Concept explainers
Consider the master flight
Interpretation: The similarities between the master flight schedule of an airlines to the master production schedule for a manufacturer.
Concept Introduction: Master flight schedule of any airlines shows the timings of each of the flight. Similarly the master production schedule of a manufacturing organization shows the time when the manufacture of each product starts. Both have some similarities.
Answer to Problem 2DQ
There are many similarities between the master flight schedule and the master production schedule of an airlines and a manufacturer respectively.
Explanation of Solution
Given information: Activities consisting lead times to aircraft’s readiness and related to the time of departure.
- The master flight schedule shows the time for the flight to a certain destination. This is similar to a master production schedule showing the taking up the production of a certain part/job.
- The flight schedule shows the time to the destination i.e. the length of this flight (run) and the time allowed. Similarly the master production schedule shows the no. of parts to be manufactured and the time to be taken (for this run).
- Before the flight, many tasks are to be completed viz. loading fuel, meals and other consumables; boarding passengers etc. Similarly before the manufacturing equipment starts the production run, there are tasks like setting the machine and loading the components etc.
- There can be delays/interruptions in these tasks for both-the flight and the production run.
- The flight will end after completing the run. Similarly the production run will stop after completing the scheduled quantity.
- The plane moves on for the next scheduled flight. The manufacturing equipment also moves on the run of the next scheduled product.
Want to see more full solutions like this?
Chapter 11 Solutions
Operations Management: Processes and Supply Chains, Student Value Edition Plus MyLab Operations Management with Pearson eText -- Access Card Package (12th Edition)
Additional Business Textbook Solutions
Operations Management: Sustainability and Supply Chain Management (12th Edition)
Principles Of Operations Management
Business in Action
Operations and Supply Chain Management 9th edition
Operations Management
Principles of Operations Management: Sustainability and Supply Chain Management (10th Edition)
- Describe a high-volume service operation and how scheduling should be donearrow_forwardWhat is the purpose of the Medium Term Scheduling tool?arrow_forwardPrepare a master schedule given this information: The forecast for each week of an eight-week schedule is 60 units. The MPS rule is to schedule production if the projected on-hand Inventory would be negative without it. Customer orders (committed) are as follows: Week 1 2 3 Customer Orders 54 38 25 20 Use a production lot size of 73 units and no beginning inventory. (In the ATP row, enter a value of 0 (zero) In any perlods where ATP should not be calculated. Leave no cells blank - be certain to enter "0" wherever required.) June July MPS ATP Forecast Customer Orders Projected On-Hand Inventory 60 54 2 60 38 3 60 25 4 60 20 5 60 0 6 60 0 7 60 0 8 60 0arrow_forward
- What are the two main approaches to scheduling calving in Australian dairy production systems, and where are they dominant in the Australian dairy industry? What is the link between these calving systems, the milk marketing systems where each calving system is dominant, and the feed base needed to support each system?arrow_forwardWhat is the purpose of the Gantt chart as a scheduling tool? When do you use a Gantt chart instead of a network-based method?arrow_forwardWhy do process schedules need exceptions?arrow_forward
- Culinary Creations caters weddings, office parties, and the like. Monica, the owner of Culinary Creations, offers delectable dishes and impeccable service. Her firm has gained a reputation for offering unique themed dinners and parties. Consequently, there is no shortage of demand. If a customer wants to customize a party beyond the regular “themes,” the customer must reserve a date several months in advance so that Monica can plan for all contingencies and deliver perfection. Culinary charges a premium price for its unique services. Required: a. Describe three internal processes that Culinary must execute well to deliver on its value proposition. Justify your choices. b. What might be the appropriate performance measures for these critical processes?arrow_forward2)The castings need to be started in week ? (enter your response as a whole number).arrow_forwardThe main input for master scheduling schedule is: O a. Long term forecasting O b. Aggregate production (capacity) plan (aggregate planning) O c. Material requirements planning (MRP) O d. None of the above Which of the following best describes the last step to developing a master production schedule? O a. Check preliminary MPS against available capacity O b. Check the MPS against the production plan to ensure they match O c. Resolve differences between the preliminary MPS and available capacity O d. Design a preliminary MPS MRP systems are: O a. Substitutes for fixed order point/order quantity systems. O b. Appropriate for all end items in the product line. O c. Intended to determine an appropriate master production schedule. Od. Intended to reduce inventory requirements, production lead times, and delivery times to customers. O e. Intended to be used for independent demand items.arrow_forward
- What are the travel decisions that are needed to reduce demand and essentially achieve demand management? Select all that apply a.Mode b. Departure Time c. Routearrow_forwardMGT 314 (Operation Management) MCQ:arrow_forwardExplain what is the purpose of the Gantt chart as a scheduling tools and discuss when do they use a Gantt chart instead of a network based method?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,