Advent Software uses standards to manage the cost of the programming staff. There are two programmer levels, Level 1 and Level 2. Level 1 programmers normally work on the easier projects. Level 1 and Level 2 programmers are paid $25 and $35 per hour, respectively. It has been determined from experience that Level 2 programmers can complete 50 lines of code per hour. If a Level 1 programmer is assigned to a Level 2 task, the programming work will be slower than the Level 2 time standard, but will be accomplished at a lower labor rate.
During a recent week, a Level 2 project was assigned to a Level 1 programmer. The programmer worked 40 hours and completed 1,400 lines of code.
- a. Determine the direct labor time variance for this worker.
- b. Determine the direct labor rate variance for this worker.
- c. Using the information in (a) and (b), is it more cost effective to use a Level 1 worker or a Level 2 worker on a Level 2 project?
Trending nowThis is a popular solution!
Chapter 23 Solutions
Financial And Managerial Accounting
- Salley is developing material and labor standards for her company. She finds that it costs $0.55 per pound of material per widget. Each widget requires 6 pounds of material per widget. Salley is also working with the operations manager to determine what the standard labor cost is for a widget. Upon observation, Salley notes that it takes 3 hours in the assembly department and 1 hour in the finishing department to complete one widget. All employees are paid $10.50 per hour. A. What is the standard materials cost per unit for a widget? 8. What is the standard labor cost per unit for a widget?arrow_forwardBrees, Inc., a manufacturer of golf carts, has just received an offer from a supplier to provide 2,600 units of a component used in its main product. The component is a track assembly that is currently produced internally. The supplier has offered to sell the track assembly for 66 per unit. Brees is currently using a traditional, unit-based costing system that assigns overhead to jobs on the basis of direct labor hours. The estimated traditional full cost of producing the track assembly is as follows: Prior to making a decision, the companys CEO commissioned a special study to see whether there would be any decrease in the fixed overhead costs. The results of the study revealed the following: 3 setups1,160 each (The setups would be avoided, and total spending could be reduced by 1,160 per setup.) One half-time inspector is needed. The company already uses part-time inspectors hired through a temporary employment agency. The yearly cost of the part-time inspectors for the track assembly operation is 12,300 and could be totally avoided if the part were purchased. Engineering work: 470 hours, 45/hour. (Although the work decreases by 470 hours, the engineer assigned to the track assembly line also spends time on other products, and there would be no reduction in his salary.) 75 fewer material moves at 30 per move. Required: 1. Ignore the special study, and determine whether the track assembly should be produced internally or purchased from the supplier. 2. Now, using the special study data, repeat the analysis. 3. Discuss the qualitative factors that would affect the decision, including strategic implications. 4. After reviewing the special study, the controller made the following remark: This study ignores the additional activity demands that purchasing would cause. For example, although the demand for inspecting the part on the production floor decreases, we may need to inspect the incoming parts in the receiving area. Will we actually save any inspection costs? Is the controller right?arrow_forwardJean Sharpe decides to gather additional data to identify the cause of overhead costs and figure out which products are most profitable. She notices that $30,000 of the overhead originated from the equipment used. She decides to incorporate machine-hours into the overhead allocation base to determine the effect on product profitability. Almond Dream requires 2 machine-hours per case, Krispy Krackle requires 7 hours per case, and Creamy Crunch requires 6 hours per case. Additionally, Jean notices that the $15,000 per month spent to rent 10,000 square feet of factory space accounts for almost 22 percent of the overhead. The assignment of square feet is 1,000 to Almond Dream, 4,000 to Krispy Krackle, and 5,000 to Creamy Crunch. Jean decides to incorporate this into the allocation base for the rental costs. Because labor-hours are still an important cost driver for overhead, Jean decides that she should use labor-hours to allocate the remaining $24,500. CBI still plans to produce 1,000…arrow_forward
- Jean Sharpe decides to gather additional data to identify the cause of overhead costs and figure out which products are most profitable. She notices that $30,000 of the overhead originated from the equipment used. She decides to incorporate machine-hours into the overhead allocation base to determine the effect on product profitability. Almond Dream requires 2 machine-hours per case, Krispy Krackle requires 7 hours per case, and Creamy Crunch requires 6 hours per case. Additionally, Jean notices that the $15,000 per month spent to rent 10,000 square feet of factory space accounts for almost 22 percent of the overhead. The assignment of square feet is 1,000 to Almond Dream, 4,000 to Krispy Krackle, and 5,000 to Creamy Crunch. Jean decides to incorporate this into the allocation base for the rental costs. Because labor-hours are still an important cost driver for overhead, Jean decides that she should use labor-hours to allocate the remaining $24,500. CBI still plans to produce 1,000…arrow_forwardJean Sharpe decides to gather additional data to identify the cause of overhead costs and figure out which products are most profitable. She notices that $30,000 of the overhead originated from the equipment used. She decides to incorporate machine-hours into the overhead allocation base to determine the effect on product profitability. Almond Dream requires 2 machine-hours per case, Krispy Krackle requires 7 hours per case, and Creamy Crunch requires 6 hours per case. Additionally, Jean notices that the $15,000 per month spent to rent 10,000 square feet of factory space accounts for almost 22 percent of the overhead. The assignment of square feet is 1,000 to Almond Dream, 4,000 to Krispy Krackle, and 5,000 to Creamy Crunch. Jean decides to incorporate this into the allocation base for the rental costs. Because labor-hours are still an important cost driver for overhead, Jean decides that she should use labor-hours to allocate the remaining $24,500. CBI still plans to produce 1,000…arrow_forwardPerez Industries produces two electronic decoders, P and Q. Decoder P is more sophisticated and requires more programming and testing than does Decoder Q. Because of these product differences, the company wants to use activity-based costing to allocate overhead costs. It has identified four activity pools. Relevant information follows: b. Determine the overhead cost allocated to each product.arrow_forward
- Fogerty Company makes two products-titanium Hubs and Sprockets. Data regarding the two products follow: Direct Labor-Hours per Unit Hubs Sprockets Additional information about the company follows: a. Hubs require $36 in direct materials per unit, and Sprockets require $10. b. The direct labor wage rate is $13 per hour. c. Hubs require special equipment and are more complex to manufacture than Sprockets. d. The ABC system has the following activity cost pools: 0.80 0.40 Annual Production 20,000 units 50,000 units Activity Cost Pool (Activity Measure) Machine setups (number of setups) Special processing (machine-hours) General factory (organization-sustaining) Required 1 Required 2 Required: 1. Compute the activity rate for each activity cost pool. 2. Determine the unit product cost of each product according to the ABC system. Complete this question by entering your answers in the tabs below. Compute the activity rate for each activity cost pool. Activity Cost Pool Machine setups Special…arrow_forwardHaywood Printing is processing a job with the following activity rates: Activity Cost Driver Driver Rate Direct labor Number of hours $8 Copying Number of copies $0.05 If this job requires 5 hours for 1,000 copies, what is the activity-based cost of the job?arrow_forwardThe Robotics Manufacturing Company operates an equipment repair business where emergency jobs arrive randomly at the rate of three jobs per 8-hour day. The company's repair facility is a single-server system operated by a repair technician. The service time varies, with a mean repair time of 2 hours and a standard deviation of 1.5 hours. The company's cost of the repair operation is $28 per hour. In the economic analysis of the waiting line system, Robotics uses $35 per hour cost for customers waiting during the repair process. a. What are the arrival rate and service rate in jobs per hour? b. The company is considering purchasing a computer-based equipment repair system that would enable a constant repair time of 2 hours. For practical purposes, the standard deviation is 0. Because of the computer-based system, the company's cost of the new operation would be $32 per hour. The firm's director of operations rejected the request for the new system because the hourly cost $4 higher and…arrow_forward
- Goulburn, Incorporated produces parts for heavy equipment used in mining and construction. The plant that produces one part common to many vehicles is highly automated, so all labor is considered part of factory overhead. The plant manager, who has just been promoted, would like to understand how overhead costs fluctuate in order to improve planning and budgets. After discussions with both financial and operations members of the plant staff, there is general agreement that the best cost driver for overhead is machine-hours. Monthly data were collected from the most recent two years on machine-hours and overhead. More months of data were available, but a process change had taken place about 30 months earlier, so the staff believed any data from before that time would be misleading. The data are shown in the following table: Month Machine-Hours Factory Overhead 1 39,300 $ 527,100 2 37,300 416,500 3 30,100 365,800 4 42,400 498,200 5 50,600 590,700 6 45,500 503,400 7…arrow_forwardGoulburn, Incorporated produces parts for heavy equipment used in mining and construction. The plant that produces one part common to many vehicles is highly automated, so all labor is considered part of factory overhead. The plant manager, who has just been promoted, would like to understand how overhead costs fluctuate in order to improve planning and budgets. After discussions with both financial and operations members of the plant staff, there is general agreement that the best cost driver for overhead is machine-hours. Monthly data were collected from the most recent two years on machine-hours and overhead. More months of data were available, but a process change had taken place about 30 months earlier, so the staff believed any data from before that time would be misleading. The data are shown in the following table: Month 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Machine-Hours 40,300 38,300 31,100 43,400 51,600 46,500 43,400 63,100 37,300 54,700 53,700 37,300 60,900 59,900…arrow_forwardHelparrow_forward
- Managerial AccountingAccountingISBN:9781337912020Author:Carl Warren, Ph.d. Cma William B. TaylerPublisher:South-Western College PubFinancial And Managerial AccountingAccountingISBN:9781337902663Author:WARREN, Carl S.Publisher:Cengage Learning,Principles of Accounting Volume 2AccountingISBN:9781947172609Author:OpenStaxPublisher:OpenStax College