Report
Review Test Submission: Chapter 06 Test User Rashad Ladson Course Print Reading-Construction 2023FA.BPR.130 Test Chapter 06 Test Started 10/7/23 10:51 AM Submitted 10/7/23 12:21 PM Due Date 10/11/23 11:59 PM Status Completed Attempt Score 54 out of 60 points Time Elapsed 1 hour, 30 minutes out of 1 hour and 30 minutes Results Displayed Submitted Answers, Correct Answers, Feedback, Incorrectly Answered Questions Question 1 1 out of 1 points Polymer trim members are attached to a building using mastic and mechanical fasteners. Selected Answer: True Correct Answer: True Question 2 1 out of 1 points Plan North is based on the exact compass bearing of the job site. Selected Answer: False Correct Answer: False Question 3 1 out of 1 points A(n) __________ is an enclosure in a structure that allows for the placement of piping, conduit, and wiring f Selected Answer: chase Correct Answer: Evaluation Method Correct Answer Exact Match chase Question 4 1 out of 1 points The abbreviation "NIC" means __________. Selected Answer: not included in the contract Correct Answer: not included in the contract Question 5
1 out of 1 points An undercut and a(n) __________ on the underside of a sill prevent water from flowing back against the wall s Selected Answer: drip Correct Answer: Evaluation Method Correct Answer Exact Match drip Pattern Match (?i)drip([ -]edge)? Question 6 1 out of 1 points FSK insulation is a type of spray-on foam insulation. Selected Answer: False Correct Answer: False Question 7 1 out of 1 points The central portion of a tray ceiling is constructed at the same pitch as the roof rafters. Selected Answer: False Correct Answer: False Question 8 1 out of 1 points A(n) __________ mitre is a type of joint used at the outside corners of adjoining members in which the corners Selected Answer: quirk Correct Answer: Evaluation Method Correct Answer Exact Match quirk Pattern Match (?i)quirk([ -]mitre)? Question 9 1 out of 1 points A(n) __________ door is a door that swings in two directions. Selected Answer: double acting Correct Answer: Evaluation Method Correct Answer Exact Match double-acting Pattern Match (?i)double[ -]acting Question 10 1 out of 1 points
A fireblock is installed between studs, joists, or trusses to restrict air movement and reduce the spread of fire within walls. Selected Answer: True Correct Answer: True Question 11 1 out of 1 points The electric service enters the __________ side of the building. Refer to plans for the Shaw Place Condominiums - Sheet A1.1. Selected Answer: north Correct Answer: Evaluation Method Correct Answer Exact Match north Question 12 1 out of 1 points Eighteen downspouts are indicated on the Site Plan. Refer to plans for the Shaw Place Condominiums - Sheet A1.1. Selected Answer: True Correct Answer: True Question 13 1 out of 1 points An underground electrical transformer is located on the east side of the building. Refer to plans for the Shaw Place Condominiums - Sheet A1.1. Selected Answer: False Correct Answer: False Question 14 1 out of 1 points The Shaw Place Condominiums prints are based on the 2000 International Building Code. Refer to plans for the Shaw Place Condominiums - Sheet A1.1. Selected Answer: False Correct Answer: False Question 15 1 out of 1 points The east property line is __________' long. Refer to plans for the Shaw Place Condominiums - Sheet A1.1.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Selected Answer: 172.65 Correct Answer: Evaluation Method Correct Answer Exact Match 172.65 Pattern Match (?i)172.65('|\s?(ft|ft.|feet))? Question 16 1 out of 1 points The gas main is installed under Topton Way. Refer to plans for the Shaw Place Condominiums - Sheet A1.1. Selected Answer: True Correct Answer: True Question 17 1 out of 1 points The plans show new 6" PVC storm sewer lateral with a 2% minimum slope. Refer to plans for the Shaw Place Condominiums - Sheet A1.1. Selected Answer: True Correct Answer: True Question 18 1 out of 1 points One new manhole is to be installed at the southwest corner of the building lot. Refer to plans for the Shaw Place Condominiums - Sheet A1.1. Selected Answer: False Correct Answer: False Question 19 1 out of 1 points The exterior finish of the south foundation wall is __________. Refer to plans for the Shaw Place Condominiums - Sheet A1.3. Selected Answer: brick veneer Correct Answer: Evaluation Method Correct Answer Exact Match brick veneer Question 20 1 out of 1 points Concrete-filled bollards are installed 1'-0" inside and 1'-0" outside the overhead door opening.
Refer to plans for the Shaw Place Condominiums - Sheet A1.3. Selected Answer: True Correct Answer: True Question 21 1 out of 1 points A(n) __________" cleanout is provided at the base of the downspouts. Refer to plans for the Shaw Place Condominiums - Sheet A1.3. Selected Answer: 3 Correct Answer: Evaluation Method Correct Answer Exact Match 3 Pattern Match (?i)3("|\s?(in|in.|inch|inches))? Pattern Match (?i)three(\s(in|in.|inch|inches))? Question 22 1 out of 1 points The width of the rough opening for the overhead door is __________. Refer to plans for the Shaw Place Condominiums - Sheet A1.3. Selected Answer: 16'4" Correct Answer: Evaluation Method Correct Answer Exact Match 16'-4" Pattern Match 16'[\s-]?4" Pattern Match (?i)16\s?(ft|ft.|feet)[\s-]4\s?(in|in.|inch| Pattern Match (?i)sixteen\s(ft|ft.|feet)[\s- ]four\s(in|in.|inch|inches) Question 23 1 out of 1 points Storage lockers are __________' deep. Refer to plans for the Shaw Place Condominiums - Sheet A1.3. Selected Answer: 3 Correct Answer: Evaluation Method Correct Answer Exact Match 3 Pattern Match (?i)3('|\s?(ft|ft.|feet))? Pattern Match (?i)three(\s(ft|ft.|feet))? Question 24 1 out of 1 points
The finished floor elevation at the floor drain in the Trash Room is 90'-6". Refer to plans for the Shaw Place Condominiums - Sheet A1.3. Selected Answer: True Correct Answer: True Question 25 1 out of 1 points The west Garage wall is 8" thick cast-in-place concrete. Refer to plans for the Shaw Place Condominiums - Sheet A1.3. Selected Answer: False Correct Answer: False Question 26 0 out of 1 points The concrete beams above the interior columns are __________ wide. Refer to plans for the Shaw Place Condominiums - Sheet A1.3. Selected Answer: 1'6" Correct Answer: Evaluation Method Correct Answer Exact Match 3'-0" Pattern Match 3'([\s-]?0")? Pattern Match (?i)3\s?(ft|ft.|feet)([\s- ]0\s?(in|in.|inch|inches))? Pattern Match three\s(ft|ft.|feet)([\s- ]zero\s(in|in.|inch|inches))? Question 27 1 out of 1 points The door from the Den/Study leading into Stairway 2B measures __________. Refer to plans for the Shaw Place Condominiums - Sheet A1.11. Selected Answer: 3'x7' Correct Answer: Evaluation Method Correct Answer Exact Match 3'-0" x 7'-0" Pattern Match (?i)3('|\s?(ft|ft.|feet))([\s- ]?0("|\s?(in|in.|inch|inches)))?\s?(x|\*|by)\s?7('|\s ]?0("|\s?(in|in.|inch|inches)))? Pattern Match (?i)three\s(ft|ft.|feet)([\s- ]zero\s(in|in.|inch|inches))?\s?(x|\*|by)\s?seven\s ]zero\s(in|in.|inch|inches))? Question 28
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
1 out of 1 points A __________ door is installed between the Laundry and Utility rooms. Refer to plans for the Shaw Place Condominiums - Sheet A1.11. Selected Answer: pocket Correct Answer: pocket Question 29 1 out of 1 points The interior faces of the Terrace 2 walls are finished with __________. Refer to plans for the Shaw Place Condominiums - Sheet A1.11. Selected Answer: exterior insulation and finish system Correct Answer: exterior insulation and finish system Question 30 1 out of 1 points __________ crown molding is installed in the Bathroom between Bedroom 2 and the Den/Study. Refer to plans for the Shaw Place Condominiums - Sheet A1.11. Selected Answer: CM3 Correct Answer: CM3 Question 31 1 out of 1 points The towel bars are to be installed __________" above the finished floor. Refer to plans for the Shaw Place Condominiums - Sheet A1.11. Selected Answer: 54" Correct Answer: Evaluation Method Correct Answer Exact Match 54 Pattern Match (?i)54("|\s?(in|in.|inch|inches))? Pattern Match (?i)fifty[\s-]?four(\s(in|in.|inch|inches)) Question 32 1 out of 1 points The doors leading to Terrace 3 are __________ doors.
Refer to plans for the Shaw Place Condominiums - Sheet A1.11. Selected Answer: Type M exterior Correct Answer: Type M exterior Question 33 1 out of 1 points The overall width of the fireplace in the Great Room is __________. Refer to plans for the Shaw Place Condominiums - Sheet A1.11. Selected Answer: 7' 2.75" Correct Answer: Evaluation Method Correct Answer Exact Match 7'-2 3/4" Pattern Match (?i)7('|\s?(ft|ft.|feet))[\s-]?(2 3/4|2.75)("|\s?(in|in.|inch|inches)) Question 34 1 out of 1 points The ceiling height of the dormers is __________. Refer to plans for the Shaw Place Condominiums - Sheet A1.11. Selected Answer: 9'-0" Correct Answer: 9'-0" Question 35 1 out of 1 points The scupper opening is 4" high. Refer to plans for the Shaw Place Condominiums - Sheet A1.12. Selected Answer: False Correct Answer: False Question 36 1 out of 1 points Regarding the Roof Plan, __________. Refer to plans for the Shaw Place Condominiums - Sheet A1.12. Selected Answer: 5" gutters are to be installed along the upper edge of the roof openings for the terraces Correct Answer:
5" gutters are to be installed along the upper edge of the roof openings for the terraces Question 37 1 out of 1 points A standing seam copper roof is to be installed on the east side of the building. Refer to plans for the Shaw Place Condominiums - Sheet A1.12. Selected Answer: False Correct Answer: False Question 38 1 out of 1 points The size of the gas furnace flue is 2" x 18". Refer to plans for the Shaw Place Condominiums - Sheet A1.12. Selected Answer: False Correct Answer: False Question 39 1 out of 1 points The 1" x 12" vent slots in the roof rafters are located 8" from the roof ridge. Refer to plans for the Shaw Place Condominiums - Sheet A1.12. Selected Answer: True Correct Answer: True Question 40 1 out of 1 points Regarding the A.C. Mounting above Elevator Detail, __________. Refer to plans for the Shaw Place Condominiums - Sheet A1.12. Selected Answer: an extra layer of roofing is to be installed below the 4 x 4 supports Correct Answer: an extra layer of roofing is to be installed below the 4 x 4 supports Question 41 1 out of 1 points According to elevation 3/A2.1, __________ railings are to be installed. Refer to plans for the Shaw Place Condominiums - Sheet A2.1 and A3.2. Selected Answer: wrought iron Correct Answer:
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
wrought iron Question 42 1 out of 1 points The subfloor is __________" CDX plywood. Refer to plans for the Shaw Place Condominiums - Sheet A2.1 and A3.2. Selected Answer: 3/4" Correct Answer: Evaluation Method Correct Answer Exact Match 3/4 Pattern Match (?i)(3/4|0?\.75)("|\s?(in|in.|inch|inches Question 43 1 out of 1 points A(n) __________ provides a transition between the stone veneer and brick veneer exterior wall finishes. Refer to plans for the Shaw Place Condominiums - Sheet A2.1 and A3.2. Selected Answer: stone belt Correct Answer: Evaluation Method Correct Answer Exact Match stone belt Question 44 1 out of 1 points The ceiling joists for the penthouse level are 2 x 6s spaced __________" OC. Refer to plans for the Shaw Place Condominiums - Sheet A2.1 and A3.2. Selected Answer: 24 Correct Answer: Evaluation Method Correct Answer Exact Match 24 Pattern Match (?i)24("|\s?(in|in.|inch|inches))? Pattern Match (?i)twenty[\s-]?four(\s(in|in.|inch|inche Question 45 1 out of 1 points The outside faces of exterior foundation walls that extend below grade are to receive a coating of __________. Refer to plans for the Shaw Place Condominiums - Sheet A2.1 and A3.2. Selected Answer: dampproofing material Correct Answer:
dampproofing material Question 46 1 out of 1 points Ceilings in the Shaw Place Condominiums are __________" gypsum board. Refer to plans for the Shaw Place Condominiums - Sheet A2.1 and A3.2. Selected Answer: 5/8 Correct Answer: 5/8 Question 47 1 out of 1 points The ¾" x 11¼" gutter boards are to be painted. Refer to plans for the Shaw Place Condominiums - Sheet A4.1 and A4.2. Selected Answer: True Correct Answer: True Question 48 1 out of 1 points The main entry door header is reinforced with two ⅝" diameter steel rebar. Refer to plans for the Shaw Place Condominiums - Sheet A4.1 and A4.2. Selected Answer: True Correct Answer: True Question 49 1 out of 1 points A(n) __________ is cut at all outside corners of the stone veneer. Refer to plans for the Shaw Place Condominiums - Sheet A4.1 and A4.2. Selected Answer: quirk mitre Correct Answer: Evaluation Method Correct Answer Exact Match quirk mitre Question 50 1 out of 1 points Twelve-inch concrete block are installed between the main entry header and stone belt. Refer to plans for the Shaw Place Condominiums - Sheet A4.1 and A4.2. Selected Answer: True Correct Answer: True
Question 51 1 out of 1 points The stone main entry sill is level in both directions. Refer to plans for the Shaw Place Condominiums - Sheet A4.1 and A4.2. Selected Answer: False Correct Answer: False Question 52 0 out of 1 points Gypsum board used to finish the ceiling drywall is attached directly to the wooden floor trusses with drywall screws and mastic. Refer to plans for the Shaw Place Condominiums - Sheet A4.1 and A4.2. Selected Answer: True Correct Answer: False Question 53 1 out of 1 points The abbreviation "RC" referring to lights indicates that __________ lights are to be installed. Refer to plans for the Shaw Place Condominiums - Sheet A5.1. Selected Answer: Recessed Correct Answer: Evaluation Method Correct Answer Exact Match recessed can Pattern Match (?i)recessed([\s-]cans?)? Question 54 1 out of 1 points The typical tread width for the front stairway is __________". Refer to plans for the Shaw Place Condominiums - Sheet A5.1. Selected Answer: 11 Correct Answer: Evaluation Method Correct Answer Exact Match 11 Pattern Match (?i)11("|\s?(in|in.|inch|inches))? Pattern Match (?i)eleven(\s(in|in.|inch|inches))? Question 55 1 out of 1 points The typical handrail height from the front of each tread is __________.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Refer to plans for the Shaw Place Condominiums - Sheet A5.1. Selected Answer: 3'-0" Correct Answer: 3'-0" Question 56 1 out of 1 points The width of the rough framing for stairways is __________. Refer to plans for the Shaw Place Condominiums - Sheet A5.1. Selected Answer: 3'8" Correct Answer: Evaluation Method Correct Answer Exact Match 3'-8" Pattern Match 3'[\s-]?8" Pattern Match (?i)3('|\s?(ft|ft.|feet))[\s- ]8("|\s?(in|in.|inch|inches)) Pattern Match (?i)three\s(ft|ft.|feet)[\s- ]eight\s(in|in.|inch|inches) Question 57 0 out of 1 points Brackets supporting the 1¾" diameter oak handrail are to be spaced __________' OC maximum. Refer to plans for the Shaw Place Condominiums - Sheet A5.1. Selected Answer: [None Given] Correct Answer: Evaluation Method Correct Answer Exact Match 4 Pattern Match (?i)4('|\s?(ft|ft.|feet))? Pattern Match (?i)four(\s(ft|ft.|feet))? Question 58 0 out of 1 points The exposed portion of the ship's ladder below the treads that is visible when ascending the stair is finished with __________. Refer to plans for the Shaw Place Condominiums - Sheet A5.1. Selected Answer: yellow pine Correct Answer: birch plywood Question 59 0 out of 1 points
Regarding the North/South Penthouse Master Bath Elevation, __________. Refer to plans for the Shaw Place Condominiums - Sheet A5.4. Selected Answer: [None Given] Correct Answer: the opening for the shower door is 8'-0" high Question 60 0 out of 1 points Regarding the Unit "D" Master Bath Elevation, __________. Refer to plans for the Shaw Place Condominiums - Sheet A5.4. Selected Answer: [None Given] Correct Answer: the top of the shower door is 7'-1" above the finished floor Saturday, October 7, 2023 12:34:59 PM EDT