BPR130_CH07-1_Test
pdf
keyboard_arrow_up
School
Wake Tech *
*We aren’t endorsed by this school
Course
BPR130
Subject
Mechanical Engineering
Date
Apr 3, 2024
Type
Pages
16
Uploaded by JudgeInternet11991
Review Test Submission: Chapter 07-1 Test
•
Question 1
1 out of 1 points A site benchmark is commonly a USGS datum.
Selected Answer:
True Correct Answer:
True
•
Question 2
1 out of 1 points The NEC® permits no more than 13 general-purpose outlets to be connected to a(n) __________ A circuit. Selected Answer:
20
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
20
Pattern Match
(?i)20( ?A|[ -]amps?|[ -]amperes?)?
Pattern Match
(?i)twenty( (amps?|amperes?))?
•
Question 3
1 out of 1 points Installation of electrical equipment must conform to all local codes and the __________. Selected Answer:
NEC
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
national electrical code
Exact Match
nec
•
Question 4
1 out of 1 points A raised earth embankment is a(n) __________. Selected Answer:
berm
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
berm
•
Question 5
1 out of 1 points __________ runs are electrical conductors that extend from the power source to the point of use. Selected Answer:
home
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
home
Pattern Match
(?i)home([ -]?runs?)?
•
Question 6
1 out of 1 points A(n) __________ is a short wall that surrounds a flat roof to conceal mechanical equipment mounted on the ro
Selected Answer:
parapet
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
parapet
Pattern Match
(?i)parapet([ -]wall)?
•
Question 7
1 out of 1 points A(n) __________ bonding agent is applied between an asphalt curb and topping pavement to prevent wate
Selected Answer:
asphaltic
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
asphaltic
•
Question 8
1 out of 1 points An engineer is required to finalize standard drawings for local conditions and codes.
Selected Answer:
True Correct Answer:
True
•
Question 9
1 out of 1 points Stormwater and sanitary sewer piping, and electrical, telephone, and natural gas service are shown on a(n) __
Selected Answer:
utility
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
utility
Pattern Match
(?i)utility([ -]plans?)?
•
Question 10
1 out of 1 points __________ duct connectors minimize vibration and reduce sound transmission between HVAC equipment an
Selected Answer:
isolation
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
flexible
Exact Match
isolation
•
Question 11
10 out of 10 points
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
o
Question
Correct Match
Selected Match
A 2.
Duplex receptacles 2.
Duplex receptacles B 1.
Three-way switch 1.
Three-way switch C 3.
Pushbutton 3.
Pushbutton D 8.
Outdoor pole-mounted fixture 8.
Outdoor pole-mounted fixture E 10.
Computer data outlet 10.
Computer data outlet F 9.
Split-wired triplex recptacle 9.
Split-wired triplex recptacle G 6.
Disconnect switch 6.
Disconnect switch H 4.
Electric motor 4.
Electric motor I 5.
Emergency battery pack with charger 5.
Emergency battery pack with charger J 7.
Weatherproof switch 7.
Weatherproof switch •
Question 12
1 out of 1 points The monument sign is placed outside the public utility easement. Refer to Wendy's Restaurant Plans - Civil Plans (Sheets C-2 to C-6).
Selected Answer:
False Correct Answer:
False
•
Question 13
1 out of 1 points The depressed curb along the asphalt driveway apron is tied to the existing curb using two #__________ reba
Refer to Wendy's Restaurant Plans - Civil Plans (Sheets C-2 to C-6).
Selected Answer:
4
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
4
Pattern Match
(?i)#?4(\s?rebar)?
•
Question 14
1 out of 1 points The longest property line is __________' long. Refer to Wendy's Restaurant Plans - Civil Plans (Sheets C-2 to C-6).
Selected Answer:
226.26'
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
226.26
Pattern Match
(?i)226.26('|\s?(ft|ft.|feet))?
•
Question 15
0 out of 1 points The flow line for Type A catch basins is a minimum of 6" from the granular bedding. Refer to Wendy's Restaurant Plans - Civil Plans (Sheets C-2 to C-6).
Selected Answer:
True Correct Answer:
False
•
Question 16
0 out of 1 points The minimum separation between the proposed water main and storm or sanitary sewers is __________". Refer to Wendy's Restaurant Plans - Civil Plans (Sheets C-2 to C-6).
Selected Answer:
1.5'
Correct Answer:
Evaluation Method
Correct Answer
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Exact Match
18
Pattern Match
(?i)18("|\s?(in|in.|inch|inches))?
Pattern Match
(?i)eighteen(\s(in|in.|inch|inches))?
•
Question 17
1 out of 1 points Rough-sawn cedar boards for the trash enclosure sides measure 1 x 8 x __________. Refer to Wendy's Restaurant Plans - Site Details (Sheet 2).
Selected Answer:
6'-4"
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
6'-4"
Pattern Match
6'[\s-]?4"
Pattern Match
(?i)6('|\s?(ft|ft.|feet))[\s-
]4("|\s?(in|in.|inch|inches))
Pattern Match
(?i)six\s(ft|ft.|feet)[\s-
]four\s(in|in.|inch|inches)
•
Question 18
1 out of 1 points Exterior pole lights are metal halide vertical fixtures. Refer to Wendy's Restaurant Plans - Site Details (Sheet 2).
Selected Answer:
True Correct Answer:
True
•
Question 19
1 out of 1 points The finished surface of the concrete slab for the trash enclosure is __________" above grade. Refer to Wendy's Restaurant Plans - Site Details (Sheet 2).
Selected Answer:
6
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
6
Pattern Match
(?i)6("|\s?(in|in.|inch|inches))?
Pattern Match
(?i)six(\s(in|in.|inch|inches))?
•
Question 20
1 out of 1 points Placement of concrete footings for exterior signs is coordinated with the [blank1]
and [blank2]
. Refer to Wendy's Restaurant Plans - Site Details (Sheet 2).
Specified Answer for: blank1
signage erector
Specified Answer for: blank2
General Contractor
Correct Answers for: blank1
Evaluation Method
Correct Answer
Exact Match
sign erector
Pattern Match
(?i)sign(age)?[\s-]erectors?
Correct Answers for: blank2
Evaluation Method
Correct Answer
Exact Match
general contractor
Pattern Match
(?i)general[\s-]contractors?
•
Question 21
1 out of 1 points The electrical contractor must install 30' light poles for the exterior pole lights. Refer to Wendy's Restaurant Plans - Site Details (Sheet 2).
Selected Answer:
True Correct Answer:
True
•
Question 22
1 out of 1 points All footings are designed for 3,000 PSF soil-bearing pressure. Refer to Wendy's Restaurant Plans - Foundation Plan (Sheet 3).
Selected Answer:
True
Correct Answer:
True
•
Question 23
1 out of 1 points Footing depths below grade must be verified with the local code. Refer to Wendy's Restaurant Plans - Foundation Plan (Sheet 3).
Selected Answer:
True Correct Answer:
True
•
Question 24
1 out of 1 points Foundation walls at the pick-up windows are 8" and 12" concrete masonry units. Refer to Wendy's Restaurant Plans - Foundation Plan (Sheet 3).
Selected Answer:
True Correct Answer:
True
•
Question 25
1 out of 1 points Concrete control joints must be sawn within 8 hours of concrete placement. Refer to Wendy's Restaurant Plans - Foundation Plan (Sheet 3).
Selected Answer:
False Correct Answer:
False
•
Question 26
1 out of 1 points The thickness of the concrete floor slab is 4". Refer to Wendy's Restaurant Plans - Foundation Plan (Sheet 3).
Selected Answer:
True Correct Answer:
True
•
Question 27
1 out of 1 points All accessible restroom stall doors have __________ hinges. Refer to Wendy's Restaurant Plans - Floor Plan (Sheet 4).
Selected Answer:
self closing
Correct Answer:
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Evaluation Method
Correct Answer
Exact Match
self-closing
Pattern Match
self[\s-]?closing(\shinges)?
•
Question 28
1 out of 1 points Stainless steel panels behind the cooking equipment are installed by carpenters. Refer to Wendy's Restaurant Plans - Floor Plan (Sheet 4).
Selected Answer:
False Correct Answer:
False
•
Question 29
1 out of 1 points All base trim in Room 101 is to be __________ tile. Refer to Wendy's Restaurant Plans - Floor Plan (Sheet 4).
Selected Answer:
decorative tile
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
decorative
Pattern Match
(?i)decor(\.|ative)?([\s-]tile)?
•
Question 30
1 out of 1 points The 7'-1" high soffit between Rooms 105 and 107 is __________ wide. Refer to Wendy's Restaurant Plans - Floor Plan (Sheet 4).
Selected Answer:
3'
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
3'-0"
Pattern Match
3'([\s-]?0")?
Pattern Match
(?i)3('|\s?(ft|ft.|feet))([\s-
]0("|\s?(in|in.|inch|inches)))?
Pattern Match
(?i)three\s(ft|ft.|feet)([\s-
]zero\s(in|in.|inch|inches))?
•
Question 31
1 out of 1 points Pivot hinges are specified for three door types. Refer to Wendy's Restaurant Plans - Floor Plan (Sheet 4).
Selected Answer:
False Correct Answer:
False
•
Question 32
1 out of 1 points The sliding pick-up windows are shown on the __________ Elevation. Refer to Wendy's Restaurant Plans - Exterior Elevations (Sheet 5).
Selected Answer:
LEFT SIDE
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
Left Side
Pattern Match
(?i)left([\s-]side)?
•
Question 33
1 out of 1 points The downspouts are connected to underground drain lines. Refer to Wendy's Restaurant Plans - Exterior Elevations (Sheet 5).
Selected Answer:
True Correct Answer:
True
•
Question 34
1 out of 1 points The Wendy's sign is supplied by the owner. Refer to Wendy's Restaurant Plans - Exterior Elevations (Sheet 5).
Selected Answer:
True Correct Answer:
True
•
Question 35
1 out of 1 points
Two scuppers with downspouts are shown on the Front Elevation. Refer to Wendy's Restaurant Plans - Exterior Elevations (Sheet 5).
Selected Answer:
False Correct Answer:
False
•
Question 36
1 out of 1 points Brick veneer is 4" thick throughout the entire exterior. Refer to Wendy's Restaurant Plans - Exterior Elevations (Sheet 5).
Selected Answer:
True Correct Answer:
True
•
Question 37
1 out of 1 points Regarding Elevation 3, __________. Refer to Wendy's Restaurant Plans - Interior Elevations (Sheet 6A to E), Floor Plan (Sheet 4), & Finish Schedule (Sheet F-1).
Selected Answer:
the reference for this elevation is in Room 101 Correct Answer:
the reference for this elevation is in Room 101 •
Question 38
1 out of 1 points Regarding the Vanity Section, __________. Refer to Wendy's Restaurant Plans - Interior Elevations (Sheet 6A to E), Floor Plan (Sheet 4), & Finish Schedule (Sheet F-1).
Selected Answer:
exposed plumbing must be insulated and protected Correct Answer:
exposed plumbing must be insulated and protected •
Question 39
1 out of 1 points Regarding Elevation 17, __________. Refer to Wendy's Restaurant Plans - Interior Elevations (Sheet 6A to E), Floor Plan (Sheet 4), & Finish Schedule (Sheet F-1).
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Selected Answer:
Elevations 15, 16, and 18 also provide information about the Men's Room Correct Answer:
Elevations 15, 16, and 18 also provide information about the Men's Room •
Question 40
1 out of 1 points The pattern repeats on US Axminister Amazon carpet are __________. Refer to Wendy's Restaurant Plans - Interior Elevations (Sheet 6A to E), Floor Plan (Sheet 4), & Finish Schedule (Sheet F-1).
Selected Answer:
18" x 18" Correct Answer:
18" x 18" •
Question 41
1 out of 1 points Regarding Elevation 4, __________. Refer to Wendy's Restaurant Plans - Interior Elevations (Sheet 6A to E), Floor Plan (Sheet 4), & Finish Schedule (Sheet F-1).
Selected Answer:
the header is 8'3" from the finished floor Correct Answer:
the header is 8'3" from the finished floor •
Question 42
1 out of 1 points The scupper detail is Section A, Sheet 7A. Refer to Wendy's Restaurant Plans - Wall Sections (Sheet 7A & 7B) and Floor Plan (Sheet 4).
Selected Answer:
False Correct Answer:
False
•
Question 43
1 out of 1 points The 1'-4" x 8" concrete footings are reinforced with two #4 rebar running continuously. Refer to Wendy's Restaurant Plans - Wall Sections (Sheet 7A & 7B) and Floor Plan (Sheet 4).
Selected Answer:
True
Correct Answer:
True
•
Question 44
1 out of 1 points The bottom of the foundation footing must be a minimum of 2'-8" below grade. Refer to Wendy's Restaurant Plans - Wall Sections (Sheet 7A & 7B) and Floor Plan (Sheet 4).
Selected Answer:
False Correct Answer:
False
•
Question 45
1 out of 1 points The soffit detail over the front counter assembly is shown in Section K, Sheet 7B. Refer to Wendy's Restaurant Plans - Wall Sections (Sheet 7A & 7B) and Floor Plan (Sheet 4).
Selected Answer:
False Correct Answer:
False
•
Question 46
1 out of 1 points Shear wall anchor bolts are 1¼" diameter x 24" long. Refer to Wendy's Restaurant Plans - Wall Sections (Sheet 7A & 7B) and Floor Plan (Sheet 4).
Selected Answer:
True Correct Answer:
True
•
Question 47
1 out of 1 points Diagonal braces for roof trusses are fastened with __________d nails. Refer to Wendy's Restaurant Plans - Structural Plan (Sheet 8) and Structural Details and Notes (Sheet 8A).
Selected Answer:
10
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
10
Exact Match
10d
•
Question 48
1 out of 1 points
The size of the steel lintels over entrance doors into the Public Area is __________. Refer to Wendy's Restaurant Plans - Structural Plan (Sheet 8) and Structural Details and Notes (Sheet 8A).
Selected Answer:
4"x3.5"x5/16"
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
4" x 3 1/2" x 5/16"
Pattern Match
(?i)4"\s?(x|\*|by)\s?(3 1/2|3.5)"\s?(x|\*|by)\s?(5/16|0?\.3125
•
Question 49
1 out of 1 points The sheet metal top cap on brick parapet walls is installed by the __________. Refer to Wendy's Restaurant Plans - Structural Plan
(Sheet 8) and Structural Details and Notes (Sheet 8A).
Selected Answer:
general contractor
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
general contractor
Pattern Match
(?i)general[\s-]contractor
Pattern Match
(?i)G\.? ?C\.?
•
Question 50
1 out of 1 points Truss-bearing metal-framed walls are reinforced with __________ horizontal channel bridging spaced a maxim
Refer to Wendy's Restaurant Plans - Structural Plan (Sheet 8) and Structural Details and Notes (Sheet 8A).
Selected Answer:
1.5"
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
1 1/2"
Pattern Match
(?i)(1 1/2|1\.5)("|\s?(in|in.|inch|inches)
•
Question 51
0 out of 1 points
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
The depth of the water heater shelf from front edge to rear wall is __________. Refer to Wendy's Restaurant Plans - Structural Plan (Sheet 8) and Structural Details and Notes (Sheet 8A).
Selected Answer:
5'-2.5"
Correct Answer:
Evaluation Method
Correct Answer
Exact Match
2'-7 1/2"
Pattern Match
(?i)2'[\s-]?(7 1/2|7.5)"
Pattern Match
(?i)2\s?(ft|ft.|feet)[\s-](7 1/2|7.5)\s?(in|in.|inch|inches)
Tuesday, October 17, 2023 2:25:58 PM EDT
Related Documents
Related Questions
I can't find the symbols for the blank ones
arrow_forward
I need these 3 parts answered for a review activity.
arrow_forward
I need these 3 parts answered TRUE or FALSE.
arrow_forward
I need help solving these 3 simple parts, if you can not answer all 3 parts then please leave it for another tutor, thank you.
arrow_forward
Could you please explain where and what is tight side and also how to find 5-9
arrow_forward
Given the removal and replacement time data in the table, calculate IMART (mean time to repair)
Part identity
Bolts
Earth strap
Power lead
Signal lead
Cover plate
Brushes
Lesson 1.2 HW#1
Quantity Failure rate x 10-4 (h) Total M task time (h)
3
0.20
1
0.10
0.36
0.10
0.26
0.35
2
0.46
0.12
0.36
1.16
1.05
23.6
arrow_forward
00
T
R
%24
Bb R
V qa
du/webapps/assessment/take/launch.jsp?course_assessment_id%=_254968_1&course_id%3D 3565256_1&content id= 52826
* Question Completion Status:
Attach File
Browse Local Files
Browse Content Collection
QUESTION 2
A company needs to choose one supplier for a particular type of silicon wafer used'in the production of
semiconductors. The company has three options. Supplier A sells the silicon wafers for $2.50 per wafer,
independently of the number of wafers ordered. Supplier B sells the wafers for $2.40 each but does not
consider an order for less than 2,000 wafers. Supplier C sells the wafers for $2.30 each but does not accept
an order for less than 3,000 wafers. Assume an order setup cost of $100 and an annual requirement of 20,000
wafers. Assume a 20% annual interest rate for holding cost calculations.
a. Which supplier should be chosen to minimize the total annual cost for the wafers, and what is the
optimal order quantity?
b. If the replenishment lead time for wafers…
arrow_forward
Don't use chatgpt will upvote
arrow_forward
Pls Comment on the use of layout and other elements in the washing machine control panel. If errors occur based on this layout, walk through the accident scenario. Suggest potential ways of improving the interface to avoid a similar problem occurring.
arrow_forward
can you please find the solution for this?
arrow_forward
What’s the the answer please
arrow_forward
Select all the factors that affect the choice of sensor for level measurement? 0ptions:
direct or indirect
corrosiveness
liquid temperature and pressure
turbulence
particulate in a liquid
free flowing solids
volatility
single or continuous point measurements
arrow_forward
How many auxiliary views are found on this print?
arrow_forward
I need help please.
Apply a dia 0.5 at MMC straightness control to the axis of the part above and draw the resultant tolerance zone and virtual size on the sketch of the produced part below.
The image and question are also attached.
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you

Elements Of Electromagnetics
Mechanical Engineering
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Oxford University Press

Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:9780134319650
Author:Russell C. Hibbeler
Publisher:PEARSON

Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:9781259822674
Author:Yunus A. Cengel Dr., Michael A. Boles
Publisher:McGraw-Hill Education

Control Systems Engineering
Mechanical Engineering
ISBN:9781118170519
Author:Norman S. Nise
Publisher:WILEY

Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:9781337093347
Author:Barry J. Goodno, James M. Gere
Publisher:Cengage Learning

Engineering Mechanics: Statics
Mechanical Engineering
ISBN:9781118807330
Author:James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:WILEY
Related Questions
- I need help solving these 3 simple parts, if you can not answer all 3 parts then please leave it for another tutor, thank you.arrow_forwardCould you please explain where and what is tight side and also how to find 5-9arrow_forwardGiven the removal and replacement time data in the table, calculate IMART (mean time to repair) Part identity Bolts Earth strap Power lead Signal lead Cover plate Brushes Lesson 1.2 HW#1 Quantity Failure rate x 10-4 (h) Total M task time (h) 3 0.20 1 0.10 0.36 0.10 0.26 0.35 2 0.46 0.12 0.36 1.16 1.05 23.6arrow_forward
- 00 T R %24 Bb R V qa du/webapps/assessment/take/launch.jsp?course_assessment_id%=_254968_1&course_id%3D 3565256_1&content id= 52826 * Question Completion Status: Attach File Browse Local Files Browse Content Collection QUESTION 2 A company needs to choose one supplier for a particular type of silicon wafer used'in the production of semiconductors. The company has three options. Supplier A sells the silicon wafers for $2.50 per wafer, independently of the number of wafers ordered. Supplier B sells the wafers for $2.40 each but does not consider an order for less than 2,000 wafers. Supplier C sells the wafers for $2.30 each but does not accept an order for less than 3,000 wafers. Assume an order setup cost of $100 and an annual requirement of 20,000 wafers. Assume a 20% annual interest rate for holding cost calculations. a. Which supplier should be chosen to minimize the total annual cost for the wafers, and what is the optimal order quantity? b. If the replenishment lead time for wafers…arrow_forwardDon't use chatgpt will upvotearrow_forwardPls Comment on the use of layout and other elements in the washing machine control panel. If errors occur based on this layout, walk through the accident scenario. Suggest potential ways of improving the interface to avoid a similar problem occurring.arrow_forward
- can you please find the solution for this?arrow_forwardWhat’s the the answer pleasearrow_forwardSelect all the factors that affect the choice of sensor for level measurement? 0ptions: direct or indirect corrosiveness liquid temperature and pressure turbulence particulate in a liquid free flowing solids volatility single or continuous point measurementsarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Elements Of ElectromagneticsMechanical EngineeringISBN:9780190698614Author:Sadiku, Matthew N. O.Publisher:Oxford University PressMechanics of Materials (10th Edition)Mechanical EngineeringISBN:9780134319650Author:Russell C. HibbelerPublisher:PEARSONThermodynamics: An Engineering ApproachMechanical EngineeringISBN:9781259822674Author:Yunus A. Cengel Dr., Michael A. BolesPublisher:McGraw-Hill Education
- Control Systems EngineeringMechanical EngineeringISBN:9781118170519Author:Norman S. NisePublisher:WILEYMechanics of Materials (MindTap Course List)Mechanical EngineeringISBN:9781337093347Author:Barry J. Goodno, James M. GerePublisher:Cengage LearningEngineering Mechanics: StaticsMechanical EngineeringISBN:9781118807330Author:James L. Meriam, L. G. Kraige, J. N. BoltonPublisher:WILEY

Elements Of Electromagnetics
Mechanical Engineering
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Oxford University Press

Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:9780134319650
Author:Russell C. Hibbeler
Publisher:PEARSON

Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:9781259822674
Author:Yunus A. Cengel Dr., Michael A. Boles
Publisher:McGraw-Hill Education

Control Systems Engineering
Mechanical Engineering
ISBN:9781118170519
Author:Norman S. Nise
Publisher:WILEY

Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:9781337093347
Author:Barry J. Goodno, James M. Gere
Publisher:Cengage Learning

Engineering Mechanics: Statics
Mechanical Engineering
ISBN:9781118807330
Author:James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:WILEY