrian
crossing is 12 secs.
Design two phase traffic signal by
Webster's method.
A new section of a freeway is to be designed with a free-flow-speed of 65 mph along of 0.75 mile on 5% upgrade. The expected traffic volume is 4200 v/hr. The traffic composition is 15% trucks, 5% recreational vehicles, and 10% buses. The peak hourly factor is 0.9, the unfamiliar driver factor is 0.95. If the design requirement is to target a level of service (B), how many lanes must be provided to satisfy the design requirement?
Q3c. At a three leg (T) intersection, the two-way peak hour volume on the minor road is 500 veh/hr and that on the major road is 600 veh/hr. As a Traffic Engineer, what type of intersection control will you propose? What is the basis of your proposal?
Chapter 8 Solutions
Traffic And Highway Engineering
Ch. 8 - Prob. 1PCh. 8 - Prob. 2PCh. 8 - Prob. 3PCh. 8 - Prob. 4PCh. 8 - Prob. 5PCh. 8 - Prob. 6PCh. 8 - Prob. 7PCh. 8 - Prob. 8PCh. 8 - Prob. 9PCh. 8 - Prob. 10P
Ch. 8 - Prob. 11PCh. 8 - Prob. 12PCh. 8 - Prob. 13PCh. 8 - Prob. 14PCh. 8 - Prob. 15PCh. 8 - Prob. 16PCh. 8 - Prob. 17PCh. 8 - Prob. 18PCh. 8 - Prob. 19PCh. 8 - Prob. 20PCh. 8 - Prob. 21PCh. 8 - Prob. 22PCh. 8 - Prob. 23PCh. 8 - Prob. 24PCh. 8 - Prob. 25PCh. 8 - Prob. 26PCh. 8 - Prob. 27PCh. 8 - Prob. 28P
Knowledge Booster
Similar questions
- Two adjacent signalized intersections along a major arterial are 650 ft apart (stop line to stop line distance). If the space mean speed between these two intersections is 22 mph, what should be the signal offset of the downstream intersection relative to the upstream intersection? Group of answer choices 20.0 sec 13.5 sec 40.0 sec 29.5 secarrow_forwardA six-lane freeway (three lanes in each direction) in mountainous terrain has 10-ft lanes and obstructions 1 ft from the right edge. There are five ramps within three miles upstream of the segment midpoint and four ramps within three miles downstream of the segment midpoint. The traffic stream consists of mostly commuters with a peak hour factor of 0.84, peak-hour volume of 2500 vehicles, and 4% recreational vehicles. What is the level of service? (Write the letter only)arrow_forwardA Four Lane freeway is located on rolling terrain with a free flow speed of 70 mph,12ft lanes, and no lateral obstructions within 8 ft of the pavement edges. the traffic stream consists of cars, buses and large trucks (no recreational vehicles) . A weekend directional peak hour volume of 1800 vehicles (*regular users*)is observed ,with 700 arriving in the mostly congested 15 minutes period . if a level of service no worse than C is required ,determine the maximum number of large trucks and buses that can be present in the peak hour traffic stream.. Dislike for wrong answersarrow_forward
- A minor road carrying 60 veh/h on each approach for eight hours of an average day crosses a major road carrying 110 veh/h on each approach for the same eight hours, forming a cross intersection. The 85th- percentile approach speed of major roads is 65km/h. In addition, the multiway stop is considered as an interim solution. Determine whether a multiway stop sign is justified at this location if the following conditions exist: 1. The pedestrian volume from the minor street for the same eight hours as the traffic volume is 30 рed/h. 2. The average delay to minor-street vehicular traffic during the maximum hours is 35 sec/veh. 3. There is an average of four crashes per year that may be corrected by a multiway stop control. а. WA and WC are satisfied. b. WA, WB, and WC are satisfied. С. WB and WC are satisfied. d. WD is satisfied.arrow_forward3. Determine the LOS for pedestrians at two-phase signalised intersection with a cycle length of 90 s. the phase serving the major street vehicular traffic gets 50s of green whereas the phase serving the minor street vehicular traffic gets 30 s of green. Useful formula: dp Table for assessing the LOS LOS A B C D E F 0.5(C-g)² C Average delay/pedestrian (s) >5 ≥ 5-10 > 10-20 >20-30 ≥ 30-45 > 45arrow_forwardA new freeway ramp meter will be installed on the Medina onramp to westbound SR 520. There is 70 ft from the ramp meter stop line back to the nearest intersection, and each stopped vehicle takes up an average of 20 ft. The desired meter rate is one vehicle every 10 seconds, while the arrival rate averages one vehicle arrival every 11 seconds. What is the average queue length? 55ft O 4.5 ft 100ft 90ftarrow_forward
- Draw a space – time diagram for traffic within a tunnel. Assuming there exist a 2-lane before the tunnel but the tunnel itself is 1-lane and after the tunnel the road returns to being a 2-lane.arrow_forwardDetermine whether a T intersection (one leg on the minor approach) with the hourly volume data satisfy MUTCD Warrant 3 (peak-hr vehicular volume) for signalization. All approaches have one lane entering the intersection. For the warrant that is met, explain how the warrant is met (rules applied, hours in which the volume criteria were met, etc.) and refer to necessary graphs and tables. The major street speed limit is 60 km/h, and the minor street speed limit is 40 km/h.arrow_forwardAnalyze the unsignalized intersection below and calculate the optimum cycle length if the intersection will be signalized. Approach E W N S Maximum no. of lanes 5 5 4 4 Direction Through left Through left Through left Through left N Total volume pcu/hr 1,480 370 860 586 1,360 494 2,030 265 Sat. flow rate pcu/hr/lane 2,400 1,700 2,400 1,700 2,200 1,800 2,200 1,800arrow_forward
- Ina road-intersection near Dhaka, average 120 cars make right-hand turns in every hour. Road planner wants to put in a 3-vehicle right- hand turn lane in the intersection to avoid blocking of thru traffic. Determine if 3-vehicle right-hand turn lane satisfy the following design criteria: Red light time of right-hand traffic is 30 seconds Right-hand turn lane must be sufficient 90% of the time.arrow_forwardIn order to determine the DHV from a traffic count worksheet, the first step is to: Group of answer choices Calculate the PHF of each approach Determine which hour has the highest total intersection volume in veh/hr Convert all of the turning counts from veh/15-min to veh/hr Calculate the PHF of the intersectionarrow_forwardA developer has applied for a construction permit to build a supermarket at the southeast cornerof an intersection that is formed by a four-lane divided highway in the east-west direction and atwo-lane road in the north-south direction. Traffic on the two-lane road is controlled by a stop signat the intersection. The speed limit on the four-lane highway is 88 km/h. using the sight trianglerequirements at the intersection (Case B1), determine whether permission should be given for theconstruction if the following conditions exist. Provide a diagram for your solution.Major road lane width = 3.6 mMinor road lane width = 3.3 mMedian lane = 2.8 mDesign vehicle is a passenger carApproach grade = 2%Maximum feasible distance building from the center of the nearest lane of four-lane road = 5.4 mMaximum feasible distance building from the center of the nearest lane of two-lane road = 16.5 marrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning