Bellingham Company produced 3,700 units of product that required 3 standard direct labor hours per unit. The standard fixed overhead cost per unit is $2.25 per direct labor hour at 12,000 hours, which is 100% of normal capacity. Determine the fixed factory overhead volume variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Variance Analysis
In layman's terms, variance analysis is an analysis of a difference between planned and actual behavior. Variance analysis is mainly used by the companies to maintain a control over a business. After analyzing differences, companies find the reasons for the variance so that the necessary steps should be taken to correct that variance.
Standard Costing
The standard cost system is the expected cost per unit product manufactured and it helps in estimating the deviations and controlling them as well as fixing the selling price of the product. For example, it helps to plan the cost for the coming year on the various expenses.
Factory
Bellingham Company produced 3,700 units of product that required 3 standard direct labor hours per unit. The standard fixed overhead cost per unit is $2.25 per direct labor hour at 12,000 hours, which is 100% of normal capacity. Determine the fixed factory overhead volume variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
$
Trending now
This is a popular solution!
Step by step
Solved in 2 steps