Question
Chapter 7, Problem 1P
Summary Introduction
To determine: The best process for this contract.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Borges Machine Shop, Inc., has a 1-year contract for the production of 250,000 gear housings for a new off-road
vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has
developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing
system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow
General-Purpose
Equipment (GPE)
250,000
Annual contracted units
Annual fixed cost
$125,000
Per unit variable cost
$18.00
The option GPE is best when the contracted volume is below
Flexible Manufacturing
System (FMS)
250,000
$250,000
$14.00
D
Dedicated
Machine (DM)
250,000
$480,000
$13.00
units (enter your response as a whole number)
Borges Machine Shop, Inc. has a 1-year contract for the production of 200,000 gear housings for a new off-road vehicle Owner Luis Borges hopes the contract will be extended and the volume increased next year
Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM) The cost data follow
Annual contracted units
Annual fixed cost
General Purpose
Equipment (GPE)
200.000
$150.000
$15.00
Per unit variable cost
The option GEE is best when the contracted volume is below units (enter your response as a whole number)
Flexible Manufacturing
System (FMS)
200,000
$250.000
$14.00
Dedicated
Machine (DM)
200.000
$525,000
$13.00
Borges Machine Shop, Inc., has a 1-year contract for the production of 75,000 gear housings for a new off-road vehicle, Owner Luis Borges hopes the contract will be extended and the volume increased
next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The
cost data follow
Annual contracted units
Annual fixed cost
Per unit variable cost
General-Purpose
Equipment (GPE)
75,000
$100,000
$16.00
Flexible Manufacturing
System (FMS)
75,000
$225,000
$14.00
Dedicated
Machine (DM)
75,000
$450,000
$13.75
Based on the total cost, the process that is best suited for the current contracted volume is
Suppose the contracted volume changes to 275,000 gear housings. Based on the total cost, the process that is best suited for the new volume is
Suppose the contracted volume changes to 375,000 gear housings. Based on the total cost, the process that is best suited…
Chapter 7 Solutions
EBK PRINCIPLES OF OPERATIONS MANAGEMENT
Ch. 7.S - Prob. 1DQCh. 7.S - Prob. 2DQCh. 7.S - Prob. 3DQCh. 7.S - Prob. 4DQCh. 7.S - Prob. 5DQCh. 7.S - Distinguish between bottleneck time and throughput...Ch. 7.S - Prob. 7DQCh. 7.S - Prob. 8DQCh. 7.S - Prob. 9DQCh. 7.S - Prob. 10DQ
Ch. 7.S - Prob. 11DQCh. 7.S - Prob. 12DQCh. 7.S - What are the techniques available to operations...Ch. 7.S - Amy Xias plant was designed to produce 7,000...Ch. 7.S - For the post month, the plant in Problem S7.1,...Ch. 7.S - Prob. 3PCh. 7.S - Prob. 4PCh. 7.S - Prob. 5PCh. 7.S - The effective capacity and efficiency for the next...Ch. 7.S - Southeastern Oklahoma State Universitys business...Ch. 7.S - Prob. 8PCh. 7.S - Prob. 9PCh. 7.S - Prob. 10PCh. 7.S - The three-station work cell illustrated in Figure...Ch. 7.S - The three-station work cell at Pullman Mfg., Inc....Ch. 7.S - The Pullman Mfg., Inc., three-station work cell...Ch. 7.S - Prob. 14PCh. 7.S - 10 minutes per unit. Part 2 is simultaneously...Ch. 7.S - Prob. 16PCh. 7.S - Prob. 17PCh. 7.S - Using the data in Problem S7.17: a) What is the...Ch. 7.S - Prob. 19PCh. 7.S - Prob. 20PCh. 7.S - Prob. 21PCh. 7.S - Prob. 22PCh. 7.S - Prob. 23PCh. 7.S - Prob. 24PCh. 7.S - Prob. 25PCh. 7.S - Prob. 26PCh. 7.S - Prob. 27PCh. 7.S - Prob. 28PCh. 7.S - Prob. 29PCh. 7.S - Prob. 30PCh. 7.S - Prob. 31PCh. 7.S - Prob. 32PCh. 7.S - Prob. 33PCh. 7.S - Prob. 34PCh. 7.S - Prob. 35PCh. 7.S - Prob. 36PCh. 7.S - Prob. 37PCh. 7.S - Prob. 38PCh. 7.S - Prob. 39PCh. 7.S - Prob. 40PCh. 7.S - Prob. 41PCh. 7.S - Prob. 42PCh. 7.S - Prob. 43PCh. 7.S - Prob. 44PCh. 7.S - Prob. 45PCh. 7.S - Prob. 1VCCh. 7.S - a capacity expansion plan and a new 11-story...Ch. 7.S - a capacity expansion plan and a new 11-story...Ch. 7 - Ethical Dilemma For the sake of efficiency and...Ch. 7 - Prob. 1DQCh. 7 - Prob. 2DQCh. 7 - Prob. 3DQCh. 7 - Prob. 4DQCh. 7 - Prob. 5DQCh. 7 - Prob. 6DQCh. 7 - Prob. 7DQCh. 7 - Prob. 8DQCh. 7 - Prob. 9DQCh. 7 - Prob. 10DQCh. 7 - Prob. 11DQCh. 7 - Prob. 12DQCh. 7 - Prob. 13DQCh. 7 - Prob. 14DQCh. 7 - Prob. 15DQCh. 7 - Prob. 16DQCh. 7 - Prob. 17DQCh. 7 - Prob. 18DQCh. 7 - Prob. 19DQCh. 7 - Prob. 1PCh. 7 - Usingthedatain Problem 7.1, determinethemost...Ch. 7 - Prob. 3PCh. 7 - Refer to Problem 7.1. If a contract for the second...Ch. 7 - Stan Fawcetts company is considering producing a...Ch. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Metters Cabinets, Inc., needs to choose a...Ch. 7 - Prob. 10PCh. 7 - Nagle Electric. Inc., of Lincoln, Nebraska, must...Ch. 7 - Stapleton Manufacturing intends to increase...Ch. 7 - Prepare a flowchart for one of the following: a)...Ch. 7 - Prepare a process chart for one of the activities...Ch. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 1CSCh. 7 - Prob. 2CSCh. 7 - Prob. 3CSCh. 7 - Process Strategy at Wheeled Coach Wheeled Coach,...Ch. 7 - Prob. 1.2VCCh. 7 - Prob. 1.3VCCh. 7 - Prob. 1.4VCCh. 7 - Alaska Airlines: 20-Minute Baggage...Ch. 7 - Prob. 2.2VCCh. 7 - Prob. 2.3VCCh. 7 - Prob. 2.4VCCh. 7 - Prob. 2.5VCCh. 7 - Prob. 3.1VCCh. 7 - Prob. 3.2VCCh. 7 - Prob. 3.3VCCh. 7 - Prob. 3.4VC
Knowledge Booster
Similar questions
- Borges Machine Shop, Inc., has a 1-year contract for the production of 250,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General Purpose Equipment (GPE) Flexible Manufacturing System (FMS) 250,000 $125,000 $15.00 Annual contracted units Annual fixed cost Per unit variable cost The option GPE is best when the contracted volume is below units (enter your response as a whole number). Dedicated Machine (DM) 250,000 $225,000 $14.00 250,000 $525,000 $13.00arrow_forwardBorges Machine Shop, Inc., has a 1-year contract for the production of 250,000gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 250,000 250,000 250,000 Annual fixed cost $125,000 $200,000 $525,000 Per unit variable cost $16.00 $14.00 $13.00 The option GPE is best when the contracted volume is below…arrow_forwardBorges Machine Shop, Inc., has a 1-year contract for the production of 250,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 250,000 250,000 250,000 Annual fixed cost $125,000 $250,000 $500,000 Per unit variable cost $18.00 $14.00 $13.00 If the contract for the second and third years is pending, for…arrow_forward
- Borges Machine Shop, Inc., has a 1-year contract for the production of 75,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 75,000 75,000 75,000 Annual fixed cost $100,000 $200,000 $525,000 Per unit variable cost $15.00 $14.00 $13.75 Part 2 Based on the total cost, the process that is best suited for…arrow_forwardBorges Machine Shop, Inc., has a 1-year contract for the production of 75,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 75,000 75,000 75,000 Annual fixed cost $150,000 $250,000 $500,000 Per unit variable cost $16.00 $14.75 $13.00 Part 2 Based on the total cost, the process that is best suited for…arrow_forwardBorges Machine Shop, Inc., has a 1-year contract for the production of 200,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) 200,000 Annual contracted units Annual fixed cost Per unit variable cost $125,000 $16.00 If the contract for the second and third years is pending, for demand below 37,500 units, option FMS is the best alternative for Luis. For demand above 280,000 units, option is the best alternative for Luis 200,000 $200,000 $14.00 200,000 $480,000 $13.00arrow_forward
- Borges Machine Shop, Inc., has a 1-year contract for the production of 250,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: The option GPE is best when the contracted volume is below Annual contracted units Annual fixed cost Per unit variable cost General-Purpose Equipment (GPE) 250,000 $150,000 $18.00 units (enter your response as a whole number). Flexible Manufacturing System (FMS) 250,000 $250,000 $14.00 Dedicated Machine (DM) 250,000 $500,000 $13.00arrow_forwardBorges Machine Shop, Inc., has a 1-year contract for the production of 225,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM)Annual contracted units 225,000 225,000 225,000 Annual fixed cost $125,000 $250,000 $480,000 Per unit variable cost $18.00 $14.00 $13.00 a.The option GPE is best when the contracted volume is below ------ units (enter your response as a whole number).…arrow_forwardBorges Machine Shop, Inc., has a 1-year contract for the production of 225,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: General-Purpose Equipment (GPE) Flexible Manufacturing System (FMS) Dedicated Machine (DM) Annual contracted units 225,000 225,000 225,000 Annual fixed cost $100,000 $225,000 $480,000 Per unit variable cost $16.00 $14.00 $13.00 Part 2 The option GPE is best when the contracted volume is below…arrow_forward
- Borges Machine Shop, Inc., has a 1-year contract for the production of 225,000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow: The option GPE is best when the contracted volume is below General-Purpose Equipment (GPE) 225,000 Annual contracted units Annual fixed cost $150,000 $15.00 Per unit variable cost units (enter your response as a whole number). Flexible Manufacturing System (FMS) 225,000 $225,000 $14.00 Dedicated Machine (DM) 225,000 $480,000 $13.00arrow_forwardYou are hired as a consultant for Cool Zone Inc. The company currently has a 1-year contract for the production of 200,000 fuse-plugs for a new state of the art off-road vehicle. With an increasing demand for these vehicles, The owner however, hope that the contract will be extended which will result in increased volume next year. Cool Zone has developed cost for 3 alternatives namely: General-Purpose Equipment (GPE), Flexible manufacturing System (FMS) and expensive but market dominant machine (DM). The cost associated with labour, raw materials and equipment per unit produced is as follows: GPE is $15, while DM and FMS have an associated cost of $13 and $14 respectively. The cost associated with FMS is $200,000, GPE $ 100,000 and DM $500,000 respectively. Regardless of the decision made, the company has to produce a total of 200,000 fuse plugs. (a) Based on the information above, which is the best option for the contract? What technique was used to determine your answer? Provide an…arrow_forwardJupiter Game Company manufactures pocket electronic games. Last year Jupiter sold 25,000 games at $25 each. Total costs amounted to $525,000, of which $150,000 were considered fixed costs. In an attempt to improve its product, the company is considering replacing a component part that has a cost of $2.50 with a new and better part costing $4.50 per unit in the coming year. A new machine also would be needed to increase plant capacity. The machine would cost $18,000 with a useful life of six years and no salvage value. The company uses straight-line depreciation on all plant assets. (Ignore income taxes). 1) If management holds the sales price constant and makes the suggested changes, how many units of product must be sold in the coming year to break even?arrow_forward