
Introduction:
Proper
The company aims to reach remote town in city A which is difficult due to the external reasons such as poor weather conditions, underdeveloped infrastructure system of the city and lack of man power to operate airports.
With the SABRE optimizing system, crew optimizer, tries to remove unwanted layovers and crew unproductive time and union restriction. Over 3,000 flight attendants and 1,500 pilots rank their preferred routing on monthly basis. Some pilots or flight attendants prefer taking challenging routes through city K, S, J, F, A and back to S which keeps them linked with the culture and local residents.
The company A airlines decided to test with a schedule in S to C route with crew restrictions on flying hours per day where the flight had crew layover previously at place C. The company analyst commented that running same crew for two 4-hours round trip had 98.7%, the crew would not time out.
To determine: The direct cost to the company A.

Want to see the full answer?
Check out a sample textbook solution
Chapter B Solutions
Operations Management: Sustainability and Supply Chain Management (12th Edition)
- Discuss how the article aligns with the concept: 1. The development of Legislative Health Policy 2. The Role of research in policy developmentarrow_forwardDiscuss how the article aligns with the concept: 1. The development of Legislative Health Policy 2. The Role of research in policy developmentarrow_forwardMcq question need ans.arrow_forward
- Say women on average take twice as long in the restroom (not including waiting times) than men. Is the 2:1 ration for flushing capacity the right ratio?arrow_forwardTo what extent does the equation for the waiting time in the queue help explain why queues for the Women's room might be longer than queues for the Men's room before 2005 in New York City?arrow_forwardBesides adding flushing capacity for the women's bathrooms versus men's bathrooms, what can be done to reduce waiting time for the restrooms?arrow_forward
- How does rework hurt a process? Give examples on how rework can hurt a process. Please provide a referencearrow_forwardHow does rework hurt a process? Give examples on how rework can hurt a process. Please provide a referencearrow_forwardWhat the different between a near miss and hazard 1. movement and contact 2. Contact 3. movementarrow_forward
- The fixed and variable costs for three potential manufacturing plant sites for a rattan chair weaver are shown: Site Fixed Cost Per Year Variable Cost per Unit 1 $700 $12.00 2 $1,000 $7.00 $2,200 $5.00 a) After rounding to the nearest whole number, site 1 is best below After rounding to the nearest whole number, site 2 is best between After rounding to the nearest whole number, site 3 is best above b) If the demand is 590 units, then the best location for the potent 3 units. and units. 600 0 60 units. g plant isarrow_forwardRefer to Table S6.1 - Factors for Computing Control Chart Limits (3 sigma) for this problem. Sampling 4 pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produced the following results: Hour R Hour X R Hour X R Hour X R 1 3.25" 0.71" 7 3.15" 0.58" 13 3.11" 0.85" 19 4.51" 1.56" 2 3.20 1.18 8 2.65 1.08 14 2.83 1.31 20 2.79 1.14 3 3.12 1.38 9 15 4. 3.39 1.31 10 5 2.97 1.17 6 2.76 0.32 3.02 0.71 3.12 1.01 2.75 1.33 16 2.74 0.50 22 11 2.73 1.17 17 2.76 1.43 23 12 2.87 0.45 18 2.64 1.24 21 2.75 1.03 3.18 0.46 2.94 1.53 24 2.54 0.97 Based on the sampling done, the control limits for 3-sigma x chart are (round all intermediate calculations to three decimal places before proceeding with further calculations): Upper Control Limit (UCL) = inches (round your response to three decimal places). Lower Control Limit (LCL) = inches (round your response to three decimal places). Based on the x-chart, the wire cutting process has been The control limits…arrow_forwardChoose a specific cars company. E.g Toyota, Volkswagen, Hyundai, Mercedes-Benz, BMW, Honda, Ford, Audi, Tesla Define a list of required machinery, equipment, workstations, offices, rest areas, materials, etc. Develop and define the location of machinery, equipment, workstations, offices, rest areas, materials. Make the distribution in the manufacturing facility the most efficient way possible. Develop a process distribution for one specific product. Explain why you consider this is the most efficient distribution for this specific manufacturing facility. demonstrate the benefits of optimizing a production line with the best distribution of its equipment and spaces. To be more productive and profitable.arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.





