Chapter 1, Problem 2P
To determine

The future challenges in the field of transportation.

Expert Solution & Answer
Check Mark

Explanation of Solution

The future challenges in the field of transportation are as follows:

  1. Logistics and Supply-Chain Management
  2. Design of vehicle and Transportation Services
  3. Infrastructure in transportation Services
  4. Specialties within Infrastructure Engineering of Transportation

Logistics and Supply-Chain Management:

  • Logistics is the process of planning, executing and controlling the well organizedand preserving of goods ofconcerned information from origination to consumption as required by customer.
  • The concept of expansion of logistics is called supply chain management.
  • In this it coordinates the products, reduce the organization cost and flow of cash to maximize the consumption satisfaction.

Design of vehicle and Transportation Services

  • Design of vehicle and manufacture is an important industry in the United States and includes the application of mechanical, aerospace engineering skills and alsowell-trained mechanics and workers from other fields.
  • This type of service provides jobs like vehicle drivers, flight attendant and other professionals like lawyers, social scientists and ecologist can also work in transportation field with draft legislation.

Infrastructure in transportation Services

  • This includes the planning, design, construction, operations, and management of a transportation system.
  • Appropriate transportation infrastructure system consistent with society's economic development, resources, and goals to construct and manage the system in a safe and efficient manner.

Specialties within Infrastructure Engineering of Transportation

  • Transportation engineers are employed by the agency which are responsible for building and maintaining a transportation system, which includes federal, state, local government, railroads.
  • They can also work in the consulting field to carry the plan and engineering tasks for this type of organizations.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
1:08 Il LTE Individual Assignment CEQ 31... CIVIL ENGINEERING ROANTICLO (Earthworks Quantities) (Due Date: Friday, 28/03/2025) Done Thumbi Irrigation Scheme in Mzimba district is under threat of flooding. In order to mitigate against the problem, authorities have decided to construct a flood protection bund (Dyke). Figure 1 is a cross section of a 300m long proposed dyke; together with its foundation (key). Survey data for the proposed site of the dyke are presented in Table 1. Table 2 provides swelling and shrinkage factors for the fill material that has been proposed. The dyke dimensions that are given are for a compacted fill. (1) Assume you are in the design office, use both the Simpson Rule and Trapezoidal Rule to compute the total volume of earthworks required. (Assume both the dyke and the key will use the same material). (2) If you are a Contractor, how many days will it take to finish hauling the computed earthworks using 3 tippers of 12m³ each? Make appropriate assumptions.…
Thumbi Irrigation Scheme in Mzimba district is under threat of flooding. In order to mitigate against the problem, authorities have decided to construct a flood protection bund (Dyke). Figure 1 is a cross section of a 300m long proposed dyke; together with its foundation (key). Survey data for the proposed site of the dyke are presented in Table 1. Table 2 provides swelling and shrinkage factors for the fill material that has been proposed. The dyke dimensions that are given are for a compacted fill. (1) Assume you are in the design office, use both the Simpson Rule and Trapezoidal Rule to compute the total volume of earthworks required. (Assume both the dyke and the key will use the same material). (2) If you are a Contractor, how many days will it take to finish hauling the computed earthworks using 3 tippers of 12m³ each? Make appropriate assumptions. DIKE CROSS SECTION OGL KEY (FOUNDATION) 2m 1m 2m 8m Figure 1: Cross section of Dyke and its foundation 1.5m from highest OGL 0.5m…
this is from CE-192
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Text book image
Engineering Fundamentals: An Introduction to Engi...
Civil Engineering
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Cengage Learning
Text book image
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,
Text book image
Residential Construction Academy: House Wiring (M...
Civil Engineering
ISBN:9781285852225
Author:Gregory W Fletcher
Publisher:Cengage Learning
Text book image
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Text book image
Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning