Question
Chapter 3, Problem 33P
a)
Summary Introduction
To determine: The way to meet the goal of the company.
Introduction: In linear programming, the unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints, then it is said to be an unfeasible solution.
b)
Summary Introduction
To investigate: The effects of changing the customer demand for each product by the factor 1+k.
Introduction: In linear programming, the unbounded solution would occur when the objective function is infinite. If no solution satisfied the constraints, then it is said to be an unfeasible solution.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
A company has one machine which can be used to make product Alpha and product Beta.
Each unit of product Alpha requires 45 minutes of machine time, while
each unit of product Beta requires 37 minutes of machine time.
The machine can be used for 8 hours per day and 5 days per week.
Next week the company will produce 23 units of product Alpha.
After completing the production of Alpha, the company will produce product Beta.
How many units of product Beta can be produced next week?
Use at least 4 decimals.You must showm your calculation steps and brief explanation on your Excel spreadsheets.
Software EG, a retail company, orders two kinds of software from TeleHard Software. Annually, Software EG sells 800 units of product 1 and 400 units of product 2. The unit purchasing cost is $30 per unit of product 1 and $25 per unit of product 2. It costs $5 to store a unit of either product for a year. The cost of placing an order for either product separately or both products together is $100. Software EG’s annual cost of capital is 14%. Determine a costminimizing ordering policy
A company sells seven types of boxes, ranging in volume from 17 to 33 cubic feet. The demand and size of each box are given as:
Box Type 1 | 2 | 3 | 4 | 5 | 6 | 7
Size 33 | 30 | 26 | 24 | 19 | 18 | 17
Demand 400 | 300 | 500 | 700 | 200 | 400 | 200
The variable cost (in dollars) of producing each box is equal to the box's volume. A fixed cost of $1,000 is incurred to produce any quantity of a particular box. If the company desires, demand for any type of box can be satisfied by a box of a larger size. Formulate but do not solve an interger linear program, model to determine the minimum cost of meeting the demand for boxes. Be sure to define your decision variables. Your objective function and constraints must be linear functions; do not multiply decision variables by each other.
For the above problem, I'm having some trouble with defining the constraints for a linear integer and would appreciate some assistance.
Chapter 3 Solutions
Practical Management Science
Ch. 3.6 - Prob. 1PCh. 3.6 - Prob. 2PCh. 3.6 - Prob. 3PCh. 3.6 - Prob. 4PCh. 3.6 - Prob. 5PCh. 3.6 - Prob. 6PCh. 3.6 - Prob. 7PCh. 3.6 - Prob. 8PCh. 3.6 - Prob. 9PCh. 3.7 - Prob. 10P
Ch. 3.7 - Prob. 11PCh. 3.7 - Prob. 12PCh. 3.7 - Prob. 13PCh. 3.7 - Prob. 14PCh. 3.7 - Prob. 15PCh. 3.7 - Prob. 16PCh. 3.7 - Prob. 17PCh. 3.8 - The Pigskin Company produces footballs. Pigskin...Ch. 3.8 - The Pigskin Company produces footballs. Pigskin...Ch. 3.8 - The Pigskin Company produces footballs. Pigskin...Ch. 3.8 - Prob. 21PCh. 3.8 - Prob. 22PCh. 3.8 - Prob. 23PCh. 3.8 - Prob. 24PCh. 3 - Prob. 25PCh. 3 - Prob. 26PCh. 3 - Prob. 27PCh. 3 - Prob. 28PCh. 3 - Prob. 29PCh. 3 - Prob. 30PCh. 3 - Prob. 31PCh. 3 - Prob. 32PCh. 3 - Prob. 33PCh. 3 - Prob. 34PCh. 3 - Prob. 35PCh. 3 - Prob. 36PCh. 3 - Prob. 37PCh. 3 - Prob. 38PCh. 3 - Prob. 39PCh. 3 - Prob. 40PCh. 3 - Prob. 41PCh. 3 - Prob. 42PCh. 3 - Prob. 43PCh. 3 - Prob. 44PCh. 3 - Prob. 45PCh. 3 - Prob. 46PCh. 3 - Prob. 47PCh. 3 - Prob. 48PCh. 3 - Prob. 49PCh. 3 - Prob. 50PCh. 3 - Prob. 51PCh. 3 - Prob. 52PCh. 3 - Prob. 1C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Please see attached file.arrow_forwardCreate spreadsheets and use Solver to determine the correct volumes to be produced to minimize cost for the following problem. Your company has two trucks that it wishes to use on a specific contract. One is a new truck the company is making payments on, and one is an old truck that is fully paid for. The new truck’s costs per mile are as follows: 54₵ (fuel/additives), 24₵ (truck payments), 36₵ (driver), 12₵ (repairs), and 1₵ (misc.). The old truck’s costs are 60₵ (fuel/additives), 0₵ (truck payments), 32₵ (rookie driver), 24₵ (repairs), and 1₵ (misc.). The company knows that truck breakdowns lose customers, so it has capped estimated repair costs at $14,000. The total distance involved is 90,000 miles (to be divided between the two trucks).arrow_forwardFive to six times a year, Kicker puts on tent sales in various cities throughout Oklahoma and the surrounding states. The tent sales are designed to show Kicker customers new products, engender enthusiasm about those products, and sell soon to be out-of-date products at greatly reduced prices. Each tent sale lasts one day and requires parking lot space to set up the Kicker semitrailer; a couple of show cars; a disc jockey playing music; a tent to sell Kicker merchandise, distribute brochures, and so on. Last year, the Austin, TX tent sale was held in a corner of the parking lot outside the city exhibition hall where the automotive show was in progress. Because most customers were interested more in the new model cars than in the refurbishment of their current cars, foot traffic was low. In addition, customers did not want to carry speakers and amplifiers all the way back to where they had originally parked. Total direct costs for this tent sale were $14,300. Direct costs…arrow_forward
- You are required to create the following tables in a database named STUDENT_REGISTRATIONS. Ensure that you create the database and table objects exactly as depicted below. STUDENTS STUDENT_ID VARCHAR(8) NOT NULL PRIMARY KEY STUDENT_NAME VARCHAR(40) NOT NULL STUDENT_SURNAME VARCHAR(40) NOT NULL MODULES MODULE_ID VARCHAR(8) NOT NULL PRIMARY KEY MODULE_NAME VARCHAR(40) NOT NULL MODULE_CREDIT SMALLINT NOT NULL STUDENT_MODULES STUDENT_ID VARCHAR(8) NOT NULL PRIMARY KEY FOREIGN KEY REFERENCES STUDENTS(STUDENT_ID) MODULE ID VARCHAR(8) NOT NULL PRIMARY KEY FOREIGN KEY REFERENCES MODULES(MODULE_ID) LECTURERS LECTURER_ID VARCHAR(8) NOT NULL PRIMARY KEY LECTURER_NAME VARCHAR(40) NOT NULL LECTURER_SURNAME VARCHAR(40) NOT NULL O The Independent Institute of Education (Pty) Ltd 2021 Page 3 of 10 19, 20; 21 2021 LECTURER_MODULES MODULE_ID VARCHAR(8) NOT NULL PRIMARY KEY FOREIGN KEY REFERENCES MODULES(MODULE_ID) LECTURER_ID VARCHAR(8) NOT NULL PRIMARY KEY FOREIGN KEY REFERENCES LECTURERS(LECTURER_ID)arrow_forwardNice-Fit is a (fictional) small business producing outfits for costume parties and specialoccasions. Custom designs can be tailored to a customer’s request. Tom and Ann are theowners of the company and source all the fabric, design the outfits and make the costumesthemselves. Tom and Ann keep spreadsheets with information on the material purchased andcostumes made, but they find it difficult to keep track of their products, raw materials, andsales. The raw materials are supplied from a fabric company in India, and the production takesplace in a manufacturing company in China. The clothing is sold at local weekend markets,sold, or rented through costume hire shops, and sold at their physical store. Tom and Annreceive a small percentage of the sales and rentals of their costumes from the hire shops.They have no information on customers other than those who request custom designsdirectly from them. In 2020, the Covid-19 pandemic had a major impact on global economies,businesses and how we…arrow_forwardFRUIT COMPUTER COMPANY Fruit Computer Company manufactures memory chips in batches of ten chips. From past experience, Fruit knows that 80% of all batches contain 10% (1 out of 10) defective chips, and 20% of all batches contain 50% (5 out of 10) defective chips. If a good (that is, 10% defective) batch of chips is sent to the next stage of production, processing costs of $4000 are incurred, and if a bad batch (50% defective) is sent on to the next stage of production, processing costs of $16000 are incurred. Fruit also has the alternative of reworking a batch at a cost of $4000. A reworked batch is sure to be a good batch. Alternatively, for a cost of $400, Fruit can test one chip from each batch in an attempt to determine whether the batch is defective. QUESTIONS 1.Determine a strategy so Fruit can minimize the expected total cost per batch. 2.Compute the EVSI and EVPI.arrow_forward
- Please answer question completely and explain your answerarrow_forwardA company makes four products that have the following characteristics:Product A sells for $75 but needs $40 of materials to produce; Product B sells for $90 but needs $65 ofmaterials to produce; Product C sells for $110 but needs $80 of materials to produce; Product D sells for$135 but needs $105 of materials to produce. The processing requirements for each product on each ofthe four machines are shown in the table. Work centers W, X, Y, and Z are available for 5 days per week, 1 shift per day (8 hrs.) and have no setuptime when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In thequestions that follow, the traditional method refers to maximizing the contribution margin per unit foreach product, and the bottleneck method refers to maximizing the contribution margin per minute at thebottleneck for each product. Each worker is paid $15 per hour and is paid for an entire week, regardlessof how much the worker is used. Using the bottleneck method,…arrow_forwardA company makes four products that have the following characteristics:Product A sells for $75 but needs $40 of materials to produce; Product B sells for $90 but needs $65 ofmaterials to produce; Product C sells for $110 but needs $80 of materials to produce; Product D sells for$135 but needs $105 of materials to produce. The processing requirements for each product on each ofthe four machines are shown in the table. Work centers W, X, Y, and Z are available for 5 days per week, 1 shift per day (8 hrs.) and have no setuptime when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In thequestions that follow, the traditional method refers to maximizing the contribution margin per unit foreach product, and the bottleneck method refers to maximizing the contribution margin per minute at thebottleneck for each product. Each worker is paid $15 per hour and is paid for an entire week, regardlessof how much the worker is used. Question: 1. Which Process…arrow_forward
- A company makes four products that have the following characteristics:Product A sells for $75 but needs $40 of materials to produce; Product B sells for $90 but needs $65 ofmaterials to produce; Product C sells for $110 but needs $80 of materials to produce; Product D sells for$135 but needs $105 of materials to produce. The processing requirements for each product on each ofthe four machines are shown in the table. Work centers W, X, Y, and Z are available for 5 days per week, 1 shift per day (8 hrs.) and have no setuptime when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In thequestions that follow, the traditional method refers to maximizing the contribution margin per unit foreach product, and the bottleneck method refers to maximizing the contribution margin per minute at thebottleneck for each product. Each worker is paid $15 per hour and is paid for an entire week, regardlessof how much the worker is used. Using the traditional…arrow_forwardA company makes four products that have the following characteristics:Product A sells for $75 but needs $40 of materials to produce; Product B sells for $90 but needs $65 ofmaterials to produce; Product C sells for $110 but needs $80 of materials to produce; Product D sells for$135 but needs $105 of materials to produce. The processing requirements for each product on each ofthe four machines are shown in the table. Work centers W, X, Y, and Z are available for 5 days per week, 1 shift per day (8 hrs.) and have no setuptime when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In thequestions that follow, the traditional method refers to maximizing the contribution margin per unit foreach product, and the bottleneck method refers to maximizing the contribution margin per minute at thebottleneck for each product. Each worker is paid $15 per hour and is paid for an entire week, regardlessof how much the worker is used. Using the bottleneck method,…arrow_forwardA company makes four products that have the following characteristics:Product A sells for $75 but needs $40 of materials to produce; Product B sells for $90 but needs $65 ofmaterials to produce; Product C sells for $110 but needs $80 of materials to produce; Product D sells for$135 but needs $105 of materials to produce. The processing requirements for each product on each ofthe four machines are shown in the table. Work centers W, X, Y, and Z are available for 5 days per week, 1 shift per day (8 hrs.) and have no setuptime when switching between products. Market demand is 50 As, 60 Bs, 70 Cs, and 80 Ds per week. In thequestions that follow, the traditional method refers to maximizing the contribution margin per unit foreach product, and the bottleneck method refers to maximizing the contribution margin per minute at thebottleneck for each product. Each worker is paid $15 per hour and is paid for an entire week, regardlessof how much the worker is used. Using the bottleneck method,…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,