Question
Chapter 18, Problem 10P
a.
Summary Introduction
To determine: The probability that a machine will have to wait for an adjustment.
b.
Summary Introduction
To determine: The average number of machines waiting for adjustment.
c.
Summary Introduction
To determine: Average number of machines being serviced (H).
d.
Summary Introduction
To determine: Expected hourly output of each machine, taking adjustments into account.
e.
Summary Introduction
To determine: Optimum number of operators.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
2. A repair and inspection facility consists of two stations: a repair station with two technicians, and
an inspector station with 1 inspector. Each repair technician works at the rate of 3 items per hour; the
inspector can inspect 8 items per hour. Approximately 10% of all items fail inspection and are sent back
to the repair station. (This percentage holds even for items that have been repaired two or more times.) If
items arrive at the rate of 5 per hour, what is the long-run expected delay that items experience at each of
the two stations, assuming a Poisson arrival process and exponentially distributed service times? What is
the maximum arrival rate that the system can handle without adding personnel?
A queuing model which follows the M/M/1 assumptions has λ = 2 and μ = 3. The average waiting time in the system is
At a book store, one customer arrives every 4 minutes. The bookstore has one cashier, and it takes 3 minutes to serve one customer with a standard deviation of 4.9. The arrival process has a standard deviation of 7.
What is the average number of customers in the queue
Chapter 18 Solutions
Operations Management
Ch. 18 - Prob. 1DRQCh. 18 - Why do waiting lines form even though a service...Ch. 18 - Prob. 3DRQCh. 18 - Prob. 4DRQCh. 18 - What approaches do supermarkets use to offset...Ch. 18 - Prob. 6DRQCh. 18 - Prob. 7DRQCh. 18 - Prob. 8DRQCh. 18 - Prob. 9DRQCh. 18 - Prob. 1TS
Ch. 18 - Prob. 2TSCh. 18 - Prob. 3TSCh. 18 - Prob. 1CTECh. 18 - Prob. 2CTECh. 18 - Prob. 3CTECh. 18 - The owner of Eat Now Restaurant implemented an...Ch. 18 - Prob. 5CTECh. 18 - Prob. 1PCh. 18 - Prob. 2PCh. 18 - Prob. 3PCh. 18 - Prob. 4PCh. 18 - Prob. 5PCh. 18 - Prob. 6PCh. 18 - Prob. 7PCh. 18 - Prob. 8PCh. 18 - Prob. 9PCh. 18 - Prob. 10PCh. 18 - Prob. 11PCh. 18 - Prob. 12PCh. 18 - Prob. 13PCh. 18 - Prob. 14PCh. 18 - Prob. 15PCh. 18 - A priority waiting system assigns arriving...Ch. 18 - Prob. 17PCh. 18 - Prob. 18PCh. 18 - Prob. 1CQ
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A queuing model that follows the M/M/1 assumptions has λ = 2 and μ = 8. The average number in the system Ls is ________ and the utilization of the system is ________.arrow_forwardDo: 12-21 Truck drivers working for Juhn and Sons (see Problems 12-19 and 12-20) are paid a salary of $20 per hour on average. Fruit loaders receive about $12 per hour. Truck drivers waiting in the queue or at the loading gate are drawing a salary but are productively idle and unable to generate revenue during that time. What would be the hourly cost savings to the firm associated with employing two loaders instead of one? Not this: 12-19 Juhn and Sons Wholesale Fruit Distributors employs one worker whose job is to load fruit on outgoing company trucks. Trucks arrive at the loading gate at an average of 24 per day, or 3 per hour, according to a Poisson distribution. The worker loads them at a rate of 4 per hour, following approximately the exponential distribution in service times. Not this: 2-20 Juhn believes that adding a second fruit loader will substantially improve the firm’s efficiency. He estimates that a two-person crew, still acting like a single-server system, at the loading…arrow_forwardA supermarket has more than one server servicing at counters. The customer arrives in a Poisson fashion at the rate of 10 per hour. The service time for each customer is expected with a mean of 4 minutes. Find the probability of a customer has to wait for the service, average queue length, the average time spent by a customer in the queue.arrow_forward
- At a book store, one customer arrives every 6 minutes. The book store has one cashier, and it takes 4 minutes to serve one customer with a standard deviation of 5.9. The arrival process has a standard deviation of 8. (Do not round intermediate calculations. Round your answer to three decimal places.) What is the average number of customers in the queue? customersarrow_forwardA Northwest Airlines ticket counter forecasts that 30 people per hour will need to check in. It takes an average of 1.5 minutes to service a customer. Assume that interarrival times and service times are exponential and that all customers wait in a single line for the first avaliable agent.If we want the average time a customer spends in line and in service to be 3 minutes or less, how many ticket agents should be on duty?arrow_forwardA Printed Circuit Board (PCB) machine installs integrated circuits onto a board. Before starting to produce a board, the PCB machine requires a 16-minute setup. Once in production, the PCB machine requires only 0.19 minute per board. a. Currently, the PCB machine produces 525 boards between setups. Given this operating process, what is the capacity of the PCB machine (in boards per min)? b. Currently, the PCB machine produces 525 boards between setups. Given this operating process, what is the utilization of the PCB machine? c. Say the PCB machine produces 400 boards s between setups and demand is 2 boards per minute. Given the operating process, what is the avergae inventory of boards anf the PCB machine? d. Demand for boards occurs at the rate of 2 boards per minute. What is the smallest batch size such that the PCB machine does not constrain the flow rate through the process?arrow_forward
- The time from when a patient is discharged from North Shore Hospital to the time the discharged patient’s bed is ready to be assigned to a new patient is referred to as the bed assignment turnaround time. If the bed turnaround time is excessive, it can cause problems with patient flow and delay medical procedures throughout the hospital. This can cause long waiting times for physicians and patients thus creating customer dissatisfaction. The admissions RN has assigned a patient care associate to measure the bed turnaround time for a randomly selected bed each morning., afternoon, and evening for 30 days. Following are the bed turnaround time sample observations: Day Day Bed Turnaround Times (min) 1 1 127 135 167 144 151 2 2 140 155 122 135 119 3 3 112 128 97 118 131 4 4 223 135 154 187 150 5 5 181 155 160 172 166 6 6 103 158 145 124 149 7 7 146 135 167 150 178 8 8 104 122 115 137 129 9 9 136 158 137 148 156 10 10 145 163 106 139 170 11 11 84 146 125 98…arrow_forwardIn waiting line management, system performance measures include which of the following: I. an arriving customer will have to wait. II. The average number of customers waiting. III. The average time customers spend in the system. IV The probability that the server is busy. Select one: a. II, III & IV b. I, II & III c. I, II & IV d. I, III & IV convert inputs into outputs; they are at the core of operations management. Select one: a. processes b. decisions C. resources d. products ооооarrow_forwardAn airline is planning to open a satellite ticket desk in a new shopping plaza, staffed by one ticket agent. It is estimated that requests for tickets and information will average 15 per hour, and request will have a Poisson distribution. Service time is assumed to be exponentially distributed. Previous experience with similar satellite operations suggests that mean service time should average about three minutes per request. Determine each of the following: Percentage number of time the server (agent) will be idle.The expected number of customers waiting to be served.The average time customers will spend in the system.The probability of zero customers in the system and the probability of four customers in the system.arrow_forward
- Customer interarrival times at a store are exponentially distributed with rate 8 customers per hour. Customers are served by a single customer service representative (CSR), at a rate of 10 customers per hour. Service times are also exponentially distributed. Which of the following statements are true? O The probability of having exactly three customers in the store is 0.128. O None of the answers are correct. The store has customers waiting for a CSR 80.0% of the time. The average number of customers in the store is 3.2. O The average wait time for the CSR is 24 minutes.arrow_forwardSuppose a coffee shop order and fulfillment process is configured simply as a single queue with two steps: wait and service. Customers enter, wait their turn, and then are served, by placing and receiving their order all at once. Suppose that an average of 10 customers per hour enter the coffee shop while the shop is open. On average, there are two customers waiting in line to place their orders. It takes an average of 2 minutes to go through the service step, that is, it takes 2 minutes to complete the second step of placing and receiving the order. In steady state, O The average wait time before placing an order is 12 minutes. O The average time between customer arrivals is 5 minutes. O None of the answers are correct. There is an average of one customer being served at a time. O The average total time to wait and be served is 15 minutes.arrow_forwardOne operator loads and unloads a group of five machines. Service time is exponentiallydistributed with a mean of 10 minutes per cycle. Machines run for an average of 70 minutesbetween loading and unloading, and this time is also exponential. Find the following:a. The average number of machines waiting for the operatorb. The expected number of machines runningc. Average downtimed. The probability that a machine will not have to wait for servicearrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,