Chapter 10, Problem 10.45P
1.
To determine
To explain: the relationship between the cumulative average directs labor hour and cumulative output and verifies that
2.
To determine
regression line by using the given data and show the economical plausibility, goodness of F and slope of the regression line
3.
To determine
the estimate slope coefficient
4.
To determine
To explain: the confidence of her over the new cost estimation
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
What is the answers using solver on excel:
Valencia Products makes automobile radar detectors and assembles two models: LaserStop and SpeedBuster. Both models use the same electronic components. After reviewing the components required and the profit for each model, the
firm found the following linear optimization model for profit, where L is the number of LaserStop models produced and S is the number of SpeedBuster models produced. Implement the linear optimization model on a spreadsheet and use
Solver to find an optimal solution. Interpret the optimal solution, identify the binding constraints, and verify the values of the slack variables.
Maximize Profit 123 L+ 137 S
18 L+11 S≤ 5000
6L+8S≤4500
L≥0 and S≥0
(Availability of component A)
(Availability of component B)
Implement the linear optimization model and find an optimal solution. Interpret the optimal solution.
The optimal solution is to produce LaserStop models and SpeedBuster models. This solution gives the
(Type integers or decimals rounded to two decimal places as…
Which of the following statements is true regarding regression analysis?
Question 8 options:
Regression analysis considers all of the data points for determining the line that best fits the data so it is usually less accurate than the high-low method.
Regression analysis helps generate a statistic, called the R-square, which tells how well the line fits the data points.
Regression analysis can only be used by manufacturing companies to predict costs.
All of the above are true.
Chapter 10 Solutions
Horngren's Cost Accounting: A Managerial Emphasis (16th Edition)
Ch. 10 - What two assumptions are frequently made when...Ch. 10 - Describe three alternative linear cost functions.Ch. 10 - What is the difference between a linear and a...Ch. 10 - High correlation between two variables means that...Ch. 10 - Name four approaches to estimating a cost...Ch. 10 - Describe the conference method for estimating a...Ch. 10 - Describe the account analysis method for...Ch. 10 - List the six steps in estimating a cost function...Ch. 10 - When using the high-low method, should you base...Ch. 10 - Describe three criteria for evaluating cost...
Ch. 10 - Define learning curve. Outline two models that can...Ch. 10 - Discuss four frequently encountered problems when...Ch. 10 - Prob. 10.13QCh. 10 - All the independent variables in a cost function...Ch. 10 - Multicollinearity exists when the dependent...Ch. 10 - HL Co. uses the high-low method to derive a total...Ch. 10 - A firm uses simple linear regression to forecast...Ch. 10 - In regression analysis, the coefficient of...Ch. 10 - A regression equation is set up, where the...Ch. 10 - What would be the approximate value of the...Ch. 10 - Estimating a cost function. The controller of the...Ch. 10 - Identifying variable-, fixed-, and mixed-cost...Ch. 10 - Various cost-behavior patterns. (CPA, adapted)....Ch. 10 - Matching graphs with descriptions of cost and...Ch. 10 - Account analysis, high-low. Stein Corporation...Ch. 10 - Account analysis method. Gower, Inc., a...Ch. 10 - Prob. 10.27ECh. 10 - Estimating a cost function, high-low method. Lacy...Ch. 10 - Linear cost approximation. Dr. Young, of Young and...Ch. 10 - Cost-volume-profit and regression analysis....Ch. 10 - Regression analysis, service company. (CMA,...Ch. 10 - High-low, regression. May Blackwell is the new...Ch. 10 - Learning curve, cumulative average-time learning...Ch. 10 - Learning curve, incremental unit-time learning...Ch. 10 - High-low method. Wayne Mueller financial analyst...Ch. 10 - High-low method and regression analysis. Market...Ch. 10 - High-low method; regression analysis. (CIMA,...Ch. 10 - Regression, activity-based costing, choosing cost...Ch. 10 - Interpreting regression results. Spirit...Ch. 10 - Cost estimation, cumulative average-time learning...Ch. 10 - Cost estimation, incremental unit-time learning...Ch. 10 - Regression; choosing among models. Apollo Hospital...Ch. 10 - Multiple regression (continuation of 10-42). After...Ch. 10 - Cost estimation. Hankuk Electronics started...Ch. 10 - Prob. 10.45PCh. 10 - Interpreting regression results, matching time...Ch. 10 - Purchasing department cost drivers, activity-based...Ch. 10 - Purchasing department cost drivers, multiple...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- Auflegger, Inc., manufactures a product that experiences the following activities (and times): Required: 1. Compute the MCE for this product. 2. A study lists the following root causes of the inefficiencies: poor quality components from suppliers, lack of skilled workers, and plant layout. Suggest a possible cost reduction strategy, expressed as a series of if-then statements that will reduce MCE and lower costs. Finally, prepare a strategy map that illustrates the causal paths. In preparing the map, use only three perspectives: learning and growth, process, and financial. 3. Is MCE a lag or a lead measure? If and when MCE acts as a lag measure, what lead measures would affect it?arrow_forwardI dont need to know how to use solver. I just want to know the optimal solution to produce for both, and the profit.arrow_forwardYour team is conducting a CVP analysis for a new product. Different sales projections have different incomes. One member suggests picking numbers yielding favorable income because any estimate is “as good as any other.” Another member suggests dropping unfavorable data points for cost estimation. What do you do?arrow_forward
- A firm has recently added a new product to their offerings. Manufacturing reports that production is going smoothly and factory workers are becoming familiar with the manufacture of this product. All expectations are that the current rate of learning will continue and the manufacture of future units will be more efficient (i.e., take less time). The following shown table shows the results for the first two units produced. The firm has an order for two additional units. Assuming the pattern of learning curve continues (same rate): Solve, a. At what rate is learning occurring? b. How long will it take to produce the fourth unit? c. If the labor rate is $15 per hour, what is the cumulative average labor cost per unit for the first four units produced?arrow_forwardValencia Products make automobile radar detectors and assembles two models: LaserStop and SpeedBuster. Both models use the same electronic components. After reviewing the components required and the profit for each model, the firm found the following linear optimization model for profit, where x is the number of LaserStop models produced and y is the number of SpeedBuster models produced. Graph the constraints and identify the feasible region. Then identify each of the corner points and show how increasing the objective function value identifies the optimal solution. Maximize Profit=124x+138y 19x+12y ≤ 3000 6x + 7y ≤2500 x≥0 and y≥0 OB. 800- Ay 800- Q Q 408 406 G 50 65 x 400 800 O C. 800 400 O D. Ay 800- Q 400 800 Identify the vertices of the given feasible region. (0, 0), (0, 250), (157.89, 0) (Type an ordered pair, using integers or decimals rounded to two decimal places as needed. Use a comma to separate answers as needed.) The optimal solution is to produce LaserStop models and…arrow_forwardKSAs: Understand processes and concepts of cost-volume-profit. How to Calculate unit contribution margin, contribution margin, contribution margin ratio, and operating income?arrow_forward
- As a start-up company, Oriole Enterprises encourages its employees to think through the entire value chain to estimate whether it might be worthwhile to take a risk on new products. As part of that program, Sharon is reviewing a product concept that her intern presented to her. The basic idea is to use a common process, which would result in two intermediate products. One product could be sold right away (X). The other product (Y) would have no immediate sales value but after further processing would yield a very high- value product. Sharon is intrigued enough to dig further into her intern's quantitative analysis, as follows. Sales value of X immediately after the joint process Sales value of Y after further processing Product X's share of the joint process cost Proportion of joint cost allocated to Product Y (a) Your answer is correct. (b) Based on this information, determine which joint cost allocation method the intern must have used when allocating the joint costs to these…arrow_forwardAs a start-up company, Blue Enterprises encourages its employees to think through the entire value chain to estimate whether it might be worthwhile to take a risk on new products. As part of that program, Laura is reviewing a product concept that her intern presented to her. The basic idea is to use a common process, which would result in two intermediate products. One product could be sold right away (X). The other product (Y) would have no immediate sales value but after further processing would yield a very high- value product. Laura is intrigued enough to dig further into her intern's quantitative analysis, as follows. Sales value of X immediately after the joint process Sales value of Y after further processing Product X's share of the joint process cost Proportion of joint cost allocated to Product Y (a) Your answer is correct. $53,750 $406,000 $20,000 87.5% Based on this information, determine which joint cost allocation method the intern must have used when allocating the joint…arrow_forwardWe can get a sense of how model output responds to changes in inputs from sensitivity analyses. Some argue that we might draw very different conclusions when using different boundaries, especially when model output is a non-linear function of inputs. For example, we compute the net present value (NPV) of a business with a 10% discount rate. We can choose +/- 1% for our sensitivity analysis, or +/-5% for our analysis. For this reason, some argue that one can manipulate sensitivity analysis to support one’s prior. What do you think of this comment?arrow_forward
- a) CVP analysis help managers to take better decision. Justify with real life scenario. (b)Paste Corporation has established new plant for the production of new product called “Diazinon”. There are two different manufacturing methods available to produce Diazinon. Either by using a process or an order base method. The assembling technique won't influence the quality or deals of the item. The evaluated manufacturing expenses of the two strategies are as per the following: Process base Order base Variable manufacturing cost per unit..................... Rs14.00 Rs.17.60 Fixed manufacturing cost per year ......................Rs. 2,440,000 Rs. 1,320,000 The organization's statistical surveying office has suggested an initial selling cost of Rs.35 per unit for Diazinon. The yearly fixed selling and admin costs…arrow_forwardBalanced scorecard, social performance. Comtex Company provides cable and Internet services in the greater Boston area. There are many competitors that provide similar services. Comtex believes that the key to nancial success is to offer a quality service at the lowest cost. Comtex currently spends a signicant amount of hours on installation and postinstallation support. This is one area that the company has targeted for cost reduction. Comtex’s balanced scorecard for 2017 follows.arrow_forwardProvide a reasoned explanation for the observed sign on the cost driver variable in the maintenance cost regression. What alternative data or alternative regression specifications would you like to use to better capture the above relationship?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Essentials of Business Analytics (MindTap Course ...StatisticsISBN:9781305627734Author:Jeffrey D. Camm, James J. Cochran, Michael J. Fry, Jeffrey W. Ohlmann, David R. AndersonPublisher:Cengage LearningCornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage LearningExcel Applications for Accounting PrinciplesAccountingISBN:9781111581565Author:Gaylord N. SmithPublisher:Cengage Learning
Essentials of Business Analytics (MindTap Course ...
Statistics
ISBN:9781305627734
Author:Jeffrey D. Camm, James J. Cochran, Michael J. Fry, Jeffrey W. Ohlmann, David R. Anderson
Publisher:Cengage Learning
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning
Excel Applications for Accounting Principles
Accounting
ISBN:9781111581565
Author:Gaylord N. Smith
Publisher:Cengage Learning
What is variance analysis?; Author: Corporate finance institute;https://www.youtube.com/watch?v=SMTa1lZu7Qw;License: Standard YouTube License, CC-BY