Rent-With-Us Management Inc. has purchased a large housing complex and must decide where to locate its offices and service facilities. The company has learned that locating each service in a different apartment building helps control the behavior of tenants, but it would also like to keep unnecessary transit time to a minimum. Data collected on movements between facilities during a six month period from a similar apartment complex are shown below. Construct a layout diagram on a 2 × 3 grid that minimizes nonadjacent movement.
Want to see the full answer?
Check out a sample textbook solutionChapter 7 Solutions
Operations and Supply Chain Management, 9th Edition WileyPLUS Registration Card + Loose-leaf Print Companion
Additional Business Textbook Solutions
Operations Management, Binder Ready Version: An Integrated Approach
Business in Action (8th Edition)
Operations Management: Processes and Supply Chains (11th Edition)
Operations Management
Operations Management: Sustainability and Supply Chain Management (12th Edition)
Business in Action
- Gator Offi ce Systems is comparing two layouts for thedesign of its offi ce building. It has interviewed managers inorder to develop the from–to matrix shown in Table 10-12. Th etwo layouts considered are shown in Figure 10-14. Which layoutdo you think is better for Gator Offi ce Systems, using the load–distance model?arrow_forwardAn industrial food processor needs to design a product layout for a new line of frozen pizza. The company plans to use this new production line ten hours a day in order to meet projected demand of 1,000 pizzas per day. The following table describes the tasks involved in the production of a frozen pizza. Task Immediate Predecessors Task Duration (Seconds) A none 10 B A 14 В 20 B 16 E C,D 12 8 Design this layout using the decision rule of Longest Processing Time (LPT). What is the theoretical minimum number of work stations? a. Three b. One Oc. Two d. Five e. Fourarrow_forwardA Missouri job shop bas four departments- machining (M), dipping in a chemical bath (D), finishing (F), and plating (P)-assigned to four work areas. The operations manager, MaryMarrs, bas gathered the following data for this job shop as it is currently laid out (Plan A). It costs $0.50 to move workpiece foot in the job shop.Marrs's goal is to find a layout that bas the lowest materialhandlingcost.a) Detemline cost of the current layout, Plan A, from the given data.b) One alternative is to switch those departments with the high loads, namely, finishing (F) and plating (P), which alters the distance between them and machining (M) and dipping (D), as follows: What is the cost of this layout?Marrs now wants you to evaluate Plan C, which also switches milling (M) and dri lling (D), below.…arrow_forward
- An industrial food processor needs to design a product layout for a new line of frozen pizza. The company plans to use this new production line ten hours a day in order to meet projected demand of 1,000 pizzas per day. The following table describes the tasks involved in the production of a frozen pizza. Task Immediate Predecessors Task Duration (Seconds) A none 10 В A 14 20 D В 16 E C,D 12 E 8 Design this layout using the decision rule of Longest Processing Time (LPT). What is the cycle time of this assembly line? a. 30 seconds b. 36 seconds O. 8 seconds d. 74 seconds e. 24 secondsarrow_forwardDiscuss the steps in location and selection of a service facility layout for a healthcare organization (in 500 words)arrow_forwardExplain what are the various steps in developing a cellular manufacturing layout?arrow_forward
- Design a layout on a 2x3 grid that satisfies the preferences listed below.arrow_forwardPlease answer letter A and B. Thank you.arrow_forwardYou are required to make a study on the layout design. In this line, you need to analyse the layout design and provide possible suggestions for improvement on the existing layout efficiency. You can consider either manufacturing or service providers in Oman. All the design and suggestion should be presented in a report for a submission. Tasks performed incl 1.Study the layout design of the existing systems. 2 Study the layout design of the suggested systems. 3. Suggest on the mechanism of improving the layout design.arrow_forward
- Describe three facility layout methods, identify one business example of each of the methods in detail? Then explain why that business would choose those particular layout methods?arrow_forwardNeed helparrow_forwardWhat is an ABC analysis, and how can you use it to design the layout of a warehouse?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.