Concept explainers
a)
To determine: The daily demand of the product.
Introduction: Inventory management is the process of ordering, storing and using inventory of the company such raw material, components and finished goods. It governs the flow of goods from manufacturers to warehouse and to the point of sale. The key function is to maintain record of flow of new or returned products which enters or leaves the company.
b)
To determine: The number of day production must be carried out.
c)
To determine: The number production runs per year and annual setup cost.
d)
To determine: The maximum and average inventory levels.
e)
To determine: The total annual setup cost and holding cost.
f)
To determine: The number of refrigerators to be produced in each production line to minimize the total annual inventory cost and the net saving in inventory.
Want to see the full answer?
Check out a sample textbook solutionChapter 12 Solutions
EBK PRINCIPLES OF OPERATIONS MANAGEMENT
- For two new output products, the manager must set up inventory purchasing systems, P34 and P35. P34 can be ordered at any moment, but only once every four weeks can P35 be ordered. The corporation runs 50 weeks a year and the weekly utilisation rates are usually allocated on both pieces. The manager has collected the following documents. Point P34 Point P35 Average weekly request 60 units Seventy units Deviation from norm Four units a week Five units a week $15 $20 per unit. The expense of annual keeping is 30% 30% of the Price $70 to order $30 30 2 weeks lead period 2 weeks Acceptable stockout chance 2.5% 2.5% A. When can each object be reordered by the manager?arrow_forwardThe daily demand for printer paper at the School of Business is approximately normal with a mean of 15.2 boxes and a standard deviation of 1.6 per day. The Administrative Assistant reviews the inventory every 30 days, and the lead time is 5 days. The division set a policy of satisfying 96% of the demand for paper. If there are 125 boxes of printer paper in inventory at the beginning of this review period, how many boxes of printer paper should be ordered? What is the variance of demand during the review period plus the lead-time period? What is the standard deviation of demand during the review period plus the lead-time period? A. Variance = 76.80 Standard deviation = 8.76 B. Variance = 89.60 Standard deviation = 9.47 C. Variance = 9.47 Standard deviation = 89.60 D. Variance = 12.8 Standard deviation = 3.58arrow_forwardThe Northridge Company tends to keep the inventory low. At the same time, it is important to respond to demand quickly, since a customer who wants a product K is very likely to get one from a competitor if Northridge Company doesn’t have one available immediately. Northridge Company’s current policy to produce the product K is to produce 100 per week, which is the average demand. Even this is a problem, as the production manager has pointed out, since the equipment is also used for other products and the lot size of 300 would be much more efficient. He said he is currently set up the production for product K for the next week and states that he has capacity available to produce 300 at a time next week. The following lists the forecasts and actual customer orders for the next 12 weeks. Week 1 2 3 4 5 6 7 8 9 10 11 12 Forecast 90 120 110 80 85 95 100 110 90 90 100 110 Customer Orders 105 97 93 72 98 72 53 21…arrow_forward
- nelp Jan Kottas is the owner of a small company that produces electric knives used to cut fabric. The annual demand is for 8,000 knives, and Jan produces the knives in batches. On average, Jan can produce 150 knives per day; during the production process, demand has been about 40 knives per day. The cost to set up the production process is $100, and it costs Jan $0.80 to carry a knife for 1 year. How many knives should Jan produce in each batch? Jan should produce knives in each batch (round your response to the nearest whole number).arrow_forwardBateman Company produces helmets for drivers of motorcycles. Helmets are produced in batches according to model and size. Although the setup and production time vary for each model, the smallest lead time is six days. The most popular model, Model HA2, takes two days for setup, and the production rate is 1,125 units per day. The expected annual demand for the model is 54,000 units. Demand for the model, however, can reach 67,500 units. The cost of carrying one HA2 helmet is $3 per unit. The setup cost is $9,000. Bateman chooses its batch size based on the economic order quantity criterion. Expected annual demand is used to compute the EOQ. Recently, Bateman has encountered some stiff competition—especially from foreign sources. Some of the foreign competitors have been able to produce and deliver the helmets to retailers in half the time it takes Bateman to produce. For example, a large retailer recently requested a delivery of 18,000 Model HA2 helmets with the stipulation that the…arrow_forwardGlams Touch is a budding cosmetics family business in Sekondi. The owners, Baaba Benson and Bernard Benson, must ensure that they judiciously use the store space available. They have never kept detailed inventory or sales records. They immediately place new items on the shelves as soon as shipment of goods arrives.Invoices from suppliers are only kept for tax purposes. During sales, they record the items numbers and the total amount received at the cash register. The owners use their own judgment in identifying items that need to be reordered. Baaba and Bernard rely on their own judgment in deciding the cosmetics that need to be restocked.Analyse the business implication of this situation. In your view, how could information systems be utilized to assist the Bensons manage Glams Touch. Enumerate some data that should be captured by the systems and what information outputs are to be churned out from the system.arrow_forward
- A company wants to produce hardware at a level rate and send 10 units to inventory. If their 6-month forecast reveals a total of 110 units demanded, what should be their monthly production rate?arrow_forward27) Ali has a restaurant where the customers use a different number of disposable cups each day he is open. Every 30 days, Ali places an order to replenish his cup inventory. It takes 3 days for the order to arrive, at which point it brings the inventory level up to 4000 cups. It costs Ali $30 to have the order processed. Select all statements that apply to Ali's situation: Group of answer choices a) Ali uses a Continuous Inventory System b) d is constant c) Ali uses a Periodic Inventory System d) Ali uses a Fixed-Order-Quantity Inventory System e) Maximum Inventory Level is constantarrow_forwardSitka Industries uses a cost system that carries direct materials inventory at a standard cost. The controller has established these standards for one ladder (unit): StandardQuantity x StandardPrice = StandardCost Direct materials 3 pounds $4.50 per pound $13.50 Direct labor 2.00 hours 12.00 per hour 24.00 Total cost $37.50 Sitka Industries made 2,900 ladders in July and used 8,500 pounds of material to make these units. Sitka Industries bought 15,400 pounds of material in the current period. There was a $300 unfavorable direct materials price variance. Enter all amounts as positive numbers. A. How much in total did Sitka pay for the 15,400 pounds? B. What is the direct materials quantity variance? C. What is the total direct materials cost variance? D. What if 9,200 pounds were used to make these ladders, what would be the direct materials quantity variance? E. If there was a $340 favorable direct materials price variance, how much did Sitka pay…arrow_forward
- Lieutenant Commander Data is planning to make his monthly (every 30 days) trek to Gamma Hydra City to pick up a supply of isolinear chips. The trip will take Data about two days. Before he leaves, he calls in the order to the GHC Supply Store. He uses chips at an average rate of five per day (seven days per week) with a standard deviation of demand of one per day. He needs a 98 percent service probability. If he currently has 35 chips in inventory, how many should he order? What is the most he will ever have to order?arrow_forwardEmarpy Appliance is a company that produces all kinds of major appliances. Bud Banis, the presidentof Emarpy, is concerned about the production policy for thecompany’s best-selling refrigerator. The annual demand hasbeen about 8,000 units each year, and this demand has beenconstant throughout the year. The production capacity is 200units per day. Each time production starts, it costs the company $120 to move materials into place, reset the assemblyline, and clean the equipment. The holding cost of a refrigerator is $50 per year. The current production plan calls for 400refrigerators to be produced in each production run. Assumethere are 250 working days per year.a) What is the daily demand of this product?b) If the company were to continue to produce 400 units eachtime production starts, how many days would productioncontinue?c) Under the current policy, how many production runs peryear would be required? What would the annual setup costbe?d) If the current policy continues, how many…arrow_forwardMotorama TV estimates the annual demand for its TVsis (and will be in the future) normally distributed, with amean of 6,000 and standard deviation of 2,000. Motorama must determine how much production capacity it shouldhave. The cost of building enough production capacity tomake 1,000 sets per year is $1,000,000 (equivalent in presentvalue terms to a cost of $100,000 per year forever). Exclusiveof the cost of building capacity, each set sold contributes$250 to profits. How much production capacity shouldMotorama have?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.