Practical Management Science
6th Edition
ISBN: 9781337406659
Author: WINSTON, Wayne L.
Publisher: Cengage,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 3, Problem 35P
Summary Introduction
To determine: The way to maximize the profit of the firm using solver.
Introduction: In linear programming, the unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints, then it is said to be an unfeasible solution.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
A Company produces a component for use in the aerospace industry. The component consists of three parts (A, B and C), which are purchased externally and cost 50c, 60c and 70c per piece respectively. Parts A and B are assembled first on assembly line 1, which produces 150 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are six drilling machines in total, but only three are currently operational. Each drilling machine drills part C at a rate of 30 parts per hour. The final assembly line has a production capacity of 100 components per hour. At present, components are produced eight hours a day, five days a week.
If the need arises, management can add a second shift of eight hours for the assembly lines only.
The cost of assembly labour is 40c per assembly operation for each assembly line; the cost of drilling labour is 20c per part. For drilling, the cost of electricity is 10c per part. The overhead cost…
Sawing
20 min/unit
Sanding
20 min/unit
Drilling
32 min/unit
Welding
30 min/unit
Assembly
93 min/unit
Assembly
93 min/unit
Assembly
93 min/unit
A production process is shown in the figure above. The drilling operation occurs
separately from, and simultaneously with the sawing and sanding operations.
Welding starts when both drilling and sanding operations have been completed.
After welding, a product needs to go through only one of the three assembly
operations (the operations are in parallel, where parallel lines perform the exact same
operation). Considering the process times at stations, what is the process time of the
system (in min/unit)?
Knott's Berry Farm is contemplating buying a new van for its operations. The farm's engineering
staff has researched the market and found 2 units that appear to meet their requirements. Truck
# 1 has a cost of $37,000 and requires an annual maintenance cost of $2,700. At the end of its useful
life (3 years), it is projected to have a salvage value of $5,000. On the other hand, Truck #2 has an
initial cost of $40,000 and requires only $2,000 in annual operating costs because the manufacturer
is claiming that some routine maintenance is covered in the price of the truck. Truck # 2 has an
estimated salvage value of $8,000 at the end of its 4 year service life. The CEO has determined that
the farm's MARR is 12%. The trucks are needed for 12 years according to the 2024 Strategic Plan.
The Engineering Department has determined that no significant changes are needed in the future
that would change prices and functional characteristics of each truck. As a member of the
Engineering Department,…
Chapter 3 Solutions
Practical Management Science
Ch. 3.6 - Prob. 1PCh. 3.6 - Prob. 2PCh. 3.6 - Prob. 3PCh. 3.6 - Prob. 4PCh. 3.6 - Prob. 5PCh. 3.6 - Prob. 6PCh. 3.6 - Prob. 7PCh. 3.6 - Prob. 8PCh. 3.6 - Prob. 9PCh. 3.7 - Prob. 10P
Ch. 3.7 - Prob. 11PCh. 3.7 - Prob. 12PCh. 3.7 - Prob. 13PCh. 3.7 - Prob. 14PCh. 3.7 - Prob. 15PCh. 3.7 - Prob. 16PCh. 3.7 - Prob. 17PCh. 3.8 - The Pigskin Company produces footballs. Pigskin...Ch. 3.8 - The Pigskin Company produces footballs. Pigskin...Ch. 3.8 - The Pigskin Company produces footballs. Pigskin...Ch. 3.8 - Prob. 21PCh. 3.8 - Prob. 22PCh. 3.8 - Prob. 23PCh. 3.8 - Prob. 24PCh. 3 - Prob. 25PCh. 3 - Prob. 26PCh. 3 - Prob. 27PCh. 3 - Prob. 28PCh. 3 - Prob. 29PCh. 3 - Prob. 30PCh. 3 - Prob. 31PCh. 3 - Prob. 32PCh. 3 - Prob. 33PCh. 3 - Prob. 34PCh. 3 - Prob. 35PCh. 3 - Prob. 36PCh. 3 - Prob. 37PCh. 3 - Prob. 38PCh. 3 - Prob. 39PCh. 3 - Prob. 40PCh. 3 - Prob. 41PCh. 3 - Prob. 42PCh. 3 - Prob. 43PCh. 3 - Prob. 44PCh. 3 - Prob. 45PCh. 3 - Prob. 46PCh. 3 - Prob. 47PCh. 3 - Prob. 48PCh. 3 - Prob. 49PCh. 3 - Prob. 50PCh. 3 - Prob. 51PCh. 3 - Prob. 52PCh. 3 - Prob. 1C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- There is an upstream Picking department that feeds two downstream Packing departments: Pack Singles and Pack Multis. Those Packing departments feed to a Shipping department that loads the outgoing trucks. 40% of your Pick volume goes to Pack Singles and has a packing rate of 104 units per labor hour (uph). 60% of the Pick volume goes to Pack Multis and has a pack rate of 215 units per labor hour. Your pickers pick both Single and Multi items throughout the day at an overall average rate of 114 units per labor hour. All units that are packed in both processes go through the Ship process at a rate of 570 units per hour. You have 102 people today for all 4 departments and you absolutely must pack 47,880 units in Pack Multis Items to meet a customer promise metric. How do you allocate labor to balance the flow in your department if you work a 10 hour shift? Do not assume breaks or lunches in your answer. Redirect 1: You now need to process all of the Pack Singles Volume in the first 5…arrow_forwardDigital Controls, Inc. (DCI), manufactures two models of a radar gun used by police to monitor the speed of automobiles. Model A has an accuracy of plus or minus 1 mile per hour, whereas the smaller model B has an accuracy of plus or minus miles per hour. For the next week, the company has orders for 100 units of model A and 150 units of model B. Although DCI purchases all the electronic components used in both models, the plastic cases for both models are manufactured at a DCI plant in Newark, New Jersey. Each model A case requires 4 minutes of injection-molding time and 6 minutes of assembly time. Each model B case requires 3 minutes of injection-molding time and 8 minutes of assembly time. For next week, the Newark plant has 600 minutes of injection-molding time available and 1,080 minutes of assembly time available. The manufacturing cost is $10 per case for model A and $6 per case for model B. Depending upon demand and the time available at the Newark plant, DCI occasionally…arrow_forwardThe Farm-4-Less tractor company produces a grain combine (GC) in addition to both a large (LT) and small size tractor (SM). Its production manager desires to produce to customer demand using a mixed-model production line. The current sequence of production, which is repeated 30 times during a shift, is SM-GC-SM-LT-SM-GC-LT-SM. A new machine isproduced every 2 minutes. The plant operates two 8-hour shifts. There is no downtime because the 4 hours between each shift are dedicated to maintenance and restocking raw material. Based on this information, answer the following questions.a. How long does it take the production cycle to be completed?b. How many of each type of machine does Farm-4-Less produce in a shift?arrow_forward
- A recurring maintenance job in a factory is being done by a three-man crew. Due to the nature of the job and space limitations, it was observed that two of the men were idle 37% of the time; one of the men was also idle an additional of the time, and at any given time only one man was required. The men were each paid P24.00 per hour. Each time the job was performed a set of tools and equipment with a value equivalent to P36.00 per hour was used. If the three-men crew could complete the work in 5 hours, which crew size would be the most economicalarrow_forwardA computer recycler sells computer enclosures to a computer remanufacturer. To meet monthly expected demand, the remanufacturer needs 2.000 enclosures. The recycler utilizes a four-step disassembly process with scrap rates given as follows: d1=0.08, d2=0.05, d3=0.05, and d4=0.03. How many computers must be recycler receive each month in order to meet the remanufacturer’s demand?arrow_forwardA fleet repair facility has the capacity to repair 800 trucks per month. However, due to scheduled maintenance of their equipment, management feels that they can repair no more than 600 trucks per month. Last month, two of the employees were absent several days each, and only 400 trucks were repaired. [Kemudahan pembaikan armada berkapasiti untuk memperbaiki 800 trak sebulan. Namun, penyelenggaraan peralatan mereka yang telah dijadualkan, pihak pengurusan berpendapat bahawa mereka tidak dapat membaiki lebih dari 600 trak sebulan. Bulan lalu, dua pekerja tidak hadir setiap hari, dan hanya 400 trak yang dapat diperbaiki..] (a) Calculate the utilization of the repair shop. [Kirakan penggunaan kedai membaiki.] i) Calculate the efficiency of the repair shop. [Kirakan kecekapan kedai membaiki.] ii)arrow_forward
- Atlanta Manufacturing Company produces products W, X, Y, and Z through a joint process. The joint costs amount to $250,000. Product Units Produced Sales Value at Split-Off Additional Costs of Processing Sales Value After Processing W 750 $10,000 $2,500 $15,000 X 1,500 $30,000 $3,000 $35,000 Y 1,000 $20,000 $4,000 $25,000 Z 1,500 $40,000 $6,000 $45,000 If W is processed further, profits of W will: 1) Increase by $2,500 2) Increase by $12,500 3) Decrease by $23,000 4) Increase by $5,000arrow_forwardIn a sandwich production factory, making each ham and cheese sandwich consists of a number of activities which totally take 7 minutes. The production line for ham and cheese sandwich has five workers who work 12 hours a day. What is the maximum number of ham and cheese sandwiches they canmake in this production line?a) 465 b) 425c) 612 d) 514e) 102arrow_forwardQuitmeyer Elec-tronics Incorporated manufactures the following six microcomputer peripheral devices: internal mo-dems, external modems, graphics circuit boards, CD drives, hard disk drives, and memory expansionboards. Each of these technical products requirestime, in minutes, on three types of electronic testingdevices, as shown in the table on this page.The first two test devices are available 120hours per week. The third (device 3) requires morepreventive maintenance and may be used only 100 hours each week. The market for all six computer components is vast, and Quitmeyer Electronics be-lieves that it can sell as many units of each product as it can manufacture. The table that follows summa-rizes the revenue and material cost for each product: DEVICE REVENUE PERUNIT SOLD ($) MATERIAL COSTPER UNIT ($)Internal modem 200 35External modem 120 25Graphics circuit board 180 40CD drive 130 45Hard disk drive 430 170Memory expansionboard 260 60 In addition, variable labor costs are $15…arrow_forward
- There is a manufacturing company that has a dedicated production line to make one specific product. The line has three stations working in serial. Inputs arrive at station 1 and the output from station 1 becomes the input to station 2. The output from station 2 is the input to station 3. The output from station 3 is the finished product. Station 1 can process 500 units per week, station 2 can process 300 units per week, and station 3 can process 400 units per week. illustrates this problem. Question Answer ↓ What is the maximum output number per week?arrow_forwardA new highway is to be constructed. Design A calls for a concrete pavement costing $80 per foot with a 20-year life; four paved ditches costing $3 per foot each; and two box culverts every mile, each costing $9,000 and having a 20-year life. Annual maintenance will cost $1,800 per mile; the culverts must be cleaned every five years at a cost of $350 each per mile. Design B calls for a bituminous pavement costing $55 per foot with a 10-year life; three sodded ditches costing $1.45 per foot each; and four pipe culverts every mile, each costing $2,100 and having a 10-year life. The replacement culverts will cost $2,350 each. Annual maintenance will cost $2,900 per mile; the culverts must be cleaned yearly at a cost of $215 each per mile; and the annual ditch maintenance will cost $1.35 per foot per ditch. Compare the two designs on the basis of equivalent worth per mile for a 20-year period. Find the most economical design on the basis of AW and PW if the MARR is 6% per…arrow_forwardA production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). 7 units/hr 5 units/hr Assembly 0.8 units/hr Sawing Sanding Welding Assembly 2.1 units/hr 0.8 units/hr Drilling 2.5 units/hr Assembly 0.8 units/hr a) is the bottleneck. b) The bottleneck time is minutes per unit (round your response to two decimal places). c) The throughput time of the overall system is minutes (round your response to two decimal places).arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.