Work Breakdown Structure

docx

School

London School of Business and Finance *

*We aren’t endorsed by this school

Course

MANAGERIAL

Subject

Industrial Engineering

Date

Nov 24, 2024

Type

docx

Pages

3

Uploaded by george2550

Report
1 Work Breakdown Structure Playground Renovation Project Student Name Course Name Professor Name December 19, 2022
2 Work Breakdown Structure 1. Initial phase (Construction perimeter wall) 1.1 Appoint Service provider 1.2 Estimate the all financial plans 1.2.1 Availability of resources and material 1.2.2 Build 1.3 Monitor and approve 2. Develop and Build and Set up benches 2.1 Availability of resources and build the benches 2.2 Create the arrangement 2.2.1 Sequencing benches 2.2.2 Receive and authenticate 2.3 Set-up 3. Place Supplementary swing sets 3.1 Purchase Swings 3.1.1 Make an arrangement area or place for every swing 3.2 Set up 4. Outside music and art segment 4.1 Paint and art area 4.1.1 Make an final arrangement document 4.1.2 Buy music 4.2 Place and set-up 5. Buying of playing equipment 5.1 Final list of finalized playing equipment 5.1.1 Inventory taking
3 5.1.2 Buying the material 5.2 Make an arrangement plan 5.3 Set-up on the selected area Work Breakdown Structure (WBS)
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help