Chapter D, Problem 1DQ
Summary Introduction
Interpretation: The information required to decide whether the management needs to rent a warehouse is to be determined. Also, the ways in which the linear programming model can be helpful is to be determined.
Concept Introduction:When there are more than two variables (behaving linearly) in a problem in which an objective function is to be optimized, the problem can be solved through linear programming. The solution will also indicate the critical and non-critical variables (called constraints). Thus the impact of any variation of the critical constraints can also be assessed.
Expert Solution & Answer
Answer to Problem 1DQ
The inferenceof not taking another warehouse on rent (at whatever rate) can be derived from this model.
Explanation of Solution
Given information:
- Three equal to or less than constraints.
- The two critical constraints of raw material and labour costs.
- Availability of a warehouse at cheap rates.
- The management needs to know whether storage space is a binding constraint. It is not, because the intersection of labour hours and raw materials is the optimal solution.
Want to see more full solutions like this?
Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
Trips Logistics, a third-party logistics firm that provides warehousing and other logistics services, is facing a decision regarding the amount of space to lease for the upcoming three-year period. The general manager has forecast that Trips Logistics will need to handle a demand of 100,000 units for each of the next three years. Historically, Trips Logistics has required 1,000 square feet of warehouse space for every 1,000 units of demand. For the purposes of this discussion, the only cost Trips Logistics faces is the cost for the warehouse. Trips Logistics receives revenue of $1.22 for each unit of demand. The general manager must decide whether to sign a three-year lease or obtain warehousing space on the spot market each year. The three-year lease will cost $1 per square foot per year, and the spot market rate is expected to be $1.20 per square foot per year for each of the three years. Trips Logistics has a discount rate of k = 0.1.
Pls help ASAP for both
The Seaside Hotel is a three-star hotel in Newquay, Cornwall. It contains 108 rooms and employs 30 fulltime and 40 parttime personnel. Between May and August, the hotel's workforce is nearly doubled by casual and temporary workers. Cornwall is a difficult place to do business, especially in the tourism industry. Business is highly seasonal with hotels experiencing very low occupancy during the offseason and many hotels choose not to operate during this time. The Seaside Hotel operates all year round by supplementing its tourism trade during the off-season by offering discounted conferencing facilities for local businesses and as a cheap base for corporate events and activities, such as team building weekends. Tourism is, however, vitally important for the region and its businesses and provides a significant proportion of all jobs in the South West. Cornwall can, however, be a difficult place in which to work. For instance, Newquay – Cornwall’s most popular holiday destination – is one…
Chapter D Solutions
OPERATIONS MANAGEMENT CUSTOM ACCESS
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Georgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Cabinetmaker 1 Cabinetmaker 2 Cabinetmaker 3 Hours required to complete all the oak cabinets 50 44 32 Hours required to complete all the cherry cabinets 61 46 34 Hours available 35 25 30 Cost per hour $36 $43 $56 For example, Cabinetmaker 1 estimates that it will take 50 hours to complete all the oak cabinets and 61 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 35 hours available for the final…arrow_forwardGeorgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Cabinetmaker 1 Cabinetmaker 2 Cabinetmaker 3 Hours required to complete all the oak cabinets 50 44 32 Hours required to complete all the cherry cabinets 61 46 34 Hours available 35 25 30 Cost per hour $36 $43 $56 For example, Cabinetmaker 1 estimates that it will take 50 hours to complete all the oak cabinets and 61 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 35 hours available for the final…arrow_forwardGeorgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Cabinetmaker 1 Cabinetmaker 2 Cabinetmaker 3 Hours required to complete all the oak cabinets 47 40 27 Hours required to complete all the cherry cabinets 64 51 36 Hours available 40 30 35 Cost per hour $34 $41 $52 For example, Cabinetmaker 1 estimates it will take 47 hours to complete all the oak cabinets and 64 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 40 hours available for the final…arrow_forward
- Georgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Hours required to complete all the oak cabinets Hours required to complete. all the cherry cabinets Hours available Cost per hour Min s.t. 01 Let O₁ O₂ 01 01 For example, Cabinetmaker 1 estimates it will take 50 hours to complete all the oak cabinets and 60 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 40 hours available for the final finishing operation. Thus, Cabinetmaker 1 can only complete 40/50 = 0.8, or 80%,…arrow_forwardc. If Cabinetmaker 1 has additional hours available, would the optimal solution change? If required, round your answers to three decimal places. If your answer is zero, enter "0". Explain. ✓ because Cabinetmaker 1 has dual value Yes ✓ of No -1.84 ✔ ✓ of Therefore, each additional hour of time for cabinetmaker 1 will reduce total cost by $ d. If Cabinetmaker 2 has additional hours available, would the optimal solution change? If required, round your answers to three decimal places. If your answer is zero, enter "0". Use a minus sign to indicate the negative figure. Explain. ✔ because Cabinetmaker 2 has a slack 1.84 ✔ per hour, up to a maximum of 30 X hours. Alternatively, the dual value is 50 ✓ hours. 0.00 ✓ which means that adding one hour to this constraint will decrease total cost by $ 0.00 ✓.arrow_forwardA manufacturing firm has four plants and wants to find the most efficient means of meeting the requirements of its four customers. The relevant information for the plants and customers, along with shipping costs in dollars per unit, are shown in the table below: Customer (requirement) Factory (capacity) Customer 1 (125) Customer 2 (150) Customer 3 (175) Customer 4 (75) A (100) $ 15 $ 10 $ 20 $ 17 B (75) $ 20 $ 12 $ 19 $ 20 C (100) $ 22 $ 20 $ 25 $ 14 D (250) $ 21 $ 15 $ 28 $ 12 How many supply nodes are present in this problem? Multiple Choice: 4 3 1 8 16arrow_forward
- A manufacturing firm has four plants and wants to find the most efficient means of meeting the requirements of its four customers. The relevant information for the plants and customers, along with shipping costs in dollars per unit, are shown in the table below: Customer (requirement) Factory (capacity) Customer 1 (125) Customer 2 (150) Customer 3 (175) Customer 4 (75) A (100) $ 15 $ 10 $ 20 $ 17 B (75) $ 20 $ 12 $ 19 $ 20 C (100) $ 22 $ 20 $ 25 $ 14 D (250) $ 21 $ 15 $ 28 $ 12 Note: This question requires Solver.Formulate the problem in Solver and find the optimal solution. What is the optimal quantity to ship from Factory B to Customer 3? Multiple Choice 25 units 50 units 75 units 100 units 125 unitsarrow_forwardA manufacturing firm has four plants and wants to find the most efficient means of meeting the requirements of its four customers. The relevant information for the plants and customers, along with shipping costs in dollars per unit, are shown in the table below: Customer (requirement) Factory (capacity) Customer 1 (125) Customer 2 (150) Customer 3 (175) Customer 4 (75) A (100) $ 15 $ 10 $ 20 $ 17 B (75) $ 20 $ 12 $ 19 $ 20 C (100) $ 22 $ 20 $ 25 $ 14 D (250) $ 21 $ 15 $ 28 $ 12 How many arcs will the network have?arrow_forwardFormulate but do not solve the problem.The management of Hartman Rent-A-Car has allocated $2.25 million to buy a fleet of new automobiles consisting of compact, intermediate-size, and full-size cars. Compacts cost $18,000 each, intermediate-size cars cost $27,000 each, and full-size cars cost $36,000 each. If Hartman purchases twice as many compacts as intermediate-size cars and the total number of cars to be purchased is 100, determine how many cars of each type will be purchased. (Assume that the entire budget will be used. Let x, y, and z denote the number of compact, intermediate-sized, and full-size cars purchased, respectively.) = 2,250,000 = x = 100arrow_forward
- 14arrow_forwardJerry Wei, the hospital administrator at St. Charles General, must appoint head nurses to four newly established departments: urology, cardiology, orthopedics, and obstetrics. In anticipation of this staffing problem, he had hired four nurses, considered their backgrounds, personalities, and talents, and developed a cost scale ranging from 0 to 100 to be used in the assignment. A 0 for a nurse being assigned to the cardiology unit implies that the nurse would be perfectly suited to that task. A value close to 100, on the other hand, would imply that he or she is not at all suited to head that unit. The accompanying table gives the complete set of cost figures that the hospital administrator feels represented all possible assignments. Which nurse should be assigned to which unit? Department Urology Cardiology Orthopedics 28 18 15 32 48 23 51 36 24 25 38 55 Determine the assignment of nurses. The total cost is (enter your response as a whole number). Nurse Kitty Forman Carol Hathaway…arrow_forwardA manufacturing firm has three plants and wants to find the most efficient means of meeting the requirements of its four customers. The relevant information for the plants and customers, along with shipping costs in dollars per unit, are shown in the table below: Customer (requirement) Factory (capacity) Customer 1 (25) Customer 2 (50) Customer 3 (125) Customer 4 (75) A (100) $ 15 $ 10 $ 20 $ 17 B (75) $ 20 $ 12 $ 19 $ 20 C (100) $ 22 $ 20 $ 25 $ 14 Note: This question requires Solver.Formulate the problem in Solver and find the optimal solution. What is the minimum total cost to meet all customer requirements?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,