1 Bid Proposal for the residential lands shown at Chapel Heath Student’s Name Professor’s Name Institute Name Date
2 Bid Proposal for the residential lands shown at Chapel Heath 1. Introduction a. Objective The objective of the report is to prepare a bid proposal for the residential lands at Chapel Heath, Navenby, Lincolnshire. There are important factors to take into account when preparing a bid for the residential land in Chapel Heath, Navenby, Lincolnshire. It is imperative to have comprehensive details regarding the property, such as its dimensions, terrain, and boundaries. A competitive bid is built on an understanding of zoning laws and planning permissions, as well as a market analysis and comparable sales research. The report also discusses the sustainability agenda along with the financial breakdown. b. Land details Navenby is located in the North Kesteven administrative district, about 10 kilometers south of Lincoln. With a land area of nearly 2,100 acres, the parish of Navenby is rural. It crosses Ermine Street, a Roman thoroughfare that connects York and London, and was constructed between 45 and 75 AD. The community is also traversed by the Viking Way, a 147-mile trail that connects Oakham, Rutland, and the Humber Bridge in Lincolnshire. There are numerous place names in the area that finish in -by, such as Navenby, which illustrates the Norse influence that existed in Lincolnshire throughout the ninth and tenth centuries. 2. Bid Proposal – Option A The key features of the construction of two plots of residential land at Chapel Heath, Navenby, Lincolnshire (without consideration of modern methods) are as follows,
3 a. General layout The apartment buildings have a particular design where each property has an open concept living, dining, and kitchen area, along with a ground floor bedroom with an ensuite bathroom and laundry. All site boundaries will be respected by the development, with the bottom floor having minimal building setbacks to boundaries as follows: The boundaries are as follows: o Front side: 9.2 m; o Eastern side: 2.2 m; o Rear: 5.56 m; o Western: 2.24 m (assumed). Every unit will have a separate entrance for cars and pedestrians. There aren't any official common spaces. At ground level, the site would occupy approximately 426.38 square meters, of which 206.5 would be covered by impermeable areas. (assumed). b. Slab & Concrete Evenly distributing home layups that are not placed on top of concrete wall slabs To maintain the earth in place, build concrete basement walls that are eight inches thick as needed. To build a concrete wall in the bedroom located in the basement (Assumed). c. Interior & Exterior Design All 2x2 framed cavities have R5 blown-in cellulose insulation; external framed walls have R21 blown-in cellular soundproofing. Inner walls devoid of insulation; R38 cellulose insulation is blown into the roof (Assumed).
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
4 The only exception to the fiber cement board lap siding covering all external walls is the floor. Shake shingle accents in fiber cement plank are installed on the roofline ends. d. Floor System, Door, and Shelves I-joists with HVAC chases or conventional framing should be used for the floor system between the main level and the basement. Knobs and handles are examples of traditional hardware. Passage locks should be installed elsewhere and security locks in every room. A standard external door deadbolt with a single key. There won't be wire shelving on the wardrobe shelves; instead, the wood will be painted or polished to match the decor. A Statement on Modern Methods of Construction A statement on Modern Methods of Construction involves the use of prefabrication and modular construction. Timelines for construction are greatly shortened by using contemporary building techniques like prefabrication and modular construction. MMC encourages accuracy and quality assurance, guaranteeing that every item satisfies strict requirements. This can improve the development's overall robustness and lifespan. A faster building schedule may enable an earlier start to the sale program, resulting in faster returns on investment. A statement on sustainable construction To lower total energy usage, install energy-efficient appliances, lighting, and HVAC systems.
5 To reduce water usage, install water-efficient appliances and low-flow plumbing fixtures. Reduce the need for heating and cooling systems by improving a building's thermal efficiency with the use of cutting-edge insulation materials. Bid Proposal – Option B The key features of the construction of two plots of residential land at Chapel Heath, Navenby, Lincolnshire (with consideration of modern methods) are as follows, e. General layout The apartment buildings have a particular design where each property has an open concept living, dining, and kitchen area, along with a ground floor bedroom with an ensuite bathroom and laundry. All site boundaries will be respected by the development, with the bottom floor having minimal building setbacks to boundaries as follows: The boundaries are as follows: o Front side: 9.2 m; o Eastern side: 2.2 m; o Rear: 5.56 m; o Western: 2.24 m (assumed). Every unit will have a separate entrance for cars and pedestrians. There aren't any official common spaces. Installation of energy-efficient appliances, lighting, and HVAC systems. At ground level, the site would occupy approximately 426.38 square meters, of which 206.5 would be covered by impermeable areas. (assumed). f. Slab & Concrete Evenly distributing home layups that are not placed on top of concrete wall slabs To maintain the earth in place, build concrete basement walls that are eight inches thick as needed.
6 To build a concrete wall in the bedroom located in the basement (Assumed). g. Interior & Exterior Design All 2x2 framed cavities have R5 blown-in cellulose insulation; external framed walls have R21 blown-in cellular soundproofing. Inner walls devoid of insulation; R38 cellulose insulation is blown into the roof. The only exception to the fiber cement board lap siding covering all external walls is the floor. Shake shingle accents in fiber cement plank are installed on the roofline ends. h. Floor System, Door, and Shelves I-joists with HVAC chases or conventional framing should be used for the floor system between the main level and the basement. Installation of water-efficient appliances and low-flow plumbing fixtures. Knobs and handles are examples of traditional hardware. Passage locks should be installed elsewhere and security locks in every room. A standard external door deadbolt with a single key. There won't be wire shelving on the wardrobe shelves; instead, the wood will be painted or polished to match the decor. Reduce the need for heating and cooling systems by improving a building's thermal efficiency with the use of cutting-edge insulation materials. Major Risk Factors
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
7 Major risk factors involve construction cost overruns, demand and acceptance in the market, and interest rate & and financing risks. Construction Cost Overruns : Justification: Using sustainable design elements and modern methods of construction (MMC) may require new materials and technology, which could result in cost uncertainty. Demand and Acceptance in the Market: Reasoning: It is important to see how the market responds to MMC and sustainable design. The marketability of the developed properties may suffer if there is less demand than expected for these qualities. Interest rate and financing risks: Reasoning: Variations in interest rates or difficulties obtaining advantageous financing arrangements may affect the project's financial viability. Conclusion The level of detail in the financial appraisal is calculated and assumed from the Building Cost Model available in the book “Spon’s Architect and Builder”, which describes the site layout, interior planning, and residential plan. The values are assumed from the Building Prices per square meter present in the book. The table describes the land price appraisal as well as assumptions. The construction costs for interior and external works are calculated separately and are given in the appendix, by using the elemental method for the estimation of cost (Spon’s, 2014). Appendix 1 – Residential Plot Plan for Heath Chapel
8 Table 1- Housing Plan Housing Asociation Development Unit Range Two storey housing m^2 770 detached m2 m^2 770 semi-detached m2 m^2 730 terraced m2 m^2 640 Three storey housing m^2 semi-detached m2 m^2 770 terraced m2 m^2 640 Table 2 – Site Planning Site Area Assumed for Residential Plots = 20,000 m^2 Quantity Unit Cost (Euro) Total General items 353,900 Performance Bond and Insurances item 25000 Site mobilization item 8 8,900 Site running costs 32 week 10,000 Ground Investigation 54,900 Trial pits and boreholes item 4,900 Laboratory analyses and sampling item 50,000 Geotechnical and specialist services 304,900 Bioremediation – mobilization item 10,000 Bioremediation – treatment 8000 m3 8,000 Stabilization and solidification – mobilization item 4,900 Stabilization and solidification – treatment 2,000 Demolition 100,000 General site clearance 20000 m² 0.50 20,000 Earthworks 2284200 General excavations 50000 m3 1.5 5,000 Extra over for hand excavation 200 m3 50 200 Breaking out tarmacadam surfaces 300 m3 4.9 300 Breaking out mass concrete 1000 m3 7.4 1,000 Breaking out reinforced concrete 800 m3 12.30 800 On-site material management 51800 m3 3.9 51,800 Trimming and preparation of excavated surfaces 20000 m² 0.5 20,000 Screening of excavated material 50,000 Crushing and screening of hard material 1,800 Disposal of tarmacadam off site including haulage 300 Disposal of non-hazardous material off site including haulage 6,000 Table 3 – Substructure Planning
9 Site Area Assumed for Residential Plots = 20,000 m^2 Quantity Unit Cost Substructure 225mm reinforced concrete ground slab; laser levelled; surface hardener; subbase; perimeter ground beam; lift pits 20000 m^2 45 In situ concrete pad foundations and ground 260 nr 1200 beams Allowance for foundations and retaining nr Walls to dock levellers 100 nr 1,800 100 nr 1800 Frame Steel propped portal frame, cold rolled purlin 20,000 m^2 44 sections, surface treatment, including decorations 7 Roof Composite roof panels; powder coated 20000 m^2 30 galvanized steel 70,000 m² 30 7000 m^2 33 Extra over for 10% rooflights 20000 6 Roof drainage generally; syphonic system Eaves/valley gutter; galvanized steel; insulation; stop ends 3100 m^2 130 Allowance for mansafe system, hatches and 80,000 access ladders 1 item 80,000 External walls, windows and doors Wall cladding system, composite panels and built-up cladding systems; mineral fibre insulation; polyester powder coating 5000 5 Table 4 – Interior Planning
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
10 Quantity Unit Cost Internal partitions and doors 140mm thick blockwork; head restraint; fire 700 55 stopping 700 m² 55 Doors; ironmongery (cost per leaf) 14 nr 550 14 550 Finishes Allowance for wall finishes generally, 2000 12 emulsion paint and ceramic tile (allowance based on floor area) Raised floor to office areas only; 150 cavity; 2000 15 fire barriers Ceramic tiles to reception and WCs 200 44 Vinyl sheet and skirtings to corridor areas 200 44 Suspended ceiling; mineral fibre tile in 1500 33 exposed lay in grid Extra for moisture-resistant tiles 300 m² 10 Fittings Allowance for open plan office fit-out to 1000 150 category B Allowance for kitchen fittings 1 item 9,000 9000 Allowance for reception fittings and features 1 item 42,500 42500 Allowance for matwells and frames 1 item 5,600 5600 Allowance for WC fittings 1 item 5,200 5200 Services installations Sanitary fittings generally 75 nr 420 20 420 Hot and cold water services. Disposal installations item 55,000 55000 Low temperature hot water heating 1000 27 Mechanical ventilation and comfort cooling 1000 11 Allowance for toilet and Lift Motor Room 1 27500 ventilation item 27,500 Gas and Electrical installation item 100,000 1 10000 Lighting and emergency lighting and References
11 Team, G. C. (2023). Modern Methods of Construction. Retrieved from https://www.goconstruct.org/educational-resources/learn-about-construction/modern- methods-of-construction / Spons (2014). Spon’s Architects and Builders Price Book. Routledge. https://www.routledge.com/Spons-Architects-and-Builders-Price-Book-2021/AECOM/p/book/ 9781003053675