A 10-in thick, 26-ft wide concrete pavement is to be placed with a slipform paver using 8-cy batches mixed at a central-mix plant. Each batch is mixed for an average of 1.9 min, and the plant is 75% efficient. Plant production matches paver production. Paver production is 85% efficient. Truck cycle time is 50 min. Hourly rates: Equipment                                             Labor Paver, $210                                           Foreman, $52 Texture Bar, $45                                   3 Operators, $46 each Tine Bar, $45                                        9 Laborers, $39 each Water Truck, $65                                 2 Finishers, $43 each 2 Pickups, $20 each                             Truck drivers, $35 each Haul Truck, $65 each Concrete materials cost $65.50/cy, batching cost is $18.65/cy, and incidentals cost $8.32/cy. Overhead and profit is 34% of the previous costs. Round up and add an additional truck to balanced number. Find (a) number of trucks, (b) paver speed, (c) $/cy cost, and (d) $/sy cost.

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter18: Bituminous Materials
Section: Chapter Questions
Problem 5P: Given the specifications for an asphaltic concrete mixture and the results of a sieve analysis,...
icon
Related questions
Question

A 10-in thick, 26-ft wide concrete pavement is to be placed with a slipform paver using 8-cy batches mixed at a central-mix plant. Each batch is mixed for an average of 1.9 min, and the plant is 75% efficient.

Plant production matches paver production. Paver production is 85% efficient. Truck cycle time is 50 min. Hourly rates:

Equipment                                             Labor

Paver, $210                                           Foreman, $52

Texture Bar, $45                                   3 Operators, $46 each

Tine Bar, $45                                        9 Laborers, $39 each

Water Truck, $65                                 2 Finishers, $43 each

2 Pickups, $20 each                             Truck drivers, $35 each

Haul Truck, $65 each

Concrete materials cost $65.50/cy, batching cost is $18.65/cy, and incidentals cost $8.32/cy. Overhead and profit is 34% of the previous costs. Round up and add an additional truck to balanced number.

Find (a) number of trucks, (b) paver speed, (c) $/cy cost, and (d) $/sy cost.

Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Similar questions
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
Construction Materials, Methods and Techniques (M…
Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning
Solid Waste Engineering
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,
Principles of Geotechnical Engineering (MindTap C…
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning