Given the Mass Haul Diagram above and the following information: Excavation Cost: $3.50/cu. yd. • Borrow Cost: $3.75/cu. yd. • Overhaul Cost: $1.50/sta*cu. yd. • Free Haul Limit: 600 ft. Compute the total overhaul cost: $10,590.00 None of these. $1,590.00 $600.00 $990.00

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
### Mass Diagram

**Description:**

The Mass Diagram provides a visual representation of earthwork volumes along a project alignment. It plots the net cumulative yardage of cut and fill against the stations of the project. 

#### Diagram Details:
- **X-Axis (Stations):** Represents the stations along the project, ranging from 0 to 25.
- **Y-Axis (Net Cumulative Yardage):** Represents the volume of cut (excavation) and fill (embankment) in cubic yards, ranging from -5000 to 5000 cu. yd.

#### Key Points on the Curve:
- The points where the curve crosses the Y-Axis (net cumulative yardage) at zero indicate a balance between cut and fill.
- Positive values indicate fill (borrow), whereas negative values signify cut (excavation).

#### Specific Points on the Curve:
- Stations 0, 10, and 22 indicate zero net cumulative yardage.
- Station 5 has a net cumulative yardage of -3000 cu. yd.
- Station 7 shows a net cumulative yardage of 1500 cu. yd.
- Station 10 illustrates a peak fill of 3500 cu. yd.
- Between stations 7 and 10, and 16 and 20, corrective actions are taken to balance the fill and cut, indicated by green horizontal lines.

#### Calculation:
Given the Mass Haul Diagram and the following information:
- **Excavation Cost:** $3.50/cu. yd.
- **Borrow Cost:** $3.75/cu. yd.
- **Overhaul Cost:** $1.50/sta*cu. yd.
- **Free Haul Limit:** 600 ft.

The task is to compute the total overhaul cost.

#### Cost Calculation Options:
- $10,590.00
- None of these.
- $1,590.00
- $600.00
- $990.00

---

### Educational Material Usage:

This mass diagram is essential for civil engineering students and professionals in understanding earthwork computations and balancing cut and fill in construction projects. It helps in cost estimation and planning efficient material management strategies.
Transcribed Image Text:### Mass Diagram **Description:** The Mass Diagram provides a visual representation of earthwork volumes along a project alignment. It plots the net cumulative yardage of cut and fill against the stations of the project. #### Diagram Details: - **X-Axis (Stations):** Represents the stations along the project, ranging from 0 to 25. - **Y-Axis (Net Cumulative Yardage):** Represents the volume of cut (excavation) and fill (embankment) in cubic yards, ranging from -5000 to 5000 cu. yd. #### Key Points on the Curve: - The points where the curve crosses the Y-Axis (net cumulative yardage) at zero indicate a balance between cut and fill. - Positive values indicate fill (borrow), whereas negative values signify cut (excavation). #### Specific Points on the Curve: - Stations 0, 10, and 22 indicate zero net cumulative yardage. - Station 5 has a net cumulative yardage of -3000 cu. yd. - Station 7 shows a net cumulative yardage of 1500 cu. yd. - Station 10 illustrates a peak fill of 3500 cu. yd. - Between stations 7 and 10, and 16 and 20, corrective actions are taken to balance the fill and cut, indicated by green horizontal lines. #### Calculation: Given the Mass Haul Diagram and the following information: - **Excavation Cost:** $3.50/cu. yd. - **Borrow Cost:** $3.75/cu. yd. - **Overhaul Cost:** $1.50/sta*cu. yd. - **Free Haul Limit:** 600 ft. The task is to compute the total overhaul cost. #### Cost Calculation Options: - $10,590.00 - None of these. - $1,590.00 - $600.00 - $990.00 --- ### Educational Material Usage: This mass diagram is essential for civil engineering students and professionals in understanding earthwork computations and balancing cut and fill in construction projects. It helps in cost estimation and planning efficient material management strategies.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 5 steps with 5 images

Blurred answer
Knowledge Booster
Pricing excavation and backfill
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning