Four trucks, 1, 2, 3, and 4 are waiting on a loading dock at ABC Company that has only a single service bay. The trucks are labeled in the order that they arrived at the dock. Assume the current time is 1:00 PM. The times required to unload each truck and the times that the goods they contain are due in the plant are given in the following table. Truck 1 2 3 4 Unloading Time (minute) Time Material is Due 20 1:25 PM 14 1:45 PM 35 1:50 PM 10 1:30 PM Using the Critical Ratio (CR) rule, determine the schedule and complete the following: Instruction: Enter all your answer with 2 decimal places, unless otherwise noted. 1. The mean flow time is 2. The average tardiness is 3. The number of tardy trucks is 4. The flow time for Truck 3 is 5. The first truck to be unload is Truck No. minutes. minutes. minutes. (Enter integer) 6. The last truck to be unloaded is Truck No. . . (Enter integer) 7. The completion time for Truck No. 1 is PM. (Enter as X:XX, use 12-hour format)

icon
Related questions
Question

Don't use AI please. It's wrong and you will get a thumbs down

Four trucks, 1, 2, 3, and 4 are waiting on a loading dock at ABC Company that has only a single service bay. The trucks are labeled in the order that they arrived
at the dock. Assume the current time is 1:00 PM. The times required to unload each truck and the times that the goods they contain are due in the plant are
given in the following table.
Truck
1
2
3
4
Unloading Time (minute)
Time Material is Due
20
1:25 PM
14
1:45 PM
35
1:50 PM
10
1:30 PM
Using the Critical Ratio (CR) rule, determine the schedule and complete the following:
Instruction: Enter all your answer with 2 decimal places, unless otherwise noted.
1. The mean flow time is
2. The average tardiness is
3. The number of tardy trucks is
4. The flow time for Truck 3 is
5. The first truck to be unload is Truck No.
minutes.
minutes.
minutes.
(Enter integer)
6. The last truck to be unloaded is Truck No.
.
. (Enter integer)
7. The completion time for Truck No. 1 is
PM. (Enter as X:XX, use 12-hour format)
Transcribed Image Text:Four trucks, 1, 2, 3, and 4 are waiting on a loading dock at ABC Company that has only a single service bay. The trucks are labeled in the order that they arrived at the dock. Assume the current time is 1:00 PM. The times required to unload each truck and the times that the goods they contain are due in the plant are given in the following table. Truck 1 2 3 4 Unloading Time (minute) Time Material is Due 20 1:25 PM 14 1:45 PM 35 1:50 PM 10 1:30 PM Using the Critical Ratio (CR) rule, determine the schedule and complete the following: Instruction: Enter all your answer with 2 decimal places, unless otherwise noted. 1. The mean flow time is 2. The average tardiness is 3. The number of tardy trucks is 4. The flow time for Truck 3 is 5. The first truck to be unload is Truck No. minutes. minutes. minutes. (Enter integer) 6. The last truck to be unloaded is Truck No. . . (Enter integer) 7. The completion time for Truck No. 1 is PM. (Enter as X:XX, use 12-hour format)