Principles Of Operations Management
11th Edition
ISBN: 9780135173930
Author: RENDER, Barry, HEIZER, Jay, Munson, Chuck
Publisher: Pearson,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 6.S, Problem 55P
Summary Introduction
To determine: Average Outgoing Quality (AOQ).
Introduction: AOQ is the average quality of outgoing lots, which would be considered as the function of fraction defective. Both rejected and accepted lots would be included in outgoing lots.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
We want to determine the AOQ for an acceptance samplingplan when the quality of the incoming lots in percent defectiveis 1.5%, and then again when the incoming percent defective is 5%.T he sample size is 80 units for a lot size of 550 units. Furthermore,Pa at 1.5% defective levels is 0.95. At 5% incoming defective levels,the Pa is found to be 0.5. Determine the average outgoing qualityfor both incoming percent defective levels.
For 50 consecutive days, a process engineer has measured the weight of acomponent after it has been coated with a special paint. Each day, she takes a sampleof 10 components. The average across all 500 components (50 days, 10 componentsper day) is 45.343018 grams. The standard deviation across all parts is 0.0076382 gram.When constructing an X-bar chart, what would be the center line and what would be thelines for the upper and lower control limits?
please answer both the parts within 30 minutes.
Chapter 6 Solutions
Principles Of Operations Management
Ch. 6.S - Prob. 1DQCh. 6.S - Define in statistical control.Ch. 6.S - Prob. 3DQCh. 6.S - Prob. 4DQCh. 6.S - Prob. 5DQCh. 6.S - Prob. 6DQCh. 6.S - Prob. 7DQCh. 6.S - Prob. 8DQCh. 6.S - Prob. 9DQCh. 6.S - Prob. 10DQ
Ch. 6.S - Prob. 11DQCh. 6.S - Prob. 12DQCh. 6.S - Prob. 13DQCh. 6.S - Prob. 14DQCh. 6.S - Prob. 15DQCh. 6.S - Prob. 16DQCh. 6.S - Prob. 17DQCh. 6.S - Prob. 18DQCh. 6.S - Prob. 19DQCh. 6.S - Prob. 1PCh. 6.S - Prob. 2PCh. 6.S - Prob. 3PCh. 6.S - Prob. 4PCh. 6.S - Prob. 5PCh. 6.S - Prob. 6PCh. 6.S - Prob. 7PCh. 6.S - Prob. 8PCh. 6.S - Prob. 9PCh. 6.S - Prob. 10PCh. 6.S - Prob. 11PCh. 6.S - Prob. 12PCh. 6.S - Prob. 13PCh. 6.S - Prob. 14PCh. 6.S - Prob. 15PCh. 6.S - Prob. 16PCh. 6.S - Prob. 17PCh. 6.S - Prob. 18PCh. 6.S - Prob. 19PCh. 6.S - Prob. 20PCh. 6.S - Prob. 21PCh. 6.S - Prob. 22PCh. 6.S - Prob. 23PCh. 6.S - Prob. 24PCh. 6.S - Prob. 25PCh. 6.S - Prob. 28PCh. 6.S - Prob. 29PCh. 6.S - Prob. 30PCh. 6.S - Prob. 32PCh. 6.S - Prob. 33PCh. 6.S - Prob. 34PCh. 6.S - Prob. 35PCh. 6.S - Prob. 36PCh. 6.S - Prob. 37PCh. 6.S - Prob. 39PCh. 6.S - Prob. 40PCh. 6.S - Prob. 41PCh. 6.S - Prob. 42PCh. 6.S - Prob. 43PCh. 6.S - Prob. 44PCh. 6.S - Prob. 45PCh. 6.S - Prob. 46PCh. 6.S - Prob. 48PCh. 6.S - Prob. 49PCh. 6.S - Prob. 50PCh. 6.S - Prob. 51PCh. 6.S - Prob. 52PCh. 6.S - Prob. 53PCh. 6.S - Prob. 54PCh. 6.S - Prob. 55PCh. 6.S - Prob. 1CSCh. 6.S - Prob. 2CSCh. 6.S - Prob. 1.1VCCh. 6.S - Prob. 1.2VCCh. 6.S - Prob. 1.3VCCh. 6.S - Prob. 2.1VCCh. 6.S - Prob. 2.2VCCh. 6.S - Prob. 2.3VCCh. 6.S - Prob. 2.4VCCh. 6 - Prob. 1EDCh. 6 - Prob. 1DQCh. 6 - Prob. 2DQCh. 6 - Prob. 3DQCh. 6 - Prob. 4DQCh. 6 - Prob. 5DQCh. 6 - Prob. 6DQCh. 6 - Prob. 7DQCh. 6 - Prob. 8DQCh. 6 - Prob. 9DQCh. 6 - Prob. 10DQCh. 6 - Prob. 11DQCh. 6 - Prob. 12DQCh. 6 - Prob. 13DQCh. 6 - Prob. 14DQCh. 6 - Prob. 15DQCh. 6 - Prob. 16DQCh. 6 - Prob. 17DQCh. 6 - Prob. 18DQCh. 6 - An avant-garde clothing manufacturer runs a series...Ch. 6 - Prob. 2PCh. 6 - Prob. 3PCh. 6 - Prob. 4PCh. 6 - Kathleen McFaddens restaurant in Boston has...Ch. 6 - Prob. 6PCh. 6 - Prob. 7PCh. 6 - Prob. 8PCh. 6 - Prob. 9PCh. 6 - Prob. 10PCh. 6 - Prob. 11PCh. 6 - Prob. 12PCh. 6 - Prob. 13PCh. 6 - Prob. 14PCh. 6 - Prob. 15PCh. 6 - Prob. 16PCh. 6 - Prob. 17PCh. 6 - Prob. 18PCh. 6 - Prob. 19PCh. 6 - Prob. 20PCh. 6 - Prob. 21PCh. 6 - Prob. 1CSCh. 6 - Prob. 2CSCh. 6 - Prob. 3CSCh. 6 - Prob. 1.1VCCh. 6 - Prob. 1.2VCCh. 6 - Prob. 1.3VCCh. 6 - Prob. 1.4VCCh. 6 - Prob. 2.1VCCh. 6 - Prob. 2.2VCCh. 6 - Prob. 2.3VCCh. 6 - Prob. 2.4VCCh. 6 - Prob. 3.1VCCh. 6 - Prob. 3.2VCCh. 6 - Prob. 3.3VCCh. 6 - Prob. 3.4VCCh. 6 - Prob. 3.5VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A process filling small bottles with baby formula has a target of 3.1 ounces, plus or minus 0.255 ounce. Two hundred bottles from the process were sampled. The results showed the average amount of formula placed in the bottles to be 3.050 ounces. The standard deviation of the amounts was 0.068 ounce. Determine the value of Upper C Subscript pk. Roughly what proportion of bottles meet the specifications? The process capability index is (round your response to three decimal places).arrow_forwardDesign the Single Sampling Plan (SSP) that will accept 95% of the lots containing 2% defective parts and will accept only 5% of the lots containing 9% defective parts.arrow_forwardEttlie Engineering has a new catalyst injection system for your countertop production line. Your process engineering departmenthas conducted experiments and determined that the mean is 8.01 grams with a standard deviation of .03. Your specificationsare: m = 8.0 and s = .04, which means an upper specification limit of 8.12 [ = 8.0 + 3(.04)] and a lower specification limit of7.88 [= 8.0 - 3(.04)].What is the Cpk performance of the injection system?arrow_forward
- A process filling small bottles with baby formula has a target of 3ounces ± 0.150 ounce. Two hundred bottles from the process were sampled. The results showed the average amount of formula placed in the bottles to be 3.042 ounces. The standard deviation of the amounts was 0.034 ounce. Determine the value of Cpk. Roughly what proportion of bottles meet the specifications? The process capability index (Cpk) is ?? enter your response here (round your response to three decimal places).▼ Slightly more than 80 , 99.99, 99.73, 9095.45 ?? %of the bottles meet the specifications. Which of the number above is slightly more than?arrow_forwardOrganic Grains LLC uses statistical process control to ensure that its health-conscious, low-fat, multigrain sandwich loaves have the proper weight. Based on a previously stable and in-control process, the control limits of the x- and R-charts are: UCL-4.86, LCL- = 4.52, UCLR=1.344, LCLR = 0. Over the past few days, they have taken five random samples of four loaves each and have found the following: Based on the x-chart, is one or more samples beyond the control limits? Sample 1 2 3 4 5 Yes No Loaf # 1 4.8 4.4 4.5 4.6 5.0 Net Weight Loaf # 2 4.7 4.8 4.5 4.9 4.8 Loaf # 3 5.0 4.7 4.9 4.7 4.7 Loaf # 4 4.7 4.8 4.6 4.5 4.6arrow_forwardA lot 5% defective is submitted to a single sampling plan with rectifying inspection,N=500, n=120, c=3. What is average outgoing quality?arrow_forward
- A sampling plan is desired to have a producer's risk of 0.10 at AQL -0.8% and a consumer's risk of 0.05 at LQL-7.5% nonconforming Find the single sampling plan that meets the consumer's stipulation and comes as close as possible to meeting the producer's stipulation.arrow_forwardDistinguish between a sampling error and a nonsampling error.How can each be reduced?arrow_forwardIn a sausage factory, quality managers are studying the compliance of the sausages with the requirements. Any sausage having pin holes, air pockets, deformation or breakage in its casings is counted as defective and total number of such defective sausages alone is noted in each shift. The following data represents the number of defective sausages in samples of 200 sausages taken from 10 shifts. Sample Defectives Percent Defective 1 40 20% 2 28 14% 3 15 8% 4 23 (a) 5 20 10% 6 21 11% 7 19 10% 8 15 8% 9 16 8% 10 17 9% Calculate the value for (a) in the table above. Calculate p-bar based on the samples above. What is the UCL and LCL for a p chart based on the data provided and a desired control level of 99.74%? Use your control limits from part b along with the data provided to draw a p-chart. Is the process in control? Why or why not? If not in control, suggest some potential reasons.arrow_forward
- Auto pistons at Wemming Chung's plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 5 pistons produced each day, the mean and the range of this diameter have been as follows: Day Mean (mm) Range R (mm) 158 4.3 151.2 4.4 155.7 4.2 153.5 4.8 156.6 4.5 What is the UCL using 3-sigma?(round your response to two decimal places). 1. 2. 4.arrow_forwardCan someone please explain to me how to complete 3-sigma control limits (upper and Lower) using Excel? This is the question I am trying to answer: Thirty-five samples of size 7 each were taken from a fertilizer-bag-filling machine at Panos Kouvelis Lifelong Lawn Ltd. The results were: Overall mean = 57.75 lb., Average range R = 1.78 lb.a) For the given sample size, the control limits for 3-sigma x chart are:Upper Control Limit (UCL) = ____Ib (round your response to three decimal places)arrow_forward3. Using MIL-STD, determine the single sampling plans for the following information: Number Inspection Tightened Normal Inspection Level AQL Lot Size 1 1.5% 1,400 2 6.5% 115 3 II Reduced 0.40% 160,000 4 II Normal 2.5% 27 NOTE: Sampling plan should contain Inspection Type – whether normal etc. AQL N = lot size, n = sample size, C = acceptance number r = rejection numberarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.