3.- Factory Overhead Controllable Variance Bellingham Company produced 3,100 units of product that required 3.5 standard direct labor hours per unit. The standard variable overhead cost per unit is $6.60 per direct labor hour. The actual variable factory overhead was $70,180. Determine the variable factory overhead controllable variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. $ Fill in the blank (Favorable/ unfavorable)
Variance Analysis
In layman's terms, variance analysis is an analysis of a difference between planned and actual behavior. Variance analysis is mainly used by the companies to maintain a control over a business. After analyzing differences, companies find the reasons for the variance so that the necessary steps should be taken to correct that variance.
Standard Costing
The standard cost system is the expected cost per unit product manufactured and it helps in estimating the deviations and controlling them as well as fixing the selling price of the product. For example, it helps to plan the cost for the coming year on the various expenses.
3.- Factory
Bellingham Company produced 3,100 units of product that required 3.5 standard direct labor hours per unit. The standard variable overhead cost per unit is $6.60 per direct labor hour. The actual variable factory overhead was $70,180. Determine the variable factory overhead controllable variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
$ Fill in the blank (Favorable/ unfavorable)
Trending now
This is a popular solution!
Step by step
Solved in 3 steps