What effect does a BUE have on the diameter of the workpiece in turning?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A mild steel specimen of Initial diameter of 53.5 mm is turned to final diameter of 47 mm for an initial length of 154 mm on a lathe machine.
Using the given data find the following.
(i) Feed of 0.4 mm/rev & Depth of cut is 0.5 mm
(ii) During machining the tool's approach length is 5 mm, over run length is 2mm
(iii) Total time required to complete the turning operation is 59.6 minutes
A mild steel specimen of Initial diameter of
53.5 mm is turned to final diameter of 47 mm
for an initial length of 154 mm on a lathe
machine.
Using the given data find the following.
(i) Feed of 0.4 mm/rev & Depth of cut is 0.5
mm
(ii) During machining the tool's approach
length is 5 mm, over run length is 2mm
(iii) Total time required to complete the
turning operation is 59.6 minutes
(a) Find number of passes to finish the entire
turning operation (
(b) The actual length of the turning operation
in mm ('
A mild steel specimen of Initial diameter of
51.5 mm is turned to final diameter of 48 mm
for an initial length of 151 mm on a lathe
machine.
Using the given data find the following.
(i) Feed of 0.1 mm/rev & Depth of cut is 0.5
mm
(ii) During machining the tool's approach
length is 7 mm, over run length is 2mm
(iii) Total time required to complete the
turning operation is 48.8 minutes
(a) Find number of passes to finish the entire
turning operation
(b) The actual length of the turning operation
in mm (
(c)The time required to complete one single
turning operation in minutes
(d) Spindle speed in rpm
Chapter 23 Solutions
Degarmo's Materials And Processes In Manufacturing
Ch. 23 - How is the tool-work relationship in turning...Ch. 23 - What different kinds of surfaces can be produced...Ch. 23 - How does form turning differ from ordinary...Ch. 23 - What is the basic difference between facing and a...Ch. 23 - Which operations shown in Figure 23.3 do not form...Ch. 23 - Why is it difficult to make heavy cuts if a form...Ch. 23 - Show how equation 23.6 is an approximate equation.Ch. 23 - Why is the spindle of the lathe hollow?Ch. 23 - What function does a lathe carriage have?Ch. 23 - Why is feed specified for a boring operation...
Ch. 23 - Why are depths of cut in boring usually smaller...Ch. 23 - How can work be held and supported in a lathe?Ch. 23 - How is a workpiece that is mounted between centers...Ch. 23 - What will happen to the workpiece when turned, if...Ch. 23 - Why is it not advisable to hold hot-rolled steel...Ch. 23 - How does a steady rest differ from a follow rest?Ch. 23 - What are the advantages and disadvantages of a...Ch. 23 - Why should the distance the cutting tool overhangs...Ch. 23 - Prob. 19RQCh. 23 - How can a tapered part be turned on a lathe?Ch. 23 - Why might it be desirable to use a heavy depth of...Ch. 23 - If the rpm for a facing cut (assuming given work...Ch. 23 - Why is it usually necessary to take relatively...Ch. 23 - How does the corner radius of the tool influence...Ch. 23 - What effect does a BUE have on the diameter of the...Ch. 23 - How does the multiple-spindle screw machine differ...Ch. 23 - Why does boring ensure concentricity between the...Ch. 23 - Why are vertical spindle machines better suited...Ch. 23 - Prob. 29RQCh. 23 - Prob. 30RQCh. 23 - In which figures in this chapter is a dead center...Ch. 23 - Prob. 32RQCh. 23 - In which figures in this chapter showing setups do...Ch. 23 - How many form tools are being utilized in the...Ch. 23 - Prob. 35RQCh. 23 - Select the speed, feed, and depth of cut for...Ch. 23 - Calculate the rpm NS to run the spindle on a lathe...Ch. 23 - The lathe in problem 2 has rpm settings of 20, 30,...Ch. 23 - Calculate the cutting time if the length of cut is...Ch. 23 - Calculate the metal removal rate for machining at...Ch. 23 - Determine the speed, feed, and depth of cut when...Ch. 23 - At a speed of 90 fpm, feed of 0.030 ipr, and depth...Ch. 23 - Calculate the cutting time for a 4-in. length of...Ch. 23 - For a boring operation at V=90,fr=0.030, and...Ch. 23 - A cutting speed of 100 sfpm has been selected for...Ch. 23 - The following data apply for machining a part on a...Ch. 23 - A finish cut for a length of 10 in. on a diameter...Ch. 23 - A workpiece 10 in. in diameter is to be faced down...Ch. 23 - A hole 89 mm in diameter is to be drilled and...
Additional Engineering Textbook Solutions
Find more solutions based on key concepts
Link CB is horizontal at this instant.
Engineering Mechanics: Dynamics (14th Edition)
A loading causes the wires to elongate into the dashed shape. Explain how to determine the normal strain AB in ...
Mechanics of Materials (10th Edition)
The temperature of water at outlet.
Introduction to Heat Transfer
Comprehension Check 8-10
If the pressure is 250 feet of water [ft H2O], what is the pressure in units of inches...
Thinking Like an Engineer: An Active Learning Approach (3rd Edition)
The gears are subjected to the couple moments shown. Determine the magnitude and coordinate direction angles of...
INTERNATIONAL EDITION---Engineering Mechanics: Statics, 14th edition (SI unit)
1.1 What is the difference between an atom and a molecule? A molecule and a crystal?
Manufacturing Engineering & Technology
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.Similar questions
- A mild steel specimen of Initial diameter of 32.5 mm is turned to final diameter of 25 mm for an initial length of 154 mm on a lathe machine. Using the given data find the following. (i) Feed of 0.3 mm/rev & Depth of cut is 0.5 mm (ii)During machining the tool's approach length is 6 mm, over run length is 3mm (iii) Time required to complete one single turning operation is 2.3 minutes (a)Find number of passes to finish the entire turning operation (b) Total time required to complete the turning operation in minutes (c) Spindle speed in in rpm (d) Cutting speed in m/minutesarrow_forwardTaper turning is performed on a mild steel specimen, using the given data determine the following. of () Large diameter of the taper is 31.5 mm (ii) Spindle speed is 190 rpm, feed is 0.2 mm/rev & Depth of cut is 0.5 mm tion (ii) 1.5 minutes and 17.7 minutes are respective time required to complete one single taper turning operation and total time required to complete the taper turning operation Find (a) Cutting speed in m/minutes - (* (b) Taper Length in mm - (1 (c) Taper angle in degreearrow_forwardThe end of a large tubular workpart is to be faced on a NC vertical boring mill. The part has an outside diameter of 38.0 in and an inside diameter of 24.0 in. If the facing operation is performed at a rotational speed of 40.0 rev/min, feed of 0.015 in/rev, and depth of cut of 0.180 in, determine (a) the cutting time to complete the facing operation and the cutting speeds and metal removal rates at the beginning and end of the cut.arrow_forward
- A mild steel specimen of Initial diameter of 30.5 mm is turned to final diameter of 27 mm for an initial length of 153 mm on a lathe machine. Using the given data find the following. (i) Feed of 0.4 mm/rev & Depth of cut is 0.5 mm (ii)During machining the tool's approach length is 5 mm, over run length is 2mm (iii) Time required to complete one single turning operation is 3.5 minutes (a)Find number of passes to finish the entire turning operation (b) Total time required to complete the turning operation in minutesarrow_forwardA mild steel specimen of Initial diameter of 30.5 mm is turned to final diameter of 27 mm for an initial length of 153 mm on a lathe machine. Using the given data find the following. (i) Feed of 0.4 mm/rev & Depth of cut is 0.5 mm (ii)During machining the tool's approach length is 5 mm, over run length is 2mm (iii) Time required to complete one single turning operation is 3.5 minutes (c) Spindle speed in in rpm (= (d) Cutting speed in m/minutes(=arrow_forwardThe surface finish specification in a turning job is 0.90 um. The work material is cast iron. The cutting conditions have been selected as follows: v =90 m/min, f -0.23 mm/rev, and d = 2.2 mm. The nose radius of the cutting tool must be selected. Determine the minimum nose radius that will obtain the specified finish in this operation. oichie 0 90. m The wok matedal i material isarrow_forward
- A Ø2.0" piece of alloy steel needs to be turned in a lathe using a carbide cutting tool. The surface speed is 425 ft/min and the chip load is .008 in/rev. What is the recommended feed for the turning operation above? O .008 in/rev O .008 in/min O 6.8 in/rev O 425 in/min O 6.8 in/minarrow_forwardQUESTION 5 Determine the spindle speed (rpm), the feed rate (in/min) and the cutting power required for turning a 1º diameter copper rod with a depth of cut of 0.1" using a cemented carbide tool. O N=287 RPM, F-25.8 in/min, P=9.7 hp ON=2866 RPM, F=258 in/min, P=97 hp ON=1146 RPM, F-25.8 in/min, P=97 hp O N= 11460 RPM, F-340 in/min, P=130 hp ON= 1146 RPM, F-34 inimin, P= 13 hp ON= 115 RPM, F-3.4 in/min, P=1.3 hp QUESTION 6 It is required to face mill an aluminum block to size it down from 2" to 1.5" thick using a 3" diameter 2-toothed carbide cutting tool. The block is 6.0" wide and 6" long. The entire tool diameter engages the workpiece during the cut. Calculate the recommended spindle speed in revolutions per minute, feed per tooth, and cutting power required. O N=1529 RPM, f= 0.026 in/rev/tooth, P = 36 hp O N-3820 RPM, f= 26 in/revitooth, P=27 hp O N-3820 RPM, f= 0.052 in/rew/tooth, P=27 hp ON-382 RPM, F= 0.026 in/revitooth, P = 0.027 hp O N-3820 RPM, f= 0.052 in/rev/tooth, P=2.7 hp…arrow_forwardA twin-spindle drill simultaneously drills one ½-in hole and one ¾" through a 1" wide work piece. Both holes are twist drill with 118° point angles. cutting speed for material is 230 ft/min. The rotation speed of each spindle can be configured individually. The feed rate of both holes must be set to the same value, since both spindles go down at the same speed. The forward speed is set in such a way that the speed total metal removal does not exceed 1.50 in3 /min. Determine: a) the velocity maximum feedrate (in/min) that can be used, b) the individual feedrates (in/rev) that result in each hole and c) the time required to drill the holes.arrow_forward
- Name the various ways in which a work-part can be held in a lathe.arrow_forwardWhy should the overhang distance of a lathe tool be minimized? What occurs if a lathe tool is set below the center line of the work piece in turning?arrow_forwardPlease answer all parts within 30 mins to get a thumbs up! Please show neat and clean work . I will upvote for sure .arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Precision Machining Technology (MindTap Course Li...Mechanical EngineeringISBN:9781285444543Author:Peter J. Hoffman, Eric S. Hopewell, Brian JanesPublisher:Cengage Learning
Precision Machining Technology (MindTap Course Li...
Mechanical Engineering
ISBN:9781285444543
Author:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:Cengage Learning
The Most Common Metal Machining Processes (Metal Machining Video 1); Author: Sofeast Ltd;https://www.youtube.com/watch?v=uxVJ3qtezGw;License: Standard YouTube License, CC-BY
Machining process and Machine Tools; Author: Amar Gandhi;https://www.youtube.com/watch?v=X2mUJ8baaE0;License: Standard Youtube License