Review Test Submission: F103B Quiz Attempt Score 100 out of 100 points Time Elapsed 9 minutes Instructions This is an achievement-type test ending the lesson. After taking this test you may still review any section. Read each question and the answers carefully and select the best answer or answers. You may change your answer as many times as needed before continuing. When partial credit is awarded in a multiple-answer question, you will receive feedback for any incorrect answers. Click the Save Answer button to advance to the next question. This Test allows multiple attempts; currently, you may take this test up to three (3) times. The highest score will be recorded. This Test can be saved and resumed later. The Back arrow will not be available in this test. All submitted answers are final! Results Displayed Submitted Answers, Feedback Question 1 10 out of 10 points The __________ considers "field" requirements, usually of a more urgent or rapid acquisition type of requirement. Selected Answer: C. AR2B Response Feedback: Correct. Question 2 10 out of 10 points The purpose of milestone B is to authorize entry into the ___________ phase. Selected Answer: C. Engineering and manufacturing development (EMD) phase Response Feedback: Correct.
Question 3 10 out of 10 points What phase produces an operational prototype? Selected Answer: B. Engineering and Manufacturing Development Response Feedback: Correct. Question 4 10 out of 10 points The __________ is a broad statement of functional required materiel capability (need) that can possibly support more than one developmental system. It summarizes the results of the Capabilities- Based Assessment (CBA) analysis. Selected Answer: B. Initial Capabilities Document (ICD) Response Feedback: Correct. Question 5 10 out of 10 points The ____ validates and prioritizes JCIDS documents for the Army. Selected Answer: A. Army Requirements Oversight Council (AROC) Response Feedback: Correct. Question 6 10 out of 10 points The __________ is the warfighter's primary means of defining authoritative, measurable, and/or testable capabilities for the Engineering and Manufacturing Development (EMD) phase of an acquisition program. Selected Answer: A. Capability Development Document (CDD) Response Feedback: Correct. Question 7 10 out of 10 points Which of the following is a correct statement about low-rate initial production (LRIP)?
Selected Answer: B. It ensures the manufacturer has the needed capacity, quantity, and efficiency needed for full rate production (FRP). Response Feedback: Correct. Question 8 10 out of 10 points What document is required from the Joint Capability and Integration Development System (JCIDS) process to enter into Defense Acquisition System (DAS)? Selected Answer: A. Initial capabilities document (ICD) Response Feedback: Correct. Question 9 10 out of 10 points The US Army current __________ is/are at the two-star general officer (GO) or civilian Senior Executive Service (SES) level of responsibility. Selected Answer: C. Program Executive Officers (PEOs) Response Feedback: Correct. Question 10 10 out of 10 points The Commanding General, Army Futures Command (AFC) reports through the _______________ to the Secretary of the Army. Selected Answer: B. Chief of Staff of the Army (CSA) Response Feedback: Correct.