Gerald Glynn manages the Michaels Distribution Center. After careful examination of his database information, he has determined the daily requirements for part-time loading dock personnel. The distribution center operates 7 days a week, and the daily part-time staffing requirements are
Find the minimum number of workers Glynn must hire. Prepare a workforce
Want to see the full answer?
Check out a sample textbook solutionChapter 10 Solutions
Operations Management: Processes and Supply Chains (12th Edition) (What's New in Operations Management)
Additional Business Textbook Solutions
Principles Of Operations Management
Business in Action (8th Edition)
Loose-leaf for Operations Management (The Mcgraw-hill Series in Operations and Decision Sciences)
Operations Management
Operations and Supply Chain Management 9th edition
Business in Action
- Laila is a traveling sales witch and has the following list of errands: ◆ Home: H Pet store -P Greenhouse - G Laundry shop/cleaner - C Drugstore- D Target Mall T In which order should she do these errands in order to minimize the time spent on her broom? Use any method Show complete solution. Use Figure 20 T 45 D 92 71 67 20 H 42 32 54 22 50 P Figure 20 36 58 G Carrow_forwardBill’s Bar & Grill is open seven nights a week. Business isbusiest on Th ursday, when there is a concert in the park across thestreet. Bill wants a workforce schedule that allows each employeetwo consecutive days off each week. He believes that he needs fouremployees every day except on Th ursday, when he believes heneeds six employees. Develop a workforce schedule for Billarrow_forwardGeoffrey owns a small shop that sells cups of frozen yogurt in the university. Geoffrey owns three frozen-yogurt machines. His other inputs are refrigerators, frozen-yogurt mix, cups, sprinkle toppings, and, of course, workers. He estimates that his daily production function when he varies the number of workers employed (and at the same time, of course, yogurt mix, cups, and so on) is as shown in the accompanying table. i What are the fixed inputs and variable inputs in the production of cups of frozen yogurt? ii. Draw the total product curve for Geoffrey’s yoghurt shop iii. Compute the marginal product for Geoffrey’s workersarrow_forward
- The Donald Fertilizer Company produces industrial chemi-cal fertilizers. The projected manufacturing requirements (inthousands of gallons) for the next four quarters are 90, 60,90, and 140, respectively. A level workforce is desired, relyingonly on anticipation inventory as a supply option. Stock-outs and backorders are to be avoided, as are overtime andundertime.a. Determine the quarterly production rate required to meettotal demand for the year, and minimize the anticipationinventory that would be left over at the end of the year.Beginning inventory is 0.b. Specify the anticipation inventory that will be produced.c. Suppose that the requirements for the next four quartersare revised to 60, 90, 140, and 90, respectively. If total de-mand is the same, what level of production rate is needednow, using the same strategy as part (a)?arrow_forwardA small-size cargo company in Dubai has been operating since the year 2000. The total workforce comprises ten employees, out of which five are in sales, three are in operations, one is handling legal and accounts matters, and one manager is also the owner of the company. Total annual turnover is enough to run the company smoothly. Recently another director has joined who brought large investment to the company. The Board of directors has decided to expand the business in other cities and establish offices overseas in potential locations. This expansion policy will directly be linked to the new manpower needs. Therefore, the board has decided to open an HR department with one HR manager and three staff to look after HR operations. The new HR manager has noticed that the company has a very convenient way of recording the data, where all transactions are recorded on excel documents. “this may not work in the new setup with many branches around the world”, he mentioned in the BOD meeting.…arrow_forwardJose Martinez of El Paso has developed a polished stainless steel tortilla machine that makes it a "showpiece" for display in Mexican restaurants. His forecast of capacity and demand follows: Demand Capacity Regular time Overtime 1 140 140 20 2 170 150 40 Month 3 130 150 20 Costs Regular-time cost per unit Overtime cost per unit Subcontract cost per unit Inventory holding cost per unit per month 4 230 Subcontracting: 90 units available over the 5-month period Beginning inventory: 0 units Ending inventory required: 10 units Assume that backorders are not permitted. Using the transportation method, the total cost of the optimal plan is $ (enter your response as a whole number). 150 20 $90 $115 $128 $4 5 240 160 20arrow_forward
- 4. The Spencer Optics Company produces an inexpensive line of sunglasses. The manufacturing process consists of assembling two plastic lenses (produced by the firm's plastic molding depart- ment) into a finished frame (purchased from an outside supplier). The company is interested in using material requirements planning to schedule its operations and has asked you to prepare an example to illustrate the technique. The firm's sales manager has prepared a 10-week sales forecast for one of the more popular sunglasses (the Classic model) for your example. The forecast is 100 units per week. Spencer has customer orders of 110 units, 80 units, 50 units, and 20 units in weeks 1, 2, 3, and 4, respectively. The sunglasses are assembled in batches of 300 units. Presently, three such batches are sched- uled: one in week 2, one in week 5, and one in week 8. Complete the following time-phased record: Week hand 1 2 3 4 5 6 7 8 9 10 Classic Model On MPS Record Forecast Orders Projected available…arrow_forwardProctoring Enabled: Chapter 12 Computer Simulati. O Help Save & Exit Submit Saved Given this frequency distribution, what demand values would be associated with the following random numbers? (Do not round intermediate calculations.) Demand Frequency 29 1 23 2. 19 3. 29 Random Number Simulated Demand 0.3 0.5 0.9 Mc Graw Hill < Prev 2 of 5 ASUSarrow_forwardWhat are the advantages to finite capacity scheduling?arrow_forward
- Bob Carlton's golf camp estimates the following workforce requirements for its services over the next two years: Quarter 1 2 3 4 5 6 7 8 Demand (hrs) 4,200 6,400 3,000 4,800 4,400 6,240 3,600 4,800 Each certified instructor puts in 480 hours per quarter regular time and can work an additional 120 hours overtime. Regular-time wages and benefits cost Carlton $7,200 per employee per quarter for regular time worked up to 480 hours, with an overtime cost of $20 per hour. Unused regular time for certified instructors is paid at $15 per hour. There is no cost for unused overtime capacity. The cost of hiring, training, and certifying a new employee is $10,000. Layoff costs are $4,000 per employee. Currently 8 employees work in this capacity. a. Find a workforce plan using the level strategy that allows for no delay in service. It should rely only on overtime and the minimum amount of undertime necessary. What is the total cost of the…arrow_forward2. ( A large business process outsourcing company operates 5 days a week (Monday to Friday). The manager estimates that the minimum number of agents required, combined on-site and work-from-home (WFH) setup, to provide prompt service are as follows: 20 for Monday, 18 for Tuesday, 23 for Wednesday, 28 for Thursday, and 32 for Friday. Labor rules state that each agent must work for 3 days a week on-site, and 2 days in WFH setup. For example, an agent who works on-site Monday to Wednesday must be on WFH-setup during Thursday and Friday. Also, the company wants that at least 60% of the workforce for each day are reporting on-site. Formulate the appropriate LP model for this problem to minimize the number of agents to be hired.arrow_forwardJingani Pottery Company is a small crafts operation run by a Native American tribal council. The company employs skilled artisans to produce clay bowls and mugs with authentic North American designs and colors. The two primary resources used by the company are special pottery clay and skilled labor. Given these limited resources, the company desires to know how many bowls and mugs to produce each day in order to maximize profit. The two products have the following resource requirements for production and profit per item produced.arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,