The predicted traffic mix of a proposed four-lane urban non-interstate freeway is as follows. Passenger cars = 78% Single-unit trucks: 2-axle, 5,000 lb/axle 12% 2-axle, 9,000 lb/axle = 4% 3-axle or more, 23,000 lb/axle = 3% Tractor semitrailers and combinations: 3-axle, 20,000 lb/axle = 3% The projected AADT during the first year of operation is 3,900 (both directions). If the traffic growth rate is estimated at 3 percent and the CBR of the subgrade is 7.5, determine the depth of a full-asphalt pavement (in inches) using the AASHTO method and n = 20 years. The resilient modulus of the asphalt (EAC) is 320,000 lb/in². Assume m; for the subgrade is 1 and the percent of traffic on the design lane is 42 percent, pt = 2.5, and SN = 4. Use a reliability level of 90 percent, a standard deviation of 0.45, and a design serviceability loss of 2.0. Assume the design lane factor fd is 0.42. (Use single-axle load equivalency factors for 2-axle vehicles and tandem-axle load equivalency factors for 3-axle vehicles.) 10 x Your response differs from the correct answer by more than 10%. Double check your calculations. inches
The predicted traffic mix of a proposed four-lane urban non-interstate freeway is as follows. Passenger cars = 78% Single-unit trucks: 2-axle, 5,000 lb/axle 12% 2-axle, 9,000 lb/axle = 4% 3-axle or more, 23,000 lb/axle = 3% Tractor semitrailers and combinations: 3-axle, 20,000 lb/axle = 3% The projected AADT during the first year of operation is 3,900 (both directions). If the traffic growth rate is estimated at 3 percent and the CBR of the subgrade is 7.5, determine the depth of a full-asphalt pavement (in inches) using the AASHTO method and n = 20 years. The resilient modulus of the asphalt (EAC) is 320,000 lb/in². Assume m; for the subgrade is 1 and the percent of traffic on the design lane is 42 percent, pt = 2.5, and SN = 4. Use a reliability level of 90 percent, a standard deviation of 0.45, and a design serviceability loss of 2.0. Assume the design lane factor fd is 0.42. (Use single-axle load equivalency factors for 2-axle vehicles and tandem-axle load equivalency factors for 3-axle vehicles.) 10 x Your response differs from the correct answer by more than 10%. Double check your calculations. inches
Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter6: Fundamental Principles Of Traffic Flow
Section: Chapter Questions
Problem 25P
Related questions
Question
The answer depicted is incorrect, any help would be appreciayed thanks!

Transcribed Image Text:The predicted traffic mix of a proposed four-lane urban non-interstate freeway is as follows.
Passenger cars = 78%
Single-unit trucks:
2-axle, 5,000 lb/axle
12%
2-axle, 9,000 lb/axle
= 4%
3-axle or more, 23,000 lb/axle = 3%
Tractor semitrailers and combinations:
3-axle, 20,000 lb/axle = 3%
The projected AADT during the first year of operation is 3,900 (both directions). If the traffic growth rate is estimated at 3 percent and the CBR of the subgrade is 7.5, determine the depth of a full-asphalt
pavement (in inches) using the AASHTO method and n = 20 years. The resilient modulus of the asphalt (EAC) is 320,000 lb/in². Assume m; for the subgrade is 1 and the percent of traffic on the design lane is
42 percent, pt = 2.5, and SN = 4. Use a reliability level of 90 percent, a standard deviation of 0.45, and a design serviceability loss of 2.0. Assume the design lane factor fd is 0.42. (Use single-axle load
equivalency factors for 2-axle vehicles and tandem-axle load equivalency factors for 3-axle vehicles.)
10
x
Your response differs from the correct answer by more than 10%. Double check your calculations. inches
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps

Recommended textbooks for you

Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning

Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,

Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,

Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning

Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,

Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,

Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning
