Question
Book Icon
Chapter B, Problem 37P
Summary Introduction

To determine: The mix of class of containers will maximize the weekly profit.

Introduction:

Linear programming:

It is a linear optimization technique followed to develop the best outcome for the linear programming problem. The outcome might be to maximize profit, minimize cost, or to determine the optimal product mix. The outcome will take the constraints present in achieving the solution into consideration.

Blurred answer
Students have asked these similar questions
Sitka Industries uses a cost system that carries direct materials inventory at a standard cost. The controller has established these standards for one ladder (unit):   StandardQuantity x StandardPrice = StandardCost Direct materials 3 pounds   $4.50 per pound   $13.50    Direct labor 2.00 hours   12.00 per hour   24.00    Total cost         $37.50    Sitka Industries made 2,900 ladders in July and used 8,500 pounds of material to make these units. Sitka Industries bought 15,400 pounds of material in the current period. There was a $300 unfavorable direct materials price variance. Enter all amounts as positive numbers. A. How much in total did Sitka pay for the 15,400 pounds? B. What is the direct materials quantity variance? C. What is the total direct materials cost variance? D. What if 9,200 pounds were used to make these ladders, what would be the direct materials quantity variance? E. If there was a $340 favorable direct materials price variance, how much did Sitka pay…
In a large microelectronics plant, the assembly cell for circuitboards has a demand for 200 units an hour. Two feeder cellssupply parts A and B to the assembly cell (one A and one Bfor each board). Standard containers that look like dividedtrays are used. A container will hold 20 As or 10 Bs. It takes10 minutes to fill up a container with As and 20 minutes tofill up a container with Bs. Transit time to the assembly cell is5 minutes for both A and B. No safety factor is used. Set up akanban control system for the assembly process.
A tricycle factory uses 3 tires , 1 frame, and 2 pedals . If the factory. has available 270 tires, 90 frames, and 170 pedals , which item would limit the number of complete tricycles that can be assembled ? Explain your choice. A)tires.      B) frames     C) pedals       D) both tires and frames
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,