For cost estimate: When you have Definitive final design drawings and specifications. (priced from the “bottom up”). The estimate should be: Group of answer choices +15%/-5% +10%/-5% Structural Tees +5%/-2%
Q: Q1 - Determine the power of the pump if the flow rate 0.075m3/sec, pump efficiency 0.95 And the pipe…
A: Detailed explanation:To determine the power of the pump given the provided details, we can follow…
Q: If the service dead load of the simply supported beam including its weight is 1.5 k/ft, consider L…
A:
Q: Π " M VL 1 ENTRANCE LOBBY 2 ADMINISTRATIVE OFFICE 3 PRINCIPAL'S OFFICE STAFF ROOM 5 AMPHITHEATER 6…
A: Approach to solving the question: please provide complete instructions Detailed explanation:…
Q: Diaphragm panels must have the which type glue Exterior 2. 4 POINTS Interior Glue Rubber Cement…
A: :
Q: Q.3 (a) A new concrete bridge is to be constructed near the sea and its design has to incorporate…
A: The first step in the evaluation process would be to conduct a thorough examination of the coating…
Q: I need detailed explanation solving this exercise from Foundation Engineering, step by step please.
A:
Q: GIVEN Perforated shear wall on Line B FIND WALL B-1 OPEN B-1 WALL B-2 See problem 1 for wall…
A:
Q: Muna khaleel اليوم عند 6:47 م 1:0. 2.3 Examples and problems at Fr = 1. For non-uniform sediments…
A:
Q: Determine distance h so that the centroid of the crosshatched region lies at y = h. 4 in. y 2 in. 2…
A: To determine the distance \( h \) such that the centroid of the crosshatched region lies at \( y = h…
Q: I need detailed help solving exercise 3 from Engineering Math. Step by step, please.
A: Step 1:Step 2: Step 3: Step 4:
Q: 5.5a Compute the displacements, reactions, and internal forces for the systems shown. E =constant
A:
Q: Please solve and show all of your work.
A:
Q: Suppose you want to use a hydraulic hoe and a fleet of trucks on an excavation project. If you…
A: To determine the minimum number of trucks required so that the hydraulic hoe can control production,…
Q: Irrigation and Drainage EngineeringWhat bottom width (B) trapezoidal grass-lined channel (n=0.035)…
A: The problem is asking for the bottom width (B) of a trapezoidal grass-lined channel that is required…
Q: The answer depicted is incorrect, any help would be appreciayed thanks!
A: First, we determined that there were roughly 2,835,664 Equivalent Single Axle Loads (ESALs) during…
Q: 12 - Determine the force in members EG, CH, and HI using method of joints. State whether each member…
A: We are given a truss structure with various loads and asked to determine the forces in members EG,…
Q: subject
A: Calculating the Volume of the Canal To calculate the cost of the first option, we need to find the…
Q: II.W: 1. Find the Maclaurin series generated by f(x)=- 1 1+x 2. Find the Maclaurin series generated…
A: Problem 1: Find the Maclaurin Series for f(x)=1+x1 The Maclaurin series for a function f(x) is the…
Q: Note: - I've posted this question 2 times and I'm getting poor quality answers!. Please provide a…
A: Step 1:Determine Reactions*AY + BY - 18(5) = 0 ... (1)ΣM(A) = 0: 18(5)(2.5) - MB - BY(3) = 0 ... (2)…
Q: (read imagez0
A:
Q: Using conservation of mass and the steady flow equation, for the apparatus shown below, show that…
A: Detailed explanation:
Q: = (e) Find the velocity, v1, v2 and the mass flow rate, Om,in when d₁ = 80 mm, d₂ 30 mm, and F = 3.5…
A:
Q: Need help, please provide all work and round answers to 3 sig figs.
A: Step 1:Step 2:
Q: Question 1 (Wastewater Treatment) 1.1 Water treatment often includes two disinfection steps; with…
A: 1.Wastewater treatment is designed to make water safe before it's discharged into the environment.…
Q: (b) A similar pile will be installed in a pile group of n by n piles, as shown in the figure below.…
A: Step 1:Step 2: Step 3: Step 4:
Q: Draw the influence lines for: a) the force in the cable AC, and b) the moment at D. Please provide…
A: I hope this is helpful.
Q: Need help, please show all work, steps, units and round to 3 significant figures. Thank you!
A: First, we need to determine the angle of the ramp. This can be done using the given dimensions and…
Q: A four-story reinforced concrete special moment-resisting public school is to be constructed in…
A:
Q: (Read Image) Hint: The answer is not 693.333. (Make sure units are Ibs-ft-sec^2)
A:
Q: I need detailed explanation solving this exercise from Reinforced Concrete, step by step please.
A:
Q: 3.1e Compute the displacements, reactions, and bar forces for the trusses shown. Cross-sectional…
A:
Q: Week 16-17 Application of DE of Order One Name: Section: 5. A bacterial population is known to have…
A: Question 5 Question 6 Question 7 Question 8
Q: Determine the final velocities v1' and v2' after the collision of the two cylinders. The coefficient…
A: Approach to solving the question:Conservation of momentum and Concept of Restitution Detailed…
Q: Determine the reactions for the following beam using the moment distribution method (Problem 15.4 of…
A: Step 1: Step 2: Step 3: Step 4:
Q: jUST PROBLEM 3
A: Step 1:Step 2:Step 3:
Q: Please answer the question in the picture and show all of your work please, Thank you so much for…
A: Step 1: To calculate the flow rate (Q) overtopping the road, we can use the weir flow equation for…
Q: 1. METHOD OF JOINTS В ། RAH ↑ RAV C 20KN E 1.5m 1.5m 1.5m F am . COMPUTE FOR REACTIONS • COMPUTE…
A: import sympy as sp # Define variables RAV, RF, RAH = sp.symbols('RAV RF RAH') # Reactions at…
Q: The 5-lbs piece of putty is dropped 9 ft onto the 18-lbs block initially at rest on the two springs,…
A: Approach to solving the question:Please see attached photos for detailed solutions. Thank you.…
Q: H.W 3: Determine the forces in the members identified by "x" of the truss shown by the method of…
A: Step 1: Step 2: Step 3:Step 4:
Q: The wet unit weight of a soil is 20 kN/m3 and its water content is 12%. Calculate its dry unit…
A: The problem is asking us to find the dry unit weight of the soil. The given values are the wet unit…
Q: 5. In a certain river basin, there are six rain-gauge stations, the normal annual rainfall depths at…
A:
Q: Need help with practice problem(Structural Analysis), use method of sections to determine the member…
A: To solve this problem step by step, we'll focus on determining the member forces ( F{CJ} ), ( F{FC}…
Q: Help with evironmental design problem. will thumbs up ONLY if correct.
A: Step 1: Step 2:calcation of head loss Step 3: Step 4:
Q: What Case of failure and accident due to miscoordination of construction equipment.
A: Need explain
Q: The final answer would be 1 hr. Show detailed solution. Thanks!
A: Step 1: Determine the tank cross-sectional area: The cross-sectional area at height h is circular,…
Q: It is desired to lay off certain horizontal distances for building layouts. The length of the tape…
A:
Q: (1) Braw the influence lines for: (a) the moment at C, (b) the vertical reaction at A, and (c) the…
A: Step 1:Step 2:Step 3:Step 4:
Q: I need detailed help solving this exercise from Applied Mechanics. Step by step, please.
A: Step 1:A cylindrical specimen with unidirectional fibres orientated in a certain direction (f) is…
Q: Please solve the problem
A: Step 1:
Q: Situation 6. In the two peg-test method of a dumpy level the following observations were taken.…
A: Step 1: Observations: From the table:Instrument set up near M:Reading on A=1.505mReading on…
Unlock instant AI solutions
Tap the button
to generate a solution
Click the button to generate
a solution
- The contractor implements last planner on the project. During week 1, the following tasks are planned and committed by different subcontractors. At the end of week 1, the status of the tasks is also shown in the following table. What is the percent plan complete (PPC) for week 1? Explain what PPC measures? Committed on Completion Progress Completion? Mobilize Yes 100% Yes Install Security Fence Yes 100% Yes Set Forms Yes 80% No Excavate Planter Foundation Yes 100% Yes Construct Masonry Planter Yes 50% Nousing suitable example differentiate direct and indirect cost (overhead cost)A civil engineer is asked to select a new scraper for his construction form. he collects data from two equipment manufacturers and the data are shown in the table below
- The following information belongs to a target cost contract: Target cost = $250 M Target band = $230 M and ends $270 M Target contractor fee = $10.5 M Cost saving share = 55/45 by owner Cost increase share = 65/35 by contractor Contractor minimum fees =$5 M The GMC = $320 M Minimum expected project cost = $ 200 M Calculate the contractor fee, if the project cost is 280 M? Select one: a. 6 M b. 3 M c. 4 M d. 5 MDefine in your own words the construction cost estimate and list and describe the different types of construction estimates.Using the same CPM diagram, what is the total project duration? Immediate Estimated Activity Activity Description Predecessors Duration A Excavate 2 weeks Lay the foundation Put up the rough wall Put up the roof Install the exterior plumbing Install the interior plumbing Put up the exterior siding Do the exterior painting B A 4 weeks C 10 weeks D C 6 weeks 4 weeks 5 weeks 7 weeks 9 weeks 7 weeks 8 weeks 4 weeks E C F E G D E, G Do the electrical work F, I Put up the wallboard Install the flooring Do the interior painting Install the exterior fixtures K 5 weeks M 2 weeks N Install the interior fixtures K, L 6 weeks Total = 79 weeks
- What generally contributes most to the capital (construction) cost of a building? Is it materials? Construction labor costs? Is there a way to estimate the annual operating costs of a building? Research building construction and important considerations that might impact any decision on new construction? (please include any references for your answer)I need hand written solution onlyIf you don't know the answer please leave it but don't copy from Google. Rating will depend on your quality answer. Thank you. Identify the strategies that must be used to implement ISO 9000 in a construction organization.
- Q#: Differentiate between rough and detailed cost estimate with examples.Your company a Management consultant firm is awarded a contract to assist a client to procure a design consultant who will do the design work for shopping complex. Complete the evaluation, rank the proposal according to their total score and write your recommendation to the owner. Note that client stated that the price is 50% more important than the price. C&G CONS. Weight Scoring Rating Price Scoring Rating Price Scoring Rating Price SPC TEMAX-409 Items Equipment Adequacy of proposed desim methodology Qualification of Staff Experience Total Technical score Total score 0.25 75 85 90 0.15 80 95 85 025 65 80 85 035 55 90 88 000'ss7 000'067 000'682This assignment consists of determining the quantities for a cost estimate in different units. Assume a rectangular warehouse with internal measurements of 22' wide, 34’long and 12' high. The warehouse has (including the frame): One 6' wide and 5' high window on all walls. A 6' wide and 8' high door in the front wall. Walls: 6” block (above floor) Concrete: thickness of ceiling = 5” and floor = 4” Assume 4 14” x 14” columns (1 column at each corner of warehouse) and one beam throughout perimeter below ceiling 14" wide and 20" high. The 4” concrete floor has a 6” wide by 12” high perimeter beam. The column footing will be counted 2'-6" from the top of the floor. Square footing size is 6'-0" x 6'-0" by 12" thick. Make a drawing with your best interpretation