Concept explainers
a)
To determine: The daily production plan which would minimize the cost of meeting the daily demand of the company.
Introduction: In linear programming, the unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints, then it is said to be an unfeasible solution.
a)

Explanation of Solution
Determine the daily production plan which would minimize the cost of meeting the daily demand of the company using solver:
Figure (1)
Formulae to determine the total cost:
Figure (2)
Solver parameters are given as follows:
Figure (3)
b)
To draw: The daily production plan which would minimize the cost of meeting the daily demand of the company graphically.
Introduction: In linear programming, the unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints, then it is said to be an unfeasible solution.
b)

Explanation of Solution
Determine the daily production plan which would minimize the cost of meeting the daily demand of the company:
Figure (1)
Draw the graph:
Figure (4)
c)
To determine: The increase in the total cost before the change in the decision variable.
Introduction: In linear programming, the unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints, then it is said to be an unfeasible solution.
c)

Explanation of Solution
Determine the daily production plan which would minimize the cost of meeting the daily demand of the company:
Figure (1)
Solver table:
Figure (5)
In figure (1), the cost of process 2 should be increased from $100 to $1,000 to determine the total cost shown in above solver table (figure (5)).
Want to see more full solutions like this?
Chapter 3 Solutions
Practical Management Science
- The importance of interviewing potential food service aides and how can a nutritionist utilize this in their career? Please not just a short explanation.arrow_forwardWhat role does job analysis and job evaluation play in the compensation decision? Give an example of an organization NO AIarrow_forwardI did the first half correct! Please help me with the second half, not quite sure of the naive approach. Thanks in advance!arrow_forward
- Because my tutor and I didnt get it rightarrow_forwardOperations Managementarrow_forwardHow does wellness reflect and impact the past and the future of our health as a workout routine? What are the obstacles during the workout routine, and how do you overcome the obstacles? What are the best solutions to plan and accomplish the wellness?arrow_forward
- My last question! Thank you all for helping me better understand how OM works. If you can assist me for this one I'd be very thankful. Can you explain it step by step?I know now that LS is late start, and ES is early start. - •Activities on the critical path are? •The total project completion time for Rafay Ishfaq's software firm is how many weeks?•Determine the slack time for each of the activities for A-F •What is the total slack for the non critical paths in Rafays project?arrow_forwardThank you so much! I was able to answer C without help! Can you assist me with slack time for A-F? I believe A=0arrow_forwardThere's 8 parts, but I need some help with them. I always get confused on which is most critical of a patharrow_forward
- Menu Item Sales and Cost Data Taco Salad: Number Sold: 127; Item Cost: $0.71; Selling Price: $3.25 Lasagna: Number Sold: 48; Item Cost: $0.92; Selling Price: $4.67 Chicken: Number Sold: 31; Item Cost: $1.20; Selling Price: $3.00 Green Beans: Number Sold: 14; Item Cost: $0.20; Selling Price: $1.00 Corn: Number Sold: 13; Item Cost: $0.24; Selling Price: $1.00 Rice: Number Sold: 9;Item Cost: $0.13; Selling Price: $1.00 Menu Item Classification: Low contribution margin, low menu mix % DOG High contribution margin, low menu mix % PUZZLE Low contribution margin, high menu mix % PLOWHORSE High contribution margin, high menu mix o/o STAR QUESTION 1 Complete the menu analyses worksheet below. Calculations will be done using the information above. Restaurant: Date: MealPeriod: (A) ☐ (B) (C) (D) (E) (F) (G) (H) (1) (J) Menu Mix Popularity % Item Item Sold/(Menu Mix Menu Menu Item Food Menu Contribution Contribution Contribution Category Item Mix %): (B/K) Cost Selling Margin Price Margin (E-D)…arrow_forward1) Around the Clock Production of Fire Nozzles View the videos Around the Clock Production of Fire Nozzles 1 https://media.gaspar.mheducation.com/GASPARPlayer/play.html?id=132KoZwS0yMEgsToDUsZjJe (9.44 minutes, Ctrl+Click on the link) and Around the Clock Production of Fire Nozzles 2 https://media.gaspar.mheducation.com/GASPARPlayer/play.html?id=44JM0cKtFLqHP5bad6KOHAm (7.43 minutes, Ctrl+Click on the link); what are your key takeaways (tie to one or more of the topics discussed in Chapters 12 and/or 13) after watching these videos. Note: As a rough guideline, please try to keep the written submission to one or two paragraphs. 2) Cyberdyne Systems stocks and sells Cyberdyne glucose meters. The firm gathered the following information from its South Pasadena office: Demand = 19,500 units per year Ordering cost = $25 per order Holding cost = $4 per unit per year The firm’s operations manager wants to calculate the: a) EOQ for the glucose meters. b) Annual holding costs for the…arrow_forwardIn the following problems assume, unless otherwise stated, that S = $40, σ = 30%, r =8%,and δ =0. 13.1 Suppose you sell a 45-strike call with 91 days to expiration. What is delta? If the option is on 100 shares, what investment is required for a delta-hedged portfolio? What is your overnight profit if the stock tomorrow is $39? What if the stock price is $40.50?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,