Concept explainers
(New Account class) An Account class was specified in
■ Add a new data field name of the String type to store the name of the customer.
■ Add a new constructor that constructs an account with the specified name, id, and balance.
■ Add a new data field named transactions whose type is ArrayList that stores the transaction for the accounts. Each transaction is an instance of the Transaction class, which is defined as shown in Figure 11.6.
FIGURE 11.6 The Transaction class describes a transaction for a bank account.
■ Modify the withdraw and deposit methods to add a transaction to the transactions array list.
■ All other properties and methods are the same as in Programming Exercise 0.7.
Write a test program that creates an Account with annual interest rate 1.5%, balance 1000, id 1122, and name George. Deposit $30, $40, and $50 to the account and withdraw $3, $4, and $2 from the account. Print an account summary that shows the account holder name, interest rate, balance, and all transactions.
Want to see the full answer?
Check out a sample textbook solutionChapter 11 Solutions
Introduction to Java Programming and Data Structures: Brief Version (11th Global Edition)
Additional Engineering Textbook Solutions
INTERNATIONAL EDITION---Engineering Mechanics: Statics, 14th edition (SI unit)
Java How to Program, Early Objects (11th Edition) (Deitel: How to Program)
Starting Out with Java: From Control Structures through Objects (7th Edition) (What's New in Computer Science)
Modern Database Management
Web Development and Design Foundations with HTML5 (8th Edition)
Starting Out with Programming Logic and Design (5th Edition) (What's New in Computer Science)
- Can you find the shortest path tree starting from vertex 3 to all other vertices for the graph below using BFSarrow_forwardCan you find shortest path from vertex 3 to all other vertices for the graph below.arrow_forwardcan you draw the shortest path tree using BFS for the following directed unweighted graph?arrow_forward
- What is the shortest path from vertex 3 to all other vertices:Which graph algorithm can solve the problem most efficiently(the quickest runtime)How could the same algorithm if the graph had edge weights? (create intermediate nodes)arrow_forwardThe difference between (1) a database management system (DBMS) and (2) a database, is: a. The first refers to a complete accounting system, the second refers to a subset of that b. The first is program software, the second is proprietary data and related files c. The first is hardware, the second is software d. Nothing—these terms are synonyms..arrow_forwarda) An example of the linear hash index is given below. Every time a new overflow page is added, the bucket pointed by Next is split, and Next is incremented by one. Show the index state after adding the keys 39, 25, and 29. hi ho Level=0, N=4 000 00 0*8* 001 01 17*33* 010 10 6*26* 42* 011 11 7* 11* 15* 23* 100 00 4* 12* 20* 101 01 5* 13* 21* 37* Nextarrow_forward
- What would be the runtime (big-O asymptotic notation) of Dijkstra’s algorithm if it is implemented based on an unsorted minimum priority queue in terms of vertices (v) and edges (e)? Please show all steps including the runtime of each step of the algorithm.arrow_forwarda) An extendable hashing index is given below. Present the state of the index after adding the keys 21, 25, and 29. Directory Buckets 0*8* 12* 20* 00 9* 13*33* 01 10 6*26* 42* 11 7* 11* 15*23* b) Explain the concepts of global depth and local depth of buckets. Which buckets in the index above (after inserting 21, 25 and 29) have a global depth equal to the local depth? c) Describe the bulk loading algorithm for B+ trees. What are the differences to using a simple B+ tree add operation?arrow_forwardb) Below is an example of a B+ tree. Add an element with key 19 and then delete an element with key 1. Present the final result. 1* 3* . 10 18 24 27 37 10*15* - 18 20 22 24*26* 24* 26* - 27* 30*32* 37*40*arrow_forward
- Books (bid, author, title, publisher, year, notes); Members (mid, name, surname, street, city, country, phone, notes); Borrow (rid, bid, mid, date, notes);arrow_forwardCustomer (cid, name, surname, city, address, phone) Account (aid, cid, amount, currency, created) Deposit (did, aid, cid, amount, date) Withdraw(wid, aid, cid, amount, date)arrow_forwardData environment The SPJ company manages the orders of the parts from the suppliers for the projects that run at other companies. A project is described with the project identifier, name, company where the project takes part, budget, start date, and the duration of the project. A part is presented with the part identifier, name, and price. A supplier is described by the supplier identifier, name, address, city and phone number. For each order of a product from a given supplier for a given project, we store the number of parts ordered, the price of the order, the date, and the comment. The information system SPJ includes the following tables. Parts pid, name, price ); Projects( jid, name, company, budget, start, duration ); Suppliers sid, name, address, city, phone ); Orders oid, pid, jid, sid, quantity, price, date, comment );arrow_forward
- C++ Programming: From Problem Analysis to Program...Computer ScienceISBN:9781337102087Author:D. S. MalikPublisher:Cengage Learning