A hydraulic shovel will be used to excavate sandy clay and load it into a 12 BCY dump truck. The shovel production at 100% efficiency is estimated to be 300 BCY/hour and job efficiency is 0.80. Truck travel time is estimated to be 8.0 minutes and truck fixed cycle time (excluding loading) is estimated to be 2.0 minutes. Equipment costs for the shovel and trucks are $40/h (shovel) and $20/h (truck). A. How many trucks are theoretically required to obtain maximum production? B. What is the expected production of the system in banked measure using this number of trucks? C. What is the expected unit loading and hauling costs in $/BCY?

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
7.
A hydraulic shovel will be used to excavate sandy clay and load it into a 12 BCY
dump truck. The shovel production at 100% efficiency is estimated to be 300
BCY/hour and job efficiency is 0.80. Truck travel time is estimated to be 8.0
minutes and truck fixed cycle time (excluding loading) is estimated to be 2.0
minutes. Equipment costs for the shovel and trucks are $40/h (shovel) and $20/h
(truck).
A. How many trucks are theoretically required to obtain maximum
production?
B. What is the expected production of the system in banked measure using
this number of trucks?
C. What is the expected unit loading and hauling costs in $/BCY?
Transcribed Image Text:7. A hydraulic shovel will be used to excavate sandy clay and load it into a 12 BCY dump truck. The shovel production at 100% efficiency is estimated to be 300 BCY/hour and job efficiency is 0.80. Truck travel time is estimated to be 8.0 minutes and truck fixed cycle time (excluding loading) is estimated to be 2.0 minutes. Equipment costs for the shovel and trucks are $40/h (shovel) and $20/h (truck). A. How many trucks are theoretically required to obtain maximum production? B. What is the expected production of the system in banked measure using this number of trucks? C. What is the expected unit loading and hauling costs in $/BCY?
Expert Solution
steps

Step by step

Solved in 5 steps

Blurred answer
Knowledge Booster
Methods to determine productivity
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning