Fundamentals Of Construction Estimating
4th Edition
ISBN: 9781337399395
Author: Pratt, David J.
Publisher: Cengage,
expand_more
expand_more
format_list_bulleted
Textbook Question
Chapter 3, Problem 9RQ
The cost of transportation of materials has to be allowed for in the estimate, but this item is not usually measured or even referenced in the takeoff. List six other similar items.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
You are a project manager on a construction project that is located 500 kms away from your
barracks. Your team is composed of 41 persons including you. Going to the site, you are
allowed to use 7 vehicles. Some of the vehicles can hold 7 people each, and the rest can hold
5 people each. Assuming all the vehicles are filled to capacity, and all the vehicles have
designated drivers that are included in your team.
a. Exactly how many of the vehicles can hold 7 people?
b. Exactly how many of the vehicles can hold 5 people?
solve the equation using the excel
Please use the graphic below for the following questions.
ESALS per Vehicle
6
0.0007
Car
0.10
2
1.35
Delivery Truck Loaded 18-Wheeler
1.85
Loaded 40' Bus
5.11
Loaded 60°
Articulated Bus
A) Delivery truck - Assuming that the truck has two separate axles with even distribution
of ESAL's. Determine the load in pounds for each of the axles in pound?
B) Loaded 18-Wheler - Assuming that the 18-wheeler has a single axle on the front that
carries 1/5 ESAL's and two rear double axles caring 2/5 ESALS on each. What is the
front axle and each of two double axles in pound?
Chapter 3 Solutions
Fundamentals Of Construction Estimating
Ch. 3 - What is the objective of a quantity takeoff?Ch. 3 - Why is it recommended that estimators follow a...Ch. 3 - What is the difference between an estimator’s...Ch. 3 - Prob. 4RQCh. 3 - What are the two components that make up a takeoff...Ch. 3 - In what order are dimensions entered onto the...Ch. 3 - Why should a figured dimension be used in...Ch. 3 - Why should an estimator include headings and side...Ch. 3 - The cost of transportation of materials has to be...Ch. 3 - What level of accuracy should the estimator pursue...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Please solve this question. There are two alternatives for a construction firm to purchase a road roller which will be used for the construction of a highway section. The cash flow details of the alternatives are as follows; Alternative-1: Initial purchase cost = Rs.1,500,000, Annual operating cost = Rs.35,000 starting from the end of year “2” (negligible in the first year) till the end of useful life, Annual revenue to be generated = Rs.340,000 for first 4 years and then Rs.320,000 afterwards till the end of useful life, Expected salvage value = Rs.430,000, Useful life = 8 years. Alternative-2: Initial purchase cost = Rs.1,800,000, Annual operating cost = Rs.25,000, Annual revenue to be generated = Rs.365,000, Expected salvage value = Rs.550,000, Useful life = 8 years. Evaluate these alternatives & find out the most economical alternative on the basis of equivalent future worth at the interest rate of 9.5% per year.arrow_forwardTransportation engineeringarrow_forwardGiven the list of construction activities for your newly-acquired residential project. Determine the critical path for this project. Activity Depends on Duration (weeks) D A 5 B A 3 G E 3 4 E В. С 2 G. H, I 2 A 4 F C. D 5 E. F A none The critical path for this project is Note: Use this format in your final answer/s, such as if your answer is S, T, U, V, W, then type your final answer as S-T-U-V-Warrow_forward
- If a flight with 500 available seats carries 300 passengers, what is the passenger load factor?arrow_forwardTrue or False? The total machinery area for a machine is determined by identifying the floor space for each machine, machine travel, maintenance and service area requirements.arrow_forwardAn excursion bus has 12 married couples passenger. Eight couples brought no children while 4 of them brought 3 children a piece. Including the driver, the bus has 27 passengers. How many married children ( couple ) are there? Select one: a. 4 b. 5 c. 3 d. 0arrow_forward
- The company wants to locate a new machine tool in a maintenance department. Suppose that there are 5 existing machines that have a material handling relationship with the new machine and are located at the following points (see the second column of the table). The number of trips in a day between the new machine and the existing machines are in the third column of the table. Find the optimum location for the new machine using the Median Method. Suppose it is not possible to place the new machine at the point found in part a. Find and draw the contour lines for (2. 6). Fir a) b) Hospital Coordinates (x, y) Number of trips 1,5 1,4 2,3 4 3.5 4,4 2arrow_forwardA large manufacturer uses two factors to decide whether to use truck or rail for movement of itsproducts to market: cost and total travel time. The manufacturer uses a utility formula that rateseach mode. The formula is U = 5C + 10T, where C is cost ($/ton) and T is time (hours). For agiven shipment of goods, a trucking firm can deliver in 16 hours and charges $25/ton, whereas arailroad charges $17/ton and can deliver in 25 hours. a. Which mode should the shipper select? b. What other factors should the shipper take into account in making a decision?arrow_forwardQ1. Calculate the expected hourly owning and operating cost for the second year of operation of the twin-engine scraper described below: Cost delivered 300,000 JD Tire cost = 24,000 JD Estimated life= 5 years Salvage value = 30,000 JD Depreciation method=sum-of-the-years digits Investment (interest) rate = 10% Hours used per year = 2,000 hr Tax, insurance, and storage rate = 8% Rated power = 465 hp Fuel price=0.40JD/ liter Operator's wages = 6 JD/h Fuel consumption factor = 0.035 liter /h/hp Service cost factor = 33% of hourly fuel cost Equipment Repair cost = 8.4 JD/h Estimated tire life= 3,000 hrarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage LearningEngineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Engineering Fundamentals: An Introduction to Engi...
Civil Engineering
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Cengage Learning
Concrete Slab Calculations 006; Author: Jerry Howard;https://www.youtube.com/watch?v=R19jILyBxio;License: Standard Youtube License